| 1 | 202(G) 0185 |
EARTHWORK | 1 | LSUM |
$12,000.00 |
$25,000.00 |
$20,000.00 |
| 2 | 222 2801 |
TEMPORARY BALE BARRIER | 100 | LF |
$4.00 |
$5.00 |
$3.00 |
| 3 | 223 2801 |
TEMPORARY SILT FENCE | 400 | LF |
$3.00 |
$2.00 |
$2.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 1,197 | SY |
$2.00 |
$3.00 |
$3.00 |
| 5 | 303 0192 |
AGGREGATE BASE | 433.7 | CY |
$35.00 |
$35.00 |
$48.00 |
| 6 | 325 5271 |
SEPARATOR FABRIC | 2,054 | SY |
$1.25 |
$1.00 |
$1.00 |
| 7 | 411(S2) 5930 |
(SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) | 374.1 | TON |
$60.00 |
$55.00 |
$85.00 |
| 8 | 411(S3) 5940 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 214.6 | TON |
$65.00 |
$60.00 |
$89.00 |
| 9 | 613(B) 0491 |
18" R.C.PIPE CLASS III | 66 | LF |
$45.00 |
$100.00 |
$62.00 |
| 10 | 613(C) 4373 |
SPECIAL END SECTION OF 18" RCP ROUND | 3 | EA |
$1,000.00 |
$800.00 |
$700.00 |
| 11 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 924.5 | SY |
$2.50 |
$5.00 |
$6.00 |
| 12 | 619(C) 0924 |
SAWING PAVEMENT | 40 | LF |
$4.00 |
$5.00 |
$5.00 |
| 13 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,818 | LF |
$0.7500 |
$2.00 |
$1.00 |
| 14 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 459 | CY |
$20.00 |
$8.00 |
$18.00 |
| 15 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 148 | CY |
$12.00 |
$20.00 |
$55.00 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 40 | CY |
$105.00 |
$100.00 |
$95.00 |
| 17 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 99.4 | LF |
$55.00 |
$70.00 |
$125.00 |
| 18 | 509(B) 1328 |
CLASS A CONCRETE | 287.1 | CY |
$400.00 |
$450.00 |
$535.00 |
| 19 | 511(A) 1332 |
REINFORCING STEEL | 44,656 | LB |
$0.7500 |
$1.00 |
$1.00 |
| 20 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 79.4 | TON |
$35.00 |
$35.00 |
$63.50 |
| 21 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 26.5 | TON |
$30.00 |
$30.00 |
$44.00 |
| 22 | 601(E) 6312 |
FILTER FABRIC (RIPRAP) | 84 | SY |
$5.00 |
$1.00 |
$5.00 |
| 23 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,000.00 |
$10,000.00 |
$18,000.00 |
| 24 | 623(A) 1418 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 175 | LF |
$18.00 |
$25.00 |
$18.00 |
| 25 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 3 | EA |
$2,500.00 |
$2,300.00 |
$3,500.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$1,500.00 |
$3,000.00 |
| 27 | 642 0098 |
STAKING | 1 | LSUM |
$3,000.00 |
$1,500.00 |
$9,500.00 |
| 28 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$19,500.00 |
$12,000.00 |