Filtered by: Highway: SH-4 Clear all
| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Oct 17, 2024 | 240242 STP-207C(124)PM | AtokaBryanDivision 2 | SH-48 | Widen, Resurface, And Bridge SH-48: FROM 1.0 MILE NORTH OF THE SH-78 JUNCTION, EXTEND NORTH NEAR KENEFIC. | — | Let | THE CUMMINS CONSTRUCTION CO., INC. $16,546,697 · | |
| Nov 21, 2024 | 230281 STP-238C(087)PM / STP-238C(085)PM | KiowaDivision 5 | SH-115SH-49 | Bridge And Approaches, Grade, Drain, And Surface SH-115/SH-49: SH-115, OVER SADDLE MOUNTAIN CREEK AND TRIBUTARIES 1.7 MILES, 1.9 MILES, AND 2.2 MILES SOUTH OF THE SH-19 JUNCTION NEAR COOPERTON. SH-49, FROM 1.1 MILES EAST OF THE SH-54 JUNCTION EXTEND EAST NEAR COOPERTON. | $5,132,211 | Let | Wyatt Contracting $4,301,336 · -16.2% | |
| Nov 21, 2024 | 240251 STP-215C(059)PM / STP-215C(060)PM | CoalDivision 3 | SH-48 | Bridge And Approaches SH-48: OVER ELM CREEK, TELL CREEK, UNNAMED CREEK, AND BOGGY CREEK OVERFLOW AT MULTIPLE LOCATIONS NORTH AND SOUTH OF THE SH-31 JUNCTION NEAR CLARITA. | $6,646,456 | Let | Treas Construction Inc $6,037,391 · -9.2% | |
| Jan 9, 2025 | 250009 SBR-219B(105)SB | CreekDivision 8 | SH-48 | Bridge Rehabilitation SH-48: OVER POLECAT CREEK, 2.8 MILES SOUTH OF THE INTERSECTION OF SH-33 NEAR BRISTOW. | $1,328,285 | Let | BRIDGECO CONTRACTORS, INC. $1,249,273 · -5.9% | |
| Apr 10, 2025 | 250121 SRS-209E(030)ST / TAP-209D(130)TP / TAP-209D(131)TP | CanadianDivision 4 | CITY STREET (EDMOND ROAD (NW 178TH ST)NW 7TH STSH-4 (PIEDMONT RD)STOUT DRIVE)+1 more | Pedestrian And Bike Improvements SH-4 (PIEDMONT RD)/ CITY STREET (EDMOND ROAD (NW 178TH ST)/ WASHINGTON AVE (NW 164TH ST)/ NW 7TH ST/ STOUT DRIVE): AT MULTIPLE LOCATIONS IN THE CITY OF PIEDMONT. | $1,904,406 | Let | Wyatt Contracting $2,000,000 · +5.0% | |
| May 8, 2025 | 250142 SSP-262F(100)PM | GarvinOkfuskeePontotocDivision 3 | SH-1SH-3SH-48SH-59 | Bridge Waterproof Seal SH-1/ SH-3/ SH-48/ SH-59: AT MULTIPLE LOCATIONS IN DIVISION III. | $112,376 | Let | GARY A. CRAIN, INC. $121,290 · +7.9% | |
| Sep 11, 2025 | 250229 STP-230F(071)3B | EllisHarperMajorWoodwardDivision 6 | SH-15SH-46SH-50SH-58+2 more | Joint Seal/Repair US-270/SH-8/SH-15/SH-46/SH-50/SH-58: OVER CLEAR CREEK, BEAVER RIVER, SAND CREEK, DEEP CREEK, N CANADIAN RIVER, BUZZARD CREEK, AND LITTLE WOLF CREEK, AT MULTIPLE LOCATIONS IN DISTRICT VI. PROJECT LENGTH - 0.00 MILES | $316,364 | Let | Impact Contractors, LLC $271,906 · -14.1% | |
| Apr 9, 2026 | 260091 SSP-262F(106)PM | GarvinJohnstonMcclainOkfuskee+2 moreDivision 3 | SH-145SH-24SH-48US-270+1 more | Bridge Water Proof Seal US-75/US-270/SH-24/SH-48/SH-145: AT MULTIPLE LOCATIONS IN DISTRICT III. | $74,752 | Let | LOGOS CONSTRUCTION CO., LLC $94,801 · +26.8% | |
| Apr 9, 2026 | 260092 SSP-262F(108)PM | ClevelandHughesJohnstonLincoln+2 moreDivision 3 | INDIAN HILLS ROADOAK STSH-1SH-48+4 more | Joint Seal And Repair US-62/US-270/SH-1/SH-48/SH-78/SH-99/INDIAN HILLS ROAD/OAK ST: AT MULTIPLE LOCATIONS IN DISTRICT III. | $612,796 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $329,449 · -46.2% | |
| Apr 9, 2026 | 260093 SBR-264F(124)SB | AtokaChoctawPushmatahaDivision 2 | SH-2SH-43SH-93 | Bridge Rehabilitation SH-43/ SH-93/ SH-2: OVER BREAD TOWN CREEK, LONG CREEK, AND CRUM CREEK AT MULTIPLE LOCATIONS IN DISTRICT II. | $2,578,428 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $2,111,309 · -18.1% | |
| Jun 18, 2026 | 260158 SSR-232C(083)SR | HughesDivision 3 | SH-48 | Resurface (Asphalt) SH-48: FROM THE JUNCTION OF SH-9, EXTEND NORTH NEAR HOLDENVILLE. | $959,758 | Let | Robinson Construction, LLC $928,428 · -3.3% | |
| Sep 10, 2026 | 260212 STP-241F(132)3B | HughesJohnstonLincolnPontotoc+1 moreDivision 3 | SH-1SH-3ESH-48ASH-7+2 more | Joint Seal/Repair US-177/US-377/SH-3E/SH-7/SH-48A/SH-1: AT MULTIPLE LOCATIONS IN DISTRICT III. | $665,341 | Let | PBX Corporation $500,673 · -24.7% | |
| Sep 10, 2026 | 260220 HSIPG-299S(502)TR | AlfalfaBeckhamCaddoCarter+9 moreDivision 6 | I-35I-40I-44SH-45+3 more | Pavement Markings SH-5/SH-45/US-81/US-183/I-35/I-40/I-44: AT MULTIPLE LOCATIONS IN DISTRICT V, VI AND VII | $1,738,883 | Let | ACTION SAFETY SUPPLY CO., LLC $1,574,760 · -9.4% | |
| Jan 14, 2027 | 270010 STP-215C(061)PM | CoalDivision 3 | SH-48 | Bridge And Approaches SH-48: OVER UNNAMED CREEK, 2.97 MILES SOUTH OF THE SH-3 JUNCTION NEAR TUPELO. | —42 items | Advertised | ||
| Apr 1, 2027 estimated | 33814(04) J3-3814(004)PM | HughesDivision 3 | SH-48 | Bridge Rehabilitation SH-48: OVER SOUTH CANADIAN RIVER, 3.2 MILES NORTH OF SH-1 | $5,800,0001 items | Planned | ||
| Jun 1, 2027 estimated | 35774(04) J3-5774(004)PM | EllisDivision 6 | SH-46 | Bridge Rehabilitation SH-46: OVER WOLF CREEK, APPROX 0.80 MI NORTH OF JCT SH-15 (NBI 15205) | $1,700,0001 items | Planned | ||
| Sep 1, 2027 estimated | 33821(04) STP-249C(088)PM | MayesDivision 8 | SH-412B | Pavement Rehabilitation SH-412B: FROM SH-69A TO US-412 | $17,600,000 | Planned | ||
| Sep 1, 2027 estimated | 35353(04) SSP-249C(066)PM | MayesDivision 8 | SH-412B | Intersect Modif SH-412B: AT PATROL RD | $4,200,000 | Planned | ||
| Mar 1, 2028 estimated | 31866(04) J3-1866(004)PM | CoalDivision 3 | SH-48 | Grade, Drain & Surface SH-48: FROM 3.1 MILES NORTH OF SH-31, NORTH 4.6 MILES TO SH-3 | $14,500,000 | Planned | ||
| Sep 1, 2028 estimated | 34262(04) J3-4262(004)PM | GradyDivision 7 | SH-4 | Interchange SH-4: AT FOX LANE (EW 122) 2.24 MIS. N. OF I-44 | $15,700,000 | Planned | ||
| Sep 1, 2028 estimated | 35161(04) J3-5161(004)PM | GradyDivision 7 | SH-4 | Grade,Drain,Bridge & Surface SH-4: FROM H.E. BAILEY TPK., N. 5.26 MIS. TO SH-37 | $29,200,0001 items | Planned | ||
| Jun 1, 2029 estimated | 35681(04) J3-5681(004)PM | CanadianDivision 4 | SH-4 | Intersect Modif SH-4: FROM THE NW EXPRESSWAY EXT NORTH APPROX 3.5 MI TO KINGFISHER C/L | $5,300,000 | Planned | ||
| FY 2030 | 31047(04) STP-253C(093)PM | CoalJohnstonDivision 3 | SH-48 | Widen & Resurface SH-48: FROM 2.0 MILES NORTH OF SH-7, NORTH 6.0 MILES | $15,200,000 | Planned | ||
| FY 2030 | 31050(04) STP-235C(065)PM | JohnstonDivision 3 | SH-48 | Bridge Rehabilitation SH-48: OVER SANDY CREEK, 3.0 MILES SOUTH OF SH-7 | $1,600,0001 items | Planned | ||
| FY 2030 | 35050(04) STP-249C(089)PM | MayesDivision 8 | SH-412B | Interchange SH-412B: AT US-412 JUNCTION | $26,800,000 | Planned | ||
| FY 2031 | 35581(04) J3-5581(004)PM | KiowaDivision 5 | SH-44 | Widen, Resurface & Bridge SH-44: BEGIN 0.15 MI SW OF SH-44A / SH-44 JCT, EXT NE APPROX 2.30 MI. | $7,300,0001 items | Planned | ||
| FY 2032 | 28920(04) J2-8920(004)PM | JohnstonDivision 3 | SH-48 | Widen & Resurface SH-48: FROM ATOKA COUNTY LINE, NORTH 7.5 MILES TO SH-48A | $27,000,000 | Planned | ||
| FY 2034 | 31087(04) J3-1087(004)PM | CreekDivision 8 | SH-48 | Grade, Drain & Surface SH-48: BEGIN AT CREEK/ OKFUSKEE CL EXTEND NORTH 6.5 MI | $17,100,000 | Planned | ||
| FY 2034 | 35620(04) J3-5620(004)PM | GradyDivision 7 | SH-4 | Resurface SH-4: FROM SH-37, NORTH 2.30 MILES | $4,200,000 | Planned |
1–29 of 29
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.