Bid tab 100058

Let Apr 15, 2010 · Division 8 · Creek Sign up free

‹ Apr 2010 results

INTERSECTION MODIFICATION AND TRAFFIC SIGNALS SH-97: AT THE TURNER TURNPIKE RAMPS.

Let date
Thursday, April 15, 2010
Contract
100058
J/P numbers
22927(04)
District
Division 8
County
Creek
Highway
Limits
INTERSECTION MODIFICATION AND TRAFFIC SIGNALS SH-97: AT THE TURNER TURNPIKE RAMPS.
Project number
STPY-119A(201)TR

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$132,557
1 TRAFFIC & LIGHTING SYSTEMS, LLC Low bidder $155,554 +17.3%
2 APAC-CENTRAL, INC. $171,081 +29.1% +10.0%
3 TRAFFIC SIGNALS, INC. $178,510 +34.7% +14.8%
4 Midstate Traffic Control, Inc. $195,270 +47.3% +25.5%

Bid tab: unit prices 54 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 TRAFFIC & LIGHT…#2 APAC-CENTRAL, I…#3 TRAFFIC SIGNALS…#4 Midstate Traffi…
1202(A) 0183 UNCLASSIFIED EXCAVATION180CY $15.00 $22.00 $23.71 $25.00 $30.00
2230(A) 2806 SOLID SLAB SODDING3,500SY $1.50 $3.03 $2.12 $3.20 $4.00
3303 5912 AGGREGATE BASE106TON $25.00 $46.20 $40.17 $40.00 $44.00
4319 5190 OPEN GRADED BITUMINOUS BASE47TON $45.00 $61.60 $129.94 $111.00 $132.00
5414(B) 0302 10" H.E.S. CONCRETE PAVEMENT205SY $90.00 $93.50 $114.10 $151.00 $180.00
6501(E) 6354 SELECT BACKFILL40CY $30.00 $19.80 $33.99 $60.00 $66.00
7609(A) 0380 CONCRETE CURB (8" BARRIER-INTEGRAL)208LF $3.75 $9.90 $4.31 $8.20 $10.00
8610(A) 0602 4" CONCRETE SIDEWALK90SY $35.00 $62.15 $108.09 $70.00 $80.00
9619(B) 4726 REMOVAL OF CURB AND GUTTER186LF $3.50 $4.40 $5.51 $5.00 $6.00
10619(B) 4727 REMOVAL OF CONCRETE PAVEMENT55SY $10.00 $7.04 $18.61 $12.00 $12.00
11619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,760SY $3.00 $5.78 $4.86 $8.00 $10.00
12619(C) 0924 SAWING PAVEMENT235LF $5.00 $2.48 $2.38 $3.40 $4.00
13627(P) 4425 RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER250LF $20.00 $27.50 $46.36 $50.00 $50.00
14871 8705 (PL)CONST.ZONE IMPACT ATTEN.20SD $15.00 $16.50 $16.75 $15.00 $40.00
15880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $7,500.00 $7,425.00 $7,539.34 $6,850.00 $6,500.00
16802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED55LF $4.60 $7.30 $8.15 $3.80 $4.00
17802(B) 8344 3" PVC SCH.40 PLASTIC CONDUIT BORED100LF $19.00 $17.53 $19.58 $19.00 $18.00
18802(B) 8346 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED195LF $8.00 $14.00 $15.64 $4.70 $10.00
19802(B) 8350 4" PVC SCH.40 PLASTIC CONDUIT TRENCHED50LF $10.00 $15.20 $16.98 $8.00 $12.00
20803 8065 PULL BOX(SIZE I)3EA $200.00 $262.50 $293.20 $265.00 $225.00
21803 8066 PULL BOX(SIZE II)1EA $250.00 $725.00 $809.79 $290.00 $250.00
22804(A) 2915 STRUCTURAL CONCRETE8.6CY $350.00 $412.50 $460.74 $520.00 $400.00
23804(B) 2916 REINFORCING STEEL1,270.9LB $1.00 $1.29 $1.44 $1.30 $1.00
24806(A) 8312 32'MH POLE 40'TS & 10'LMA(G.STL.)1EA $5,800.00 $5,274.40 $5,890.74 $6,712.00 $5,640.00
25806(A) 8726 POLE & 25' TS MST.ARM(G.STL.)1EA $2,800.00 $2,722.00 $3,040.31 $4,925.00 $2,830.00
26806(A) 8732 POLE & 40' TS MST.ARM(G.STL.)1EA $5,000.00 $2,425.60 $2,709.25 $4,673.00 $4,825.00
27806(B) 8894 10' MTG.HT.TS PED.POLE(G.STL.)1EA $400.00 $928.00 $1,036.52 $980.00 $600.00
28809(A) 8090 (PL)ROADWAY LUMINAIRE1EA $250.00 $389.30 $434.83 $355.00 $365.00
29810(A) 3118 SERVICE POLE1EA $1,200.00 $660.00 $737.18 $910.00 $250.00
30811 8040 1/C NO.6 ELECTRICAL CONDUCTOR200LF $1.00 $1.45 $1.62 $1.60 $1.00
31811 8044 1/C NO.10 ELECTRICAL CONDUCTOR570LF $0.5000 $0.6900 $0.7700 $0.7000 $0.4000
32825 8550 VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM1EA $11,500.00 $8,668.75 $9,682.47 $11,340.00 $9,100.00
33828 8132 (PL)DETECTION SYSTEM (VIDEO)1LSUM $20,000.00 $16,358.75 $18,271.73 $15,880.00 $16,170.00
34830 8000 PEDESTRIAN PUSH BUTTON4EA $125.00 $174.00 $194.35 $335.00 $200.00
35831 8231 1WAY 3SEC. ADJ. SIG. HD. S-65EA $550.00 $590.00 $658.99 $525.00 $544.00
36831 8286 1WAY 5SEC. ADJ. SIG. HD. S-192EA $850.00 $1,000.10 $1,117.05 $870.00 $905.00
37831 8295 1WAY 2SEC. ADJ. PED. SIG. HD. S-204EA $400.00 $440.50 $492.01 $355.00 $400.00
38833 3030 BACKPLATE7EA $70.00 $85.25 $95.22 $101.00 $70.00
39834(A) 8207 5/C TRAF.SIG.ELECT.CABLE760LF $0.7500 $1.15 $1.28 $1.05 $1.00
40834(A) 8208 7/C TRAF.SIG.ELECT.CABLE105LF $1.00 $1.38 $1.54 $1.20 $1.25
41834(A) 8213 21/C TRAF.SIG.EL.CABLE590LF $2.75 $3.34 $3.73 $2.55 $2.50
42834(B) 8220 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE25LF $0.7500 $0.7300 $0.8200 $0.8000 $1.00
43850(A) 8110 SHEET ALUMINUM SIGNS9SF $15.00 $16.50 $16.75 $15.00 $35.00
44850(C) 8118 MAST ARM MOUNTED SIGNS(ALUMINUM)30.75SF $26.00 $32.05 $35.80 $26.00 $35.00
45855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)1,290LF $0.5000 $1.10 $1.12 $1.00 $1.00
46855(A) 8814 TRAFFIC STRIPE(PLASTIC)(8" WIDE)60LF $1.10 $2.20 $2.23 $2.00 $1.75
47855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)345LF $4.00 $2.20 $2.23 $2.00 $6.00
48855(B) 8818 TRAFFIC STRIPE(PLASTIC)(ARROWS)4EA $75.00 $93.50 $94.94 $90.00 $85.00
49859(A) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)700LF $0.2000 $0.3900 $0.3900 $0.4000 $0.3500
50890(A) 8704 (PL)REMOVAL OF PULL BOX3EA $150.00 $30.00 $33.51 $80.00 $50.00
51890(A) 8724 (PL)REMOVAL OF EXISTING SIGNS2EA $30.00 $55.00 $55.85 $50.00 $25.00
52890A/B 8760 (PL)REMOVE & RESET GROUND MOUNTED SIGN1EA $195.00 $1,100.00 $1,116.94 $1,100.00 $1,200.00
53642 0098 STAKING1LSUM $500.00 $5,135.00 $4,378.40 $850.00 $3,000.00
54641 1552 MOBILIZATION1LSUM $5,000.00 $7,000.00 $4,418.48 $2,500.00 $6,000.00