Filtered by: Highway: SH-9 Clear all
| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 12, 2024 | 240199 STP-214F(161)3B | ClevelandMcclainOkfuskeePottawatomie+1 moreDivision 3 | CITY STREET (SHIELDS AVENUE)I-35I-44SH-102+4 more | Joint Seal/Repair I-35/I-44/SH-9A/SH-27/SH-84/SH-102/SH-270B/CITY STREET (SHIELDS AVENUE): AT MULTIPLE LOCATIONS IN DISTRICT III. | $346,274 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $392,189 · +13.3% | |
| Jan 9, 2025 | 250019 SSR-012N(114)SR | PottawatomieDivision 3 | SH-99 | Resurface (Asphalt) SH-99: FROM 0.1 MILES NORTH OF THE SEMINOLE COUNTY LINE, EXTEND NORTH NEAR PRAGUE. | $1,244,841 | Let | OVERLAND CORPORATION $1,131,261 · -9.1% | |
| Jan 16, 2025 | 250025 STP-208B(122)AD | CaddoDivision 7 | SH-9 (HAZLETT ST) | Pedestrian Improvements (Sidewalks) SH-9 (HAZLETT ST): FROM 1.37 MI. SOUTH OF THE SH-146 INTERSECTION, EXTEND NORTH IN FORT COBB. | $560,269 | Let | SAC Services, Inc. $423,810 · -24.4% | |
| Mar 13, 2025 | 250116 SSR-012N(118)SR | SeminoleDivision 3 | SH-99 | Resurface (Asphalt) SH-99: FROM 2.04 MILES NORTH OF US-270 (SH-9), EXTEND NORTH NEAR SEMINOLE. | $3,553,797 | Let | Silver Star Construction Company, Inc. $3,148,062 · -11.4% | |
| May 15, 2025 | 250147 SSP-262F(099)PM | ClevelandGarvinPontotocPottawatomieDivision 3 | I-35SH-9US-270 | Joint Seal And Repair I-35/ US-270/ SH-9: OVER WASHITA RIVER, OLD SH-18, US-77, AND BNSF RR, AT MULTIPLE LOCATIONS IN DIVISION III. | $518,729 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $537,176 · +3.6% | |
| Jun 12, 2025 | 250151 SSP-208F(136)PM | CaddoDivision 7 | SH-146SH-9US-62 | Joint Seal And Repair US-62/SH-9/SH-146: OVER HOG CREEK, WASHITA RIVER AND OVERFLOW, AND COBB CREEK AT MULTIPLE LOCATIONS IN DISTRICT VII. | $2,511,994 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $1,911,837 · -23.9% | |
| Jun 19, 2025 | 250046 STP-267C(118)PM | SeminoleDivision 3 | SH-9 | Resurface (Asphalt) SH-9: FROM 4.21 MILES WEST OF SH-56, EXTEND EAST NEAR SEMINOLE. | $1,330,641 | Let | THE CUMMINS CONSTRUCTION CO., INC. $1,294,381 · -2.7% | |
| Jun 19, 2025 | 250169 SSP-270F(058)PM | CimarronTexasDivision 6 | SH-171SH-95US-287US-64 | Bridge Water Proof Seal US-64/US-287/SH-95/SH-171: AT MULTIPLE LOCATIONS IN DISTRICT VI. | $233,433 | Let | LOGOS CONSTRUCTION CO., LLC $204,049 · -12.6% | |
| Oct 9, 2025 | 250285 SSP-262F(093)PM | JohnstonLincolnOkfuskeePontotocDivision 3 | SH-102SH-18SH-27SH-3W+2 more | Safety Improvement US-177/SH-3W/SH-18/SH-27/SH-99/SH-102: AT MULTIPLE LOCATIONS IN DISTRICT III. | $700,770 | Let | ACTION SAFETY SUPPLY CO., LLC $640,704 · -8.6% | |
| Oct 16, 2025 | 250310 STP-262N(103)UR | Pontotoc | SH-99 (MISSISSIPPI AVE) | Intersection Modification And Trafffic Signal SH-99 (MISSISSIPPI AVE): AT THE INTERSECTION OF SH-1 (ARLINGTON ST) IN THE CITY OF ADA. | — | Let | ||
| Nov 20, 2025 | 250248 TAP-214B(188)TP | ClevelandDivision 3 | SH-9 | Pedestrian And Bike Improvements SH-9: FROM 48TH ST, EXTEND EAST IN THE CITY OF NORMAN. | $2,063,523 | Let | Ellsworth Construction, LLC $1,616,427 · -21.7% | |
| Mar 12, 2026 | 260048 SSR-207C(136)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE US-69 JUNCTION, EXTEND EAST NEAR COLBERT AND ACHILLE. | — | Let | ||
| Mar 12, 2026 | 260049 SSR-207C(137)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT. | — | Let | ||
| Mar 12, 2026 | 260050 SSR-207C(136)SR / SSR-207C(137)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT AND ACHILLE. | — | Let | OVERLAND CORPORATION $4,164,235 · | |
| Mar 19, 2026 | 260068 STP-238B(103)AD | KiowaDivision 5 | SH-9 | Pedestrian Improvements (Sidewalks) SH-9: FROM 0.75 MILES WEST OF THE SH-44 INTERSECTION, EXTEND EAST IN LONE WOLF. | $829,184 | Let | Wyatt Contracting $758,580 · -8.5% | |
| Apr 9, 2026 | 260092 SSP-262F(108)PM | ClevelandHughesJohnstonLincoln+2 moreDivision 3 | INDIAN HILLS ROADOAK STSH-1SH-48+4 more | Joint Seal And Repair US-62/US-270/SH-1/SH-48/SH-78/SH-99/INDIAN HILLS ROAD/OAK ST: AT MULTIPLE LOCATIONS IN DISTRICT III. | $612,796 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $329,449 · -46.2% | |
| Apr 9, 2026 | 260093 SBR-264F(124)SB | AtokaChoctawPushmatahaDivision 2 | SH-2SH-43SH-93 | Bridge Rehabilitation SH-43/ SH-93/ SH-2: OVER BREAD TOWN CREEK, LONG CREEK, AND CRUM CREEK AT MULTIPLE LOCATIONS IN DISTRICT II. | $2,578,428 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $2,111,309 · -18.1% | |
| May 14, 2026 | 260163 STP-262N(103)UR | Pontotoc | SH-99 (MISSISSIPPI AVE) | Intersection Modification And Traffic Signal SH-99 (MISSISSIPPI AVE): AT THE INTERSECTION OF SH-1 (ARLINGTON ST) IN THE CITY OF ADA. | $5,429,772 | Let | SAC Services, Inc. $6,098,944 · +12.3% | |
| Jun 18, 2026 | 260144 STP-241B(195)PM | ClevelandDivision 3 | SH-9 | Grade, Drain, Bridge, And Surface SH-9: FROM 7.7 MILES EAST OF THE US-77 INTERCHANGE, EXTEND EAST IN THE CITY OF NORMAN. | — | Let | Haskell Lemon Group, LLC $33,388,900 · | |
| Jul 16, 2026 | 260180 STP-267C(123)PM | SeminoleDivision 3 | SH-9 | Resurface (Asphalt) SH-9: FROM THE US-270 JUNCTION, EXTEND EAST NEAR SEMINOLE. | $1,184,376 | Let | THE CUMMINS CONSTRUCTION CO., INC. $1,161,743 · -1.9% | |
| Sep 10, 2026 | 260219 HSIPG-299S(501)TR | CanadianClevelandGarvinKay+8 moreDivision 4 | I-240I-35I-40I-44+5 more | Pavement Markings SH-9/SH-18/SH-51/SH-76/US-81/I-35/I-40/I-44/I-240: AT MULTIPLE LOCATIONS IN DISTRICT III AND IV. | $1,707,518 | Let | ACTION SAFETY SUPPLY CO., LLC $1,487,667 · -12.9% | |
| Sep 10, 2026 | 260221 HSIPG-299S(503)TR | CreekPawneeRogersWashingtonDivision 8 | SH-167SH-99US-75 | Pavement Markings SH-99/SH-167/US-75: AT MULTIPLE LOCATIONS IN DISTRICT VIII. | — | Let | ACTION SAFETY SUPPLY CO., LLC $527,340 · | |
| Sep 10, 2026 | 260222 SSP-272F(387)PM | OsagePawneeTulsaDivision 8 | COUNTY ROAD(EW0550)SH-20SH-99US-169 | Joint Seal/Repair US-169/SH-20/SH-99/COUNTY ROAD(EW0550): AT MULTIPLE LOCATIONS IN DISTRICT VIII. | $1,447,666 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $1,382,789 · -4.5% | |
| Sep 17, 2026 | 260240 HSIPG-299S(495)TR | AtokaBryanComancheCraig+8 moreDivision 2 | I-35SH-7SH-74SH-9+4 more | Traffic Signal Safety Improvement I-35/US-62/US-69/US-70/US-271/SH-7/SH-9/SH-74: AT MULTIPLE LOCATIONS IN DISTRICTS I, II, III, VII, AND VIII. | $748,986 | Let | Lighthouse Transportation Group, LLC $808,785 · +8.0% | |
| Jul 1, 2027 estimated | 29829(04) J2-9829(004)PM | CreekDivision 8 | SH-99 | Bridge & Approaches SH-99: OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L | $8,400,0001 items | Planned | ||
| Apr 1, 2028 estimated | 39428(04) J3-9428(004)PM | HaskellDivision 1 | SH-9 | Resurface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 5.0 MI | $1,300,000 | Planned | ||
| Apr 1, 2029 estimated | 35563(04) J3-5563(004)PM | GreerDivision 5 | SH-9 | Widen, Resurface & Bridge SH-9: BEGIN AT THE US-283 JCT & EXT EAST 6.2 MILES. | $16,800,0007 items | Planned | ||
| FY 2030 | 35015(04) J3-5015(004)PM | SeminoleDivision 3 | SH-9 | Bridge & Approaches SH-9: OVER TIGER & UNNAMED CREEKS, 4.9 & 5.0 MILES EAST OF SH-99 | $4,900,0002 items | Planned | ||
| FY 2030 | 35715(04) J3-5715(004)PM | KiowaDivision 5 | SH-9B | Bridge & Approaches SH-9B: OVER AN UNNAMED CREEK, 1.5 MILES NORTH AND EAST OF SH-9 IN HOBART. | $1,400,0001 items | Planned | ||
| FY 2031 | 21714(04) STP-108B(129)SS | CaddoKiowaDivision 7 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM JUST E. OF THE STINKING CR. BRIDGE IN KIOWA CO. E. 2.75 MIS. TO THE SH 58 JCT. IN CARNEGIE (DIST. 5 PARTICIPATION JP 29529(04)) | $11,000,0001 items | Planned | ||
| FY 2031 | 29529(04) J2-9529(004)PM | KiowaDivision 5 | SH-9 | Money Only SH-9: MONEY PLACE HOLDER | $4,600,000 | Planned | ||
| FY 2031 | 35561(04) J3-5561(004)PM | KiowaDivision 5 | SH-9 | Widen, Resurface & Bridge SH-9: BEGIN AT THE SH-44 WEST JCT & EXT EAST 7.85 MILES. | $9,100,0002 items | Planned | ||
| FY 2032 | 33793(04) STP-246C(068)PM | McIntoshDivision 1 | SH-9 | Bridge & Approaches SH-9: OVER UNNAMED CRK & WALLACE CRK 6.0 & 6.2 MI E OF JCT SH-52 | $8,600,0002 items | Planned | ||
| FY 2032 | 34342(04) J3-4342(004)PM | McIntoshDivision 1 | SH-9 | Grade, Drain & Surface SH-9: SLIDE REPAIR 1.0 MI E OF INDIAN NATION TURNPIKE | $2,000,000 | Planned | ||
| FY 2032 | 35170(04) J3-5170(004)PM | GradyDivision 7 | SH-92 | Widen, Resurface & Bridge SH-92: FROM US-62, EXTEND N. 5. MIS. TO COUNTY ROAD E1310 | $24,600,0001 items | Planned | ||
| FY 2033 | 23267(04) SSP-135B(083)PM | JohnstonDivision 3 | SH-99 | Widen & Resurface SH-99: FROM 0.6 MILES NORTH OF SH-22, NORTH 5.3 MILES | $19,400,000 | Planned | ||
| FY 2033 | 35170(07) J3-5170(007)PM | GradyDivision 7 | SH-92 | Widen & Resurface SH-92: FROM COUNTY ROAD E1310, EXTEND N. 5.4 MIS. TO SECTION LINE E1260 | $19,300,000 | Planned | ||
| FY 2033 | 35764(04) J3-5764(004)PM | PottawatomieDivision 3 | SH-9A | Widen & Resurface SH-9A: FROM SH-3E, NORTH 3.5 MILES TO I-40 | $15,000,000 | Planned | ||
| FY 2034 | 23288(04) SSP-163B(193)PM | PottawatomieDivision 3 | SH-9 | Grade, Drain & Surface SH-9: FROM SH-102, EAST 5.5 MILES | $27,100,000 | Planned | ||
| FY 2034 | 32758(04) J3-2758(004)SS | ClevelandDivision 3 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 4.9 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 4.6 MILES | $39,900,0003 items | Planned | ||
| FY 2034 | 35116(04) J3-5116(004)PM | OsageDivision 8 | SH-99 | Widen & Resurface SH-99: FROM 5 MILES NORTH OF SH-20 TO SH-11 | $6,300,000 | Planned | ||
| FY 2034 | 35116(08) J3-5116(008)PM | OsageDivision 8 | SH-99 | Widen & Resurface SH-99: FROM 4.3 SOUTH OF SH-11, EXTEND NORTH 4.3 MILES TO SH-11 | $6,300,000 | Planned | ||
| FY 2034 | 35170(08) J3-5170(008)PM | GradyDivision 7 | SH-92 | Widen & Resurface SH-92: FROM SECTION LINE E1260, EXTEND N. 7.39 MIS. | $25,300,000 | Planned | ||
| FY 2034 | 36271(04) J3-6271(004)PM | CreekPawneeDivision 8 | SH-99 | Widen & Resurface SH-99: FROM SH-51 EXTEND NORTH 7.5 MILES TO CIMARRON TURNPIKE. | $18,800,000 | Planned | ||
| FY 2035 | 23288(08) J2-3288(008)PM | ClevelandPottawatomieDivision 3 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 0.2 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 5.5 MILES TO SH-102 | $46,100,0002 items | Planned | ||
| FY 2035 | 33801(04) J3-3801(004)PM | HaskellDivision 1 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 4.0 MI | $19,600,0005 items | Planned | ||
| FY 2035 | 35544(04) J3-5544(004)PM | HaskellDivision 1 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 10TH ST IN KEOTA, EXTEND E APPROX 5.8 MI TO LEFLORE C/L | $18,000,0004 items | Planned | ||
| FY 2035 | 35607(04) J3-5607(004)PM | ChoctawDivision 2 | SH-93 | Bridge Rehabilitation SH-93: OVER FRAZIER CREEK, 11.7 MI NORTH OF JCT US-70 | $3,000,0001 items | Planned | ||
| FY 2035 | 36274(04) J3-6274(004)PM | PawneeDivision 8 | SH-99 | Widen & Resurface SH-99: FROM THE CIMARRON TURNPIKE EXTEND NORTH TO US-64 | $11,300,000 | Planned | ||
| FY 2035 | 38350(04) J3-8350(004)PM | PittsburgDivision 2 | SH-9 | Bridge Rehabilitation SH-9: OVER LONGTOWN CREEK 3.3 MI EAST OF MCINTOSH C/L | $3,000,0001 items | Planned | ||
| FY 2035 | 38353(04) J3-8353(004)PM | ChoctawDivision 2 | SH-93 | Bridge Rehabilitation SH-93: OVER KIAMICHI RIVER, 8.3 MI NORTH US-70 JCT | $8,000,0001 items | Planned | ||
| FY 2036 | 35506(04) J3-5506(004) | OsageDivision 8 | SH-99 | Widen & Resurface SH-99: FROM 1.45 MILES NORTH OF THE PAWNEE C/L. EXTEND NORTH 4.02 MILES | $9,700,000 | Planned |
1–52 of 52
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.