| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$2,500.00 |
$14,300.00 |
$5,000.00 |
| 2 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$47,000.00 |
$34,000.00 |
$22,500.00 |
| 3 | 209 0120 |
MACHINE GRADING | 90 | STA |
$400.00 |
$460.00 |
$500.00 |
$250.00 |
| 4 | 223 2801 |
TEMPORARY SILT FENCE | 18,000 | LF |
$3.00 |
$1.77 |
$1.28 |
$2.00 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 392 | LF |
$8.00 |
$7.29 |
$8.00 |
$7.50 |
| 6 | 229 4318 |
DITCH LINER PROTECTION | 1,739 | LF |
$2.00 |
$1.04 |
$0.6500 |
$1.15 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 66,926 | SY |
$2.30 |
$1.35 |
$2.35 |
$1.40 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 14 | AC |
$600.00 |
$364.48 |
$500.00 |
$380.00 |
| 9 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 195 | TON |
$20.00 |
$30.34 |
$27.00 |
$28.30 |
| 10 | 411(S2) 5930 |
(SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) | 995 | TON |
$60.00 |
$58.78 |
$59.00 |
$84.15 |
| 11 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 5,694 | TON |
$65.00 |
$60.47 |
$56.81 |
$69.45 |
| 12 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 2,796 | TON |
$70.00 |
$72.10 |
$64.00 |
$75.35 |
| 13 | 417 5267 |
COLD MILLING PAVEMENT | 4,320 | SY |
$3.50 |
$2.90 |
$2.40 |
$6.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 103 | CY |
$250.00 |
$322.83 |
$423.70 |
$355.00 |
| 15 | 613(CC) 7186 |
TYPE A4 CULVERT END TREATMENT | 28 | EA |
$850.00 |
$499.86 |
$1,276.55 |
$550.00 |
| 16 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 668 | LF |
$35.00 |
$23.31 |
$26.30 |
$32.60 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,720.70 |
$9,510.00 |
$10,000.00 |
| 18 | 619(C) 0924 |
SAWING PAVEMENT | 46 | LF |
$3.00 |
$2.00 |
$4.00 |
$15.00 |
| 19 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 200 | LF |
$20.00 |
$15.62 |
$20.00 |
$16.50 |
| 20 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,400.00 |
$2,186.90 |
$2,500.00 |
$2,400.00 |
| 21 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$100.00 |
$57.28 |
$65.00 |
$60.00 |
| 22 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$150.00 |
$72.90 |
$80.00 |
$75.00 |
| 23 | 629(C) 4960 |
MAILBOX | 5 | EA |
$70.00 |
$26.04 |
$30.00 |
$30.00 |
| 24 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$25.00 |
$10.42 |
$14.00 |
$15.00 |
| 25 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$25.00 |
$14.58 |
$20.00 |
$15.00 |
| 26 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 24 | LF |
$14.00 |
$8.33 |
$10.00 |
$9.00 |
| 27 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 20 | EA |
$20.00 |
$18.75 |
$25.00 |
$20.00 |
| 28 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 36,071 | LF |
$0.7500 |
$0.3700 |
$0.4000 |
$0.4000 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$6,248.29 |
$7,000.00 |
$7,500.00 |
| 30 | 642 0098 |
STAKING | 1 | LSUM |
$5,000.00 |
$10,205.54 |
$5,000.00 |
$13,000.00 |
| 31 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,493.29 |
$3,600.00 |
$3,000.00 |
| 32 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,500.00 |
$34,151.56 |
$17,543.00 |
$2,500.00 |