| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 500 | CY |
$8.00 |
$8.00 |
$10.00 |
$7.11 |
$4.50 |
$7.38 |
$21.00 |
$15.00 |
$13.89 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$8.00 |
$9.00 |
$10.00 |
$17.54 |
$10.00 |
$17.00 |
$8.80 |
$18.00 |
$18.54 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 830 | LF |
$1.95 |
$1.25 |
$1.25 |
$2.11 |
$4.00 |
$1.25 |
$2.05 |
$2.00 |
$1.84 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 602 | LF |
$6.20 |
$6.50 |
$5.00 |
$9.48 |
$5.00 |
$6.50 |
$9.14 |
$8.00 |
$8.13 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 21,500 | SY |
$1.50 |
$1.27 |
$1.27 |
$1.45 |
$1.35 |
$1.27 |
$1.40 |
$1.50 |
$1.51 |
| 6 | 307(A) 4200 |
FLY ASH | 5,421 | TON |
$60.00 |
$56.00 |
$55.00 |
$50.00 |
$64.50 |
$60.15 |
$59.85 |
$55.00 |
$59.97 |
| 7 | 307(D) 4230 |
LIME | 272 | TON |
$110.00 |
$158.00 |
$140.00 |
$150.00 |
$160.00 |
$173.69 |
$153.30 |
$175.00 |
$183.02 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 100,374 | SY |
$2.15 |
$2.00 |
$2.10 |
$2.45 |
$2.35 |
$2.30 |
$2.13 |
$1.60 |
$1.61 |
| 9 | 307(G) 4260 |
LIME PRETREATMENT | 15,056 | SY |
$2.25 |
$1.40 |
$1.40 |
$0.6700 |
$1.65 |
$1.93 |
$2.15 |
$1.50 |
$1.53 |
| 10 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 515 | TON |
$25.00 |
$25.00 |
$32.00 |
$20.86 |
$28.00 |
$34.43 |
$22.60 |
$50.00 |
$26.55 |
| 11 | 407(B) 0250 |
TACK COAT | 15,544 | GAL |
$2.50 |
$2.25 |
$1.80 |
$3.25 |
$2.25 |
$4.19 |
$2.70 |
$2.10 |
$3.99 |
| 12 | 408 5774 |
PRIME COAT | 21,248 | GAL |
$3.00 |
$3.30 |
$2.25 |
$3.35 |
$5.00 |
$1.97 |
$5.10 |
$3.50 |
$4.12 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 40,344 | TON |
$55.00 |
$53.00 |
$55.20 |
$55.75 |
$55.35 |
$55.96 |
$54.85 |
$58.00 |
$59.92 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,548 | TON |
$60.00 |
$56.50 |
$58.50 |
$57.15 |
$60.30 |
$60.78 |
$60.20 |
$62.00 |
$66.16 |
| 15 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 37,656 | LF |
$0.1000 |
$0.0800 |
$0.0800 |
$0.1100 |
$0.0800 |
$0.1500 |
$0.1500 |
$0.1800 |
$0.2400 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$250.00 |
$250.00 |
$250.00 |
$342.17 |
$200.00 |
$250.00 |
$355.25 |
$400.00 |
$456.91 |
| 17 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 13 | EA |
$150.00 |
$200.00 |
$200.00 |
$212.70 |
$210.00 |
$200.00 |
$203.00 |
$200.00 |
$405.87 |
| 18 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 800 | SF |
$13.00 |
$20.00 |
$20.00 |
$21.27 |
$21.00 |
$20.00 |
$20.30 |
$20.00 |
$17.00 |
| 19 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,040 | LF |
$11.00 |
$8.00 |
$8.00 |
$8.51 |
$8.25 |
$8.00 |
$8.15 |
$8.00 |
$5.61 |
| 20 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 95,911 | LF |
$0.4000 |
$0.3700 |
$0.3700 |
$0.3900 |
$0.3900 |
$0.3700 |
$0.3800 |
$0.3700 |
$0.6400 |
| 21 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 120 | LF |
$3.00 |
$5.00 |
$5.00 |
$5.32 |
$5.32 |
$5.00 |
$5.10 |
$5.00 |
$3.83 |
| 22 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 23 | EA |
$100.00 |
$100.00 |
$100.00 |
$106.35 |
$106.45 |
$100.00 |
$101.50 |
$100.00 |
$66.95 |
| 23 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 536 | EA |
$0.5000 |
$0.7500 |
$0.7500 |
$0.8000 |
$0.8000 |
$0.7500 |
$0.8000 |
$0.7500 |
$0.6700 |
| 24 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 63,361 | LF |
$0.5000 |
$0.0800 |
$0.0800 |
$0.0900 |
$0.0900 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.2300 |
| 25 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,300 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$1.08 |
| 26 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,040 | SD |
$3.00 |
$0.3000 |
$0.3000 |
$0.3200 |
$0.3200 |
$0.3000 |
$0.3000 |
$0.3000 |
$1.29 |
| 27 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 780 | SD |
$2.00 |
$3.25 |
$3.25 |
$3.46 |
$3.46 |
$3.25 |
$3.30 |
$3.25 |
$1.80 |
| 28 | 880(C) 8848 |
WING BARRICADES | 520 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$1.03 |
| 29 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,820 | SD |
$0.5000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.8200 |
| 30 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 720 | SD |
$0.2000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.8800 |
| 31 | 880(F) 8878 |
DRUMS | 720 | SD |
$0.2500 |
$1.00 |
$1.00 |
$1.06 |
$1.06 |
$1.00 |
$1.02 |
$1.00 |
$0.8800 |
| 32 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 260 | SD |
$50.00 |
$3.00 |
$3.00 |
$3.19 |
$3.19 |
$3.00 |
$3.05 |
$3.00 |
$56.65 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$38,762.00 |
$19,000.00 |
$19,000.00 |
$35,000.00 |
$22,500.00 |
$10,000.00 |
$19,500.00 |
$35,000.00 |
$38,524.01 |
| 34 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$2,000.00 |
$3,500.00 |
$4,000.00 |
$5,500.00 |
$2,000.00 |
$2,060.00 |
$20,000.00 |
$3,605.00 |
| 35 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$8,125.00 |
$4,000.00 |
$2,500.00 |
$8,500.00 |
$3,375.00 |
$4,120.00 |
$5,000.00 |
$26,722.26 |
| 36 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$220,749.00 |
$179,450.00 |
$120,000.00 |
$200,000.00 |
$148,000.00 |
$226,000.00 |
$243,910.00 |
$228,000.00 |
$211,470.16 |