ODOT Jobs

All dates · 29 jobs · $215,270,055 Sign up free
★ My Jobs

Filtered by: Highway: SH-4 Clear all

29 jobs · $215,270,055 estimated

ExcelCSV
Let date Contract / J/P County / Division Highway Description Estimate Status Added Low bidder
Oct 17, 2024 240242 STP-207C(124)PM AtokaBryanDivision 2 SH-48 Widen, Resurface, And Bridge SH-48: FROM 1.0 MILE NORTH OF THE SH-78 JUNCTION, EXTEND NORTH NEAR KENEFIC. — Let Nov 26 New THE CUMMINS CONSTRUCTION CO., INC. $16,546,697 ·
Nov 21, 2024 230281 STP-238C(087)PM / STP-238C(085)PM KiowaDivision 5 SH-115SH-49 Bridge And Approaches, Grade, Drain, And Surface SH-115/SH-49: SH-115, OVER SADDLE MOUNTAIN CREEK AND TRIBUTARIES 1.7 MILES, 1.9 MILES, AND 2.2 MILES SOUTH OF THE SH-19 JUNCTION NEAR COOPERTON. SH-49, FROM 1.1 MILES EAST OF THE SH-54 JUNCTION EXTEND EAST NEAR COOPERTON. $5,132,211 Let Nov 26 New Wyatt Contracting $4,301,336 · -16.2%
Nov 21, 2024 240251 STP-215C(059)PM / STP-215C(060)PM CoalDivision 3 SH-48 Bridge And Approaches SH-48: OVER ELM CREEK, TELL CREEK, UNNAMED CREEK, AND BOGGY CREEK OVERFLOW AT MULTIPLE LOCATIONS NORTH AND SOUTH OF THE SH-31 JUNCTION NEAR CLARITA. $6,646,456 Let Nov 26 New Treas Construction Inc $6,037,391 · -9.2%
Jan 9, 2025 250009 SBR-219B(105)SB CreekDivision 8 SH-48 Bridge Rehabilitation SH-48: OVER POLECAT CREEK, 2.8 MILES SOUTH OF THE INTERSECTION OF SH-33 NEAR BRISTOW. $1,328,285 Let Nov 26 New BRIDGECO CONTRACTORS, INC. $1,249,273 · -5.9%
Apr 10, 2025 250121 SRS-209E(030)ST / TAP-209D(130)TP / TAP-209D(131)TP CanadianDivision 4 CITY STREET (EDMOND ROAD (NW 178TH ST)NW 7TH STSH-4 (PIEDMONT RD)STOUT DRIVE)+1 more Pedestrian And Bike Improvements SH-4 (PIEDMONT RD)/ CITY STREET (EDMOND ROAD (NW 178TH ST)/ WASHINGTON AVE (NW 164TH ST)/ NW 7TH ST/ STOUT DRIVE): AT MULTIPLE LOCATIONS IN THE CITY OF PIEDMONT. $1,904,406 Let Nov 26 New Wyatt Contracting $2,000,000 · +5.0%
May 8, 2025 250142 SSP-262F(100)PM GarvinOkfuskeePontotocDivision 3 SH-1SH-3SH-48SH-59 Bridge Waterproof Seal SH-1/ SH-3/ SH-48/ SH-59: AT MULTIPLE LOCATIONS IN DIVISION III. $112,376 Let Nov 26 New GARY A. CRAIN, INC. $121,290 · +7.9%
Sep 11, 2025 250229 STP-230F(071)3B EllisHarperMajorWoodwardDivision 6 SH-15SH-46SH-50SH-58+2 more Joint Seal/Repair US-270/SH-8/SH-15/SH-46/SH-50/SH-58: OVER CLEAR CREEK, BEAVER RIVER, SAND CREEK, DEEP CREEK, N CANADIAN RIVER, BUZZARD CREEK, AND LITTLE WOLF CREEK, AT MULTIPLE LOCATIONS IN DISTRICT VI. PROJECT LENGTH - 0.00 MILES $316,364 Let Nov 26 New Impact Contractors, LLC $271,906 · -14.1%
Apr 9, 2026 260091 SSP-262F(106)PM GarvinJohnstonMcclainOkfuskee+2 moreDivision 3 SH-145SH-24SH-48US-270+1 more Bridge Water Proof Seal US-75/US-270/SH-24/SH-48/SH-145: AT MULTIPLE LOCATIONS IN DISTRICT III. $74,752 Let Nov 26 New LOGOS CONSTRUCTION CO., LLC $94,801 · +26.8%
Apr 9, 2026 260092 SSP-262F(108)PM ClevelandHughesJohnstonLincoln+2 moreDivision 3 INDIAN HILLS ROADOAK STSH-1SH-48+4 more Joint Seal And Repair US-62/US-270/SH-1/SH-48/SH-78/SH-99/INDIAN HILLS ROAD/OAK ST: AT MULTIPLE LOCATIONS IN DISTRICT III. $612,796 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $329,449 · -46.2%
Apr 9, 2026 260093 SBR-264F(124)SB AtokaChoctawPushmatahaDivision 2 SH-2SH-43SH-93 Bridge Rehabilitation SH-43/ SH-93/ SH-2: OVER BREAD TOWN CREEK, LONG CREEK, AND CRUM CREEK AT MULTIPLE LOCATIONS IN DISTRICT II. $2,578,428 Let Nov 26 New B & B CONSTRUCTION SERVICE J.T., INC. $2,111,309 · -18.1%
Jun 18, 2026 260158 SSR-232C(083)SR HughesDivision 3 SH-48 Resurface (Asphalt) SH-48: FROM THE JUNCTION OF SH-9, EXTEND NORTH NEAR HOLDENVILLE. $959,758 Let Nov 26 New Robinson Construction, LLC $928,428 · -3.3%
Sep 10, 2026 260212 STP-241F(132)3B HughesJohnstonLincolnPontotoc+1 moreDivision 3 SH-1SH-3ESH-48ASH-7+2 more Joint Seal/Repair US-177/US-377/SH-3E/SH-7/SH-48A/SH-1: AT MULTIPLE LOCATIONS IN DISTRICT III. $665,341 Let Nov 26 New PBX Corporation $500,673 · -24.7%
Sep 10, 2026 260220 HSIPG-299S(502)TR AlfalfaBeckhamCaddoCarter+9 moreDivision 6 I-35I-40I-44SH-45+3 more Pavement Markings SH-5/SH-45/US-81/US-183/I-35/I-40/I-44: AT MULTIPLE LOCATIONS IN DISTRICT V, VI AND VII $1,738,883 Let Nov 26 New ACTION SAFETY SUPPLY CO., LLC $1,574,760 · -9.4%
Jan 14, 2027 270010 STP-215C(061)PM CoalDivision 3 SH-48 Bridge And Approaches SH-48: OVER UNNAMED CREEK, 2.97 MILES SOUTH OF THE SH-3 JUNCTION NEAR TUPELO. —42 items Advertised Nov 25 New
Apr 1, 2027 estimated 33814(04) J3-3814(004)PM HughesDivision 3 SH-48 Bridge Rehabilitation SH-48: OVER SOUTH CANADIAN RIVER, 3.2 MILES NORTH OF SH-1 $5,800,0001 items Planned Nov 25 New
Jun 1, 2027 estimated 35774(04) J3-5774(004)PM EllisDivision 6 SH-46 Bridge Rehabilitation SH-46: OVER WOLF CREEK, APPROX 0.80 MI NORTH OF JCT SH-15 (NBI 15205) $1,700,0001 items Planned Nov 25 New
Sep 1, 2027 estimated 33821(04) STP-249C(088)PM MayesDivision 8 SH-412B Pavement Rehabilitation SH-412B: FROM SH-69A TO US-412 $17,600,000 Planned Nov 25 New
Sep 1, 2027 estimated 35353(04) SSP-249C(066)PM MayesDivision 8 SH-412B Intersect Modif SH-412B: AT PATROL RD $4,200,000 Planned Nov 25 New
Mar 1, 2028 estimated 31866(04) J3-1866(004)PM CoalDivision 3 SH-48 Grade, Drain & Surface SH-48: FROM 3.1 MILES NORTH OF SH-31, NORTH 4.6 MILES TO SH-3 $14,500,000 Planned Nov 25 New
Sep 1, 2028 estimated 34262(04) J3-4262(004)PM GradyDivision 7 SH-4 Interchange SH-4: AT FOX LANE (EW 122) 2.24 MIS. N. OF I-44 $15,700,000 Planned Nov 25 New
Sep 1, 2028 estimated 35161(04) J3-5161(004)PM GradyDivision 7 SH-4 Grade,Drain,Bridge & Surface SH-4: FROM H.E. BAILEY TPK., N. 5.26 MIS. TO SH-37 $29,200,0001 items Planned Nov 25 New
Jun 1, 2029 estimated 35681(04) J3-5681(004)PM CanadianDivision 4 SH-4 Intersect Modif SH-4: FROM THE NW EXPRESSWAY EXT NORTH APPROX 3.5 MI TO KINGFISHER C/L $5,300,000 Planned Nov 25 New
FY 2030 31047(04) STP-253C(093)PM CoalJohnstonDivision 3 SH-48 Widen & Resurface SH-48: FROM 2.0 MILES NORTH OF SH-7, NORTH 6.0 MILES $15,200,000 Planned Nov 25 New
FY 2030 31050(04) STP-235C(065)PM JohnstonDivision 3 SH-48 Bridge Rehabilitation SH-48: OVER SANDY CREEK, 3.0 MILES SOUTH OF SH-7 $1,600,0001 items Planned Nov 25 New
FY 2030 35050(04) STP-249C(089)PM MayesDivision 8 SH-412B Interchange SH-412B: AT US-412 JUNCTION $26,800,000 Planned Nov 25 New
FY 2031 35581(04) J3-5581(004)PM KiowaDivision 5 SH-44 Widen, Resurface & Bridge SH-44: BEGIN 0.15 MI SW OF SH-44A / SH-44 JCT, EXT NE APPROX 2.30 MI. $7,300,0001 items Planned Nov 25 New
FY 2032 28920(04) J2-8920(004)PM JohnstonDivision 3 SH-48 Widen & Resurface SH-48: FROM ATOKA COUNTY LINE, NORTH 7.5 MILES TO SH-48A $27,000,000 Planned Nov 25 New
FY 2034 31087(04) J3-1087(004)PM CreekDivision 8 SH-48 Grade, Drain & Surface SH-48: BEGIN AT CREEK/ OKFUSKEE CL EXTEND NORTH 6.5 MI $17,100,000 Planned Nov 25 New
FY 2034 35620(04) J3-5620(004)PM GradyDivision 7 SH-4 Resurface SH-4: FROM SH-37, NORTH 2.30 MILES $4,200,000 Planned Nov 25 New
1–29 of 29

Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.