ODOT Jobs

All dates · 52 jobs · $416,402,996 Sign up free
★ My Jobs

Filtered by: Highway: SH-9 Clear all

52 jobs · $416,402,996 estimated

ExcelCSV
Let date Contract / J/P County / Division Highway Description Estimate Status Added Low bidder
Sep 12, 2024 240199 STP-214F(161)3B ClevelandMcclainOkfuskeePottawatomie+1 moreDivision 3 CITY STREET (SHIELDS AVENUE)I-35I-44SH-102+4 more Joint Seal/Repair I-35/I-44/SH-9A/SH-27/SH-84/SH-102/SH-270B/CITY STREET (SHIELDS AVENUE): AT MULTIPLE LOCATIONS IN DISTRICT III. $346,274 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $392,189 · +13.3%
Jan 9, 2025 250019 SSR-012N(114)SR PottawatomieDivision 3 SH-99 Resurface (Asphalt) SH-99: FROM 0.1 MILES NORTH OF THE SEMINOLE COUNTY LINE, EXTEND NORTH NEAR PRAGUE. $1,244,841 Let Nov 26 New OVERLAND CORPORATION $1,131,261 · -9.1%
Jan 16, 2025 250025 STP-208B(122)AD CaddoDivision 7 SH-9 (HAZLETT ST) Pedestrian Improvements (Sidewalks) SH-9 (HAZLETT ST): FROM 1.37 MI. SOUTH OF THE SH-146 INTERSECTION, EXTEND NORTH IN FORT COBB. $560,269 Let Nov 26 New SAC Services, Inc. $423,810 · -24.4%
Mar 13, 2025 250116 SSR-012N(118)SR SeminoleDivision 3 SH-99 Resurface (Asphalt) SH-99: FROM 2.04 MILES NORTH OF US-270 (SH-9), EXTEND NORTH NEAR SEMINOLE. $3,553,797 Let Nov 26 New Silver Star Construction Company, Inc. $3,148,062 · -11.4%
May 15, 2025 250147 SSP-262F(099)PM ClevelandGarvinPontotocPottawatomieDivision 3 I-35SH-9US-270 Joint Seal And Repair I-35/ US-270/ SH-9: OVER WASHITA RIVER, OLD SH-18, US-77, AND BNSF RR, AT MULTIPLE LOCATIONS IN DIVISION III. $518,729 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $537,176 · +3.6%
Jun 12, 2025 250151 SSP-208F(136)PM CaddoDivision 7 SH-146SH-9US-62 Joint Seal And Repair US-62/SH-9/SH-146: OVER HOG CREEK, WASHITA RIVER AND OVERFLOW, AND COBB CREEK AT MULTIPLE LOCATIONS IN DISTRICT VII. $2,511,994 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $1,911,837 · -23.9%
Jun 19, 2025 250046 STP-267C(118)PM SeminoleDivision 3 SH-9 Resurface (Asphalt) SH-9: FROM 4.21 MILES WEST OF SH-56, EXTEND EAST NEAR SEMINOLE. $1,330,641 Let Nov 26 New THE CUMMINS CONSTRUCTION CO., INC. $1,294,381 · -2.7%
Jun 19, 2025 250169 SSP-270F(058)PM CimarronTexasDivision 6 SH-171SH-95US-287US-64 Bridge Water Proof Seal US-64/US-287/SH-95/SH-171: AT MULTIPLE LOCATIONS IN DISTRICT VI. $233,433 Let Nov 26 New LOGOS CONSTRUCTION CO., LLC $204,049 · -12.6%
Oct 9, 2025 250285 SSP-262F(093)PM JohnstonLincolnOkfuskeePontotocDivision 3 SH-102SH-18SH-27SH-3W+2 more Safety Improvement US-177/SH-3W/SH-18/SH-27/SH-99/SH-102: AT MULTIPLE LOCATIONS IN DISTRICT III. $700,770 Let Nov 26 New ACTION SAFETY SUPPLY CO., LLC $640,704 · -8.6%
Oct 16, 2025 250310 STP-262N(103)UR Pontotoc SH-99 (MISSISSIPPI AVE) Intersection Modification And Trafffic Signal SH-99 (MISSISSIPPI AVE): AT THE INTERSECTION OF SH-1 (ARLINGTON ST) IN THE CITY OF ADA. — Let Nov 26 New
Nov 20, 2025 250248 TAP-214B(188)TP ClevelandDivision 3 SH-9 Pedestrian And Bike Improvements SH-9: FROM 48TH ST, EXTEND EAST IN THE CITY OF NORMAN. $2,063,523 Let Nov 26 New Ellsworth Construction, LLC $1,616,427 · -21.7%
Mar 12, 2026 260048 SSR-207C(136)SR BryanDivision 2 SH-91 Resurface (Asphalt) SH-91: FROM THE US-69 JUNCTION, EXTEND EAST NEAR COLBERT AND ACHILLE. — Let Nov 26 New
Mar 12, 2026 260049 SSR-207C(137)SR BryanDivision 2 SH-91 Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT. — Let Nov 26 New
Mar 12, 2026 260050 SSR-207C(136)SR / SSR-207C(137)SR BryanDivision 2 SH-91 Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT AND ACHILLE. — Let Nov 26 New OVERLAND CORPORATION $4,164,235 ·
Mar 19, 2026 260068 STP-238B(103)AD KiowaDivision 5 SH-9 Pedestrian Improvements (Sidewalks) SH-9: FROM 0.75 MILES WEST OF THE SH-44 INTERSECTION, EXTEND EAST IN LONE WOLF. $829,184 Let Nov 26 New Wyatt Contracting $758,580 · -8.5%
Apr 9, 2026 260092 SSP-262F(108)PM ClevelandHughesJohnstonLincoln+2 moreDivision 3 INDIAN HILLS ROADOAK STSH-1SH-48+4 more Joint Seal And Repair US-62/US-270/SH-1/SH-48/SH-78/SH-99/INDIAN HILLS ROAD/OAK ST: AT MULTIPLE LOCATIONS IN DISTRICT III. $612,796 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $329,449 · -46.2%
Apr 9, 2026 260093 SBR-264F(124)SB AtokaChoctawPushmatahaDivision 2 SH-2SH-43SH-93 Bridge Rehabilitation SH-43/ SH-93/ SH-2: OVER BREAD TOWN CREEK, LONG CREEK, AND CRUM CREEK AT MULTIPLE LOCATIONS IN DISTRICT II. $2,578,428 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $2,111,309 · -18.1%
May 14, 2026 260163 STP-262N(103)UR Pontotoc SH-99 (MISSISSIPPI AVE) Intersection Modification And Traffic Signal SH-99 (MISSISSIPPI AVE): AT THE INTERSECTION OF SH-1 (ARLINGTON ST) IN THE CITY OF ADA. $5,429,772 Let Nov 26 New SAC Services, Inc. $6,098,944 · +12.3%
Jun 18, 2026 260144 STP-241B(195)PM ClevelandDivision 3 SH-9 Grade, Drain, Bridge, And Surface SH-9: FROM 7.7 MILES EAST OF THE US-77 INTERCHANGE, EXTEND EAST IN THE CITY OF NORMAN. — Let Nov 26 New Haskell Lemon Group, LLC $33,388,900 ·
Jul 16, 2026 260180 STP-267C(123)PM SeminoleDivision 3 SH-9 Resurface (Asphalt) SH-9: FROM THE US-270 JUNCTION, EXTEND EAST NEAR SEMINOLE. $1,184,376 Let Nov 26 New THE CUMMINS CONSTRUCTION CO., INC. $1,161,743 · -1.9%
Sep 10, 2026 260219 HSIPG-299S(501)TR CanadianClevelandGarvinKay+8 moreDivision 4 I-240I-35I-40I-44+5 more Pavement Markings SH-9/SH-18/SH-51/SH-76/US-81/I-35/I-40/I-44/I-240: AT MULTIPLE LOCATIONS IN DISTRICT III AND IV. $1,707,518 Let Nov 26 New ACTION SAFETY SUPPLY CO., LLC $1,487,667 · -12.9%
Sep 10, 2026 260221 HSIPG-299S(503)TR CreekPawneeRogersWashingtonDivision 8 SH-167SH-99US-75 Pavement Markings SH-99/SH-167/US-75: AT MULTIPLE LOCATIONS IN DISTRICT VIII. — Let Nov 26 New ACTION SAFETY SUPPLY CO., LLC $527,340 ·
Sep 10, 2026 260222 SSP-272F(387)PM OsagePawneeTulsaDivision 8 COUNTY ROAD(EW0550)SH-20SH-99US-169 Joint Seal/Repair US-169/SH-20/SH-99/COUNTY ROAD(EW0550): AT MULTIPLE LOCATIONS IN DISTRICT VIII. $1,447,666 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $1,382,789 · -4.5%
Sep 17, 2026 260240 HSIPG-299S(495)TR AtokaBryanComancheCraig+8 moreDivision 2 I-35SH-7SH-74SH-9+4 more Traffic Signal Safety Improvement I-35/US-62/US-69/US-70/US-271/SH-7/SH-9/SH-74: AT MULTIPLE LOCATIONS IN DISTRICTS I, II, III, VII, AND VIII. $748,986 Let Nov 26 New Lighthouse Transportation Group, LLC $808,785 · +8.0%
Jul 1, 2027 estimated 29829(04) J2-9829(004)PM CreekDivision 8 SH-99 Bridge & Approaches SH-99: OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L $8,400,0001 items Planned Nov 25 New
Apr 1, 2028 estimated 39428(04) J3-9428(004)PM HaskellDivision 1 SH-9 Resurface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 5.0 MI $1,300,000 Planned Nov 25 New
Apr 1, 2029 estimated 35563(04) J3-5563(004)PM GreerDivision 5 SH-9 Widen, Resurface & Bridge SH-9: BEGIN AT THE US-283 JCT & EXT EAST 6.2 MILES. $16,800,0007 items Planned Nov 25 New
FY 2030 35015(04) J3-5015(004)PM SeminoleDivision 3 SH-9 Bridge & Approaches SH-9: OVER TIGER & UNNAMED CREEKS, 4.9 & 5.0 MILES EAST OF SH-99 $4,900,0002 items Planned Nov 25 New
FY 2030 35715(04) J3-5715(004)PM KiowaDivision 5 SH-9B Bridge & Approaches SH-9B: OVER AN UNNAMED CREEK, 1.5 MILES NORTH AND EAST OF SH-9 IN HOBART. $1,400,0001 items Planned Nov 25 New
FY 2031 21714(04) STP-108B(129)SS CaddoKiowaDivision 7 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM JUST E. OF THE STINKING CR. BRIDGE IN KIOWA CO. E. 2.75 MIS. TO THE SH 58 JCT. IN CARNEGIE (DIST. 5 PARTICIPATION JP 29529(04)) $11,000,0001 items Planned Nov 25 New
FY 2031 29529(04) J2-9529(004)PM KiowaDivision 5 SH-9 Money Only SH-9: MONEY PLACE HOLDER $4,600,000 Planned Nov 25 New
FY 2031 35561(04) J3-5561(004)PM KiowaDivision 5 SH-9 Widen, Resurface & Bridge SH-9: BEGIN AT THE SH-44 WEST JCT & EXT EAST 7.85 MILES. $9,100,0002 items Planned Nov 25 New
FY 2032 33793(04) STP-246C(068)PM McIntoshDivision 1 SH-9 Bridge & Approaches SH-9: OVER UNNAMED CRK & WALLACE CRK 6.0 & 6.2 MI E OF JCT SH-52 $8,600,0002 items Planned Nov 25 New
FY 2032 34342(04) J3-4342(004)PM McIntoshDivision 1 SH-9 Grade, Drain & Surface SH-9: SLIDE REPAIR 1.0 MI E OF INDIAN NATION TURNPIKE $2,000,000 Planned Nov 25 New
FY 2032 35170(04) J3-5170(004)PM GradyDivision 7 SH-92 Widen, Resurface & Bridge SH-92: FROM US-62, EXTEND N. 5. MIS. TO COUNTY ROAD E1310 $24,600,0001 items Planned Nov 25 New
FY 2033 23267(04) SSP-135B(083)PM JohnstonDivision 3 SH-99 Widen & Resurface SH-99: FROM 0.6 MILES NORTH OF SH-22, NORTH 5.3 MILES $19,400,000 Planned Nov 25 New
FY 2033 35170(07) J3-5170(007)PM GradyDivision 7 SH-92 Widen & Resurface SH-92: FROM COUNTY ROAD E1310, EXTEND N. 5.4 MIS. TO SECTION LINE E1260 $19,300,000 Planned Nov 25 New
FY 2033 35764(04) J3-5764(004)PM PottawatomieDivision 3 SH-9A Widen & Resurface SH-9A: FROM SH-3E, NORTH 3.5 MILES TO I-40 $15,000,000 Planned Nov 25 New
FY 2034 23288(04) SSP-163B(193)PM PottawatomieDivision 3 SH-9 Grade, Drain & Surface SH-9: FROM SH-102, EAST 5.5 MILES $27,100,000 Planned Nov 25 New
FY 2034 32758(04) J3-2758(004)SS ClevelandDivision 3 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM 4.9 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 4.6 MILES $39,900,0003 items Planned Nov 25 New
FY 2034 35116(04) J3-5116(004)PM OsageDivision 8 SH-99 Widen & Resurface SH-99: FROM 5 MILES NORTH OF SH-20 TO SH-11 $6,300,000 Planned Nov 25 New
FY 2034 35116(08) J3-5116(008)PM OsageDivision 8 SH-99 Widen & Resurface SH-99: FROM 4.3 SOUTH OF SH-11, EXTEND NORTH 4.3 MILES TO SH-11 $6,300,000 Planned Nov 25 New
FY 2034 35170(08) J3-5170(008)PM GradyDivision 7 SH-92 Widen & Resurface SH-92: FROM SECTION LINE E1260, EXTEND N. 7.39 MIS. $25,300,000 Planned Nov 25 New
FY 2034 36271(04) J3-6271(004)PM CreekPawneeDivision 8 SH-99 Widen & Resurface SH-99: FROM SH-51 EXTEND NORTH 7.5 MILES TO CIMARRON TURNPIKE. $18,800,000 Planned Nov 25 New
FY 2035 23288(08) J2-3288(008)PM ClevelandPottawatomieDivision 3 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM 0.2 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 5.5 MILES TO SH-102 $46,100,0002 items Planned Nov 25 New
FY 2035 33801(04) J3-3801(004)PM HaskellDivision 1 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 4.0 MI $19,600,0005 items Planned Nov 25 New
FY 2035 35544(04) J3-5544(004)PM HaskellDivision 1 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM 10TH ST IN KEOTA, EXTEND E APPROX 5.8 MI TO LEFLORE C/L $18,000,0004 items Planned Nov 25 New
FY 2035 35607(04) J3-5607(004)PM ChoctawDivision 2 SH-93 Bridge Rehabilitation SH-93: OVER FRAZIER CREEK, 11.7 MI NORTH OF JCT US-70 $3,000,0001 items Planned Nov 25 New
FY 2035 36274(04) J3-6274(004)PM PawneeDivision 8 SH-99 Widen & Resurface SH-99: FROM THE CIMARRON TURNPIKE EXTEND NORTH TO US-64 $11,300,000 Planned Nov 25 New
FY 2035 38350(04) J3-8350(004)PM PittsburgDivision 2 SH-9 Bridge Rehabilitation SH-9: OVER LONGTOWN CREEK 3.3 MI EAST OF MCINTOSH C/L $3,000,0001 items Planned Nov 25 New
FY 2035 38353(04) J3-8353(004)PM ChoctawDivision 2 SH-93 Bridge Rehabilitation SH-93: OVER KIAMICHI RIVER, 8.3 MI NORTH US-70 JCT $8,000,0001 items Planned Nov 25 New
FY 2036 35506(04) J3-5506(004) OsageDivision 8 SH-99 Widen & Resurface SH-99: FROM 1.45 MILES NORTH OF THE PAWNEE C/L. EXTEND NORTH 4.02 MILES $9,700,000 Planned Nov 25 New
1–52 of 52

Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.