| 1 | 202(C) 0184 |
UNCLASSIFIED BORROW | 1,700 | CY |
$18.00 |
$16.00 |
$10.50 |
$20.00 |
$7.50 |
| 2 | 230(A) 2806 |
SOLID SLAB SODDING | 1,000 | SY |
$3.50 |
$5.00 |
$3.15 |
$3.30 |
$3.00 |
| 3 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 224 | TON |
$35.00 |
$41.00 |
$31.30 |
$43.00 |
$27.50 |
| 4 | 407 0250 |
TACK COAT | 191 | GAL |
$5.00 |
$6.00 |
$3.15 |
$5.60 |
$4.00 |
| 5 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 628 | TON |
$100.00 |
$98.00 |
$102.90 |
$110.00 |
$102.50 |
| 6 | 417 5267 |
COLD MILLING PAVEMENT | 4,350 | SY |
$5.00 |
$5.00 |
$3.41 |
$1.70 |
$3.50 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 35 | CY |
$334.00 |
$636.00 |
$420.00 |
$475.00 |
$575.00 |
| 8 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 2,400 | LF |
$4.00 |
$3.00 |
$3.15 |
$2.00 |
$2.50 |
| 9 | 619(C) 0924 |
SAWING PAVEMENT | 1,160 | LF |
$4.50 |
$2.00 |
$6.30 |
$4.35 |
$3.00 |
| 10 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 3,009 | LF |
$25.00 |
$15.00 |
$16.75 |
$16.00 |
$16.50 |
| 11 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 12 | EA |
$2,000.00 |
$1,300.00 |
$1,464.75 |
$1,500.00 |
$1,400.00 |
| 12 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 8 | EA |
$2,500.00 |
$2,100.00 |
$2,409.75 |
$2,400.00 |
$2,000.00 |
| 13 | 504(A) 1304 |
APPROACH SLAB | 182.3 | SY |
$150.00 |
$175.00 |
$210.00 |
$144.00 |
$200.00 |
| 14 | 504(C) 6250 |
SEALED EXPANSION JOINT | 78 | LF |
$260.00 |
$80.00 |
$251.58 |
$290.00 |
$250.00 |
| 15 | 504(F) 6190 |
42" F-SHAPED PARAPET | 345 | LF |
$95.00 |
$77.00 |
$85.16 |
$85.00 |
$80.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$4.00 |
$1.50 |
$9.24 |
$14.00 |
$10.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 138 | CY |
$550.00 |
$538.00 |
$668.33 |
$675.00 |
$650.00 |
| 18 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 41,000 | LB |
$1.50 |
$1.20 |
$0.9800 |
$1.00 |
$1.00 |
| 19 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$14,175.00 |
$17,000.00 |
$15,000.00 |
| 20 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$4,500.00 |
$2,000.00 |
$953.40 |
$10,000.00 |
$2,000.00 |
| 21 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 169 | SY |
$4.50 |
$6.00 |
$3.15 |
$5.00 |
$5.00 |
| 22 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 60 | SY |
$522.00 |
$300.00 |
$485.10 |
$600.00 |
$575.00 |
| 23 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 152 | LF |
$6.00 |
$4.00 |
$4.31 |
$3.30 |
$4.00 |
| 24 | 523(B) 6560 |
(SP) SEALER RESIN | 1.7 | GAL |
$135.00 |
$123.00 |
$157.50 |
$110.00 |
$200.00 |
| 25 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$52,000.00 |
$103,115.25 |
$45,000.00 |
$118,750.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 182.3 | SY |
$150.00 |
$175.00 |
$210.00 |
$150.00 |
$200.00 |
| 27 | 504(C) 6250 |
SEALED EXPANSION JOINT | 78 | LF |
$260.00 |
$80.00 |
$251.58 |
$285.00 |
$250.00 |
| 28 | 504(F) 6190 |
42" F-SHAPED PARAPET | 345 | LF |
$95.00 |
$77.00 |
$85.16 |
$85.00 |
$80.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$4.00 |
$1.50 |
$9.24 |
$14.00 |
$10.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 138 | CY |
$550.00 |
$538.00 |
$668.33 |
$675.00 |
$650.00 |
| 31 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 41,000 | LB |
$1.50 |
$1.20 |
$0.9900 |
$1.00 |
$1.00 |
| 32 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$14,175.00 |
$25,000.00 |
$15,000.00 |
| 33 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$4,500.00 |
$1,500.00 |
$953.40 |
$10,000.00 |
$2,000.00 |
| 34 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 169 | SY |
$4.50 |
$6.00 |
$3.15 |
$5.00 |
$5.00 |
| 35 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 60 | SY |
$522.00 |
$300.00 |
$485.10 |
$600.00 |
$575.00 |
| 36 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 152 | LF |
$6.00 |
$4.00 |
$4.30 |
$3.30 |
$4.00 |
| 37 | 523(B) 6560 |
(SP) SEALER RESIN | 1.7 | GAL |
$135.00 |
$123.00 |
$157.50 |
$110.00 |
$200.00 |
| 38 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$52,000.00 |
$103,115.25 |
$45,000.00 |
$118,750.00 |
| 39 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$12,000.00 |
$20,000.00 |
$2,331.00 |
$35,000.00 |
$10,000.00 |
| 40 | 504(A) 1304 |
APPROACH SLAB | 197.8 | SY |
$150.00 |
$175.00 |
$210.00 |
$150.00 |
$200.00 |
| 41 | 504(C) 6250 |
SEALED EXPANSION JOINT | 85 | LF |
$260.00 |
$80.00 |
$251.58 |
$285.00 |
$250.00 |
| 42 | 504(F) 6190 |
42" F-SHAPED PARAPET | 405 | LF |
$75.00 |
$77.00 |
$68.10 |
$85.00 |
$75.00 |
| 43 | 506(A) 1322 |
STRUCTURAL STEEL | 2,300 | LB |
$4.00 |
$1.50 |
$9.24 |
$14.00 |
$8.00 |
| 44 | 509(A) 1326 |
CLASS AA CONCRETE | 184 | CY |
$550.00 |
$538.00 |
$668.33 |
$675.00 |
$650.00 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 54,000 | LB |
$1.50 |
$1.20 |
$0.9900 |
$1.00 |
$1.00 |
| 46 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$24,000.00 |
$20,627.25 |
$25,000.00 |
$15,000.00 |
| 47 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$4,500.00 |
$2,400.00 |
$1,575.00 |
$10,000.00 |
$2,000.00 |
| 48 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 197.6 | SY |
$4.50 |
$6.00 |
$3.15 |
$5.00 |
$5.00 |
| 49 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$522.00 |
$300.00 |
$485.10 |
$600.00 |
$575.00 |
| 50 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 83 | LF |
$6.00 |
$4.00 |
$4.31 |
$3.30 |
$4.00 |
| 51 | 523(B) 6560 |
(SP) SEALER RESIN | 1 | GAL |
$135.00 |
$123.00 |
$157.50 |
$110.00 |
$200.00 |
| 52 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$52,000.00 |
$117,547.50 |
$45,000.00 |
$125,000.00 |
| 53 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$12,000.00 |
$20,000.00 |
$2,331.00 |
$15,000.00 |
$10,000.00 |
| 54 | 504(A) 1304 |
APPROACH SLAB | 197.8 | SY |
$150.00 |
$175.00 |
$210.00 |
$150.00 |
$200.00 |
| 55 | 504(C) 6250 |
SEALED EXPANSION JOINT | 85 | LF |
$260.00 |
$80.00 |
$251.58 |
$285.00 |
$250.00 |
| 56 | 504(F) 6190 |
42" F-SHAPED PARAPET | 405 | LF |
$75.00 |
$77.00 |
$68.10 |
$85.00 |
$75.00 |
| 57 | 506(A) 1322 |
STRUCTURAL STEEL | 2,300 | LB |
$4.00 |
$1.50 |
$9.24 |
$14.00 |
$8.00 |
| 58 | 509(A) 1326 |
CLASS AA CONCRETE | 184 | CY |
$550.00 |
$538.00 |
$668.33 |
$675.00 |
$650.00 |
| 59 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 54,000 | LB |
$1.50 |
$1.20 |
$0.9900 |
$1.00 |
$1.00 |
| 60 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$24,000.00 |
$20,627.25 |
$25,000.00 |
$15,000.00 |
| 61 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$4,500.00 |
$2,400.00 |
$1,575.00 |
$5,000.00 |
$2,000.00 |
| 62 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 197.6 | SY |
$4.50 |
$6.00 |
$3.15 |
$5.00 |
$5.00 |
| 63 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$522.00 |
$300.00 |
$485.10 |
$580.00 |
$575.00 |
| 64 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 83 | LF |
$6.00 |
$4.00 |
$4.31 |
$3.30 |
$4.00 |
| 65 | 523(B) 6560 |
(SP) SEALER RESIN | 1 | GAL |
$135.00 |
$123.00 |
$157.50 |
$110.00 |
$200.00 |
| 66 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$52,000.00 |
$117,547.50 |
$35,000.00 |
$125,000.00 |
| 67 | 104 0900 |
RAILROAD FLAGGING | 320 | HOUR |
$122.50 |
$122.50 |
$131.25 |
$140.00 |
$200.00 |
| 68 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 3,032 | LF |
$8.00 |
$2.00 |
$3.15 |
$3.00 |
$2.00 |
| 69 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 2,632 | LF |
$35.00 |
$20.00 |
$13.13 |
$25.00 |
$15.00 |
| 70 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 16,000 | LF |
$0.6000 |
$1.20 |
$0.6400 |
$0.7000 |
$0.6500 |
| 71 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 960 | SD |
$10.00 |
$26.00 |
$5.25 |
$5.60 |
$5.25 |
| 72 | 876(C) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 8 | SD |
$150.00 |
$36.00 |
$94.50 |
$100.00 |
$95.00 |
| 73 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$65,000.00 |
$13,125.00 |
$14,000.00 |
$16,000.00 |
| 74 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$10.00 |
$40.00 |
$10.50 |
$11.20 |
$11.00 |
| 75 | 642 0098 |
STAKING | 1 | LSUM |
$50,000.00 |
$8,000.00 |
$57,960.00 |
$6,000.00 |
$6,562.50 |
| 76 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$100,000.00 |
$76,774.64 |
$125,000.00 |
$75,000.00 |