| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$8,500.00 |
$12,440.68 |
$20,000.00 |
$30,000.00 |
$45,900.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,117 | CY |
$10.00 |
$7.50 |
$10.22 |
$12.00 |
$14.00 |
$15.30 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 3,677 | CY |
$12.00 |
$9.80 |
$14.54 |
$12.00 |
$17.70 |
$24.48 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$11,204.88 |
$12,000.00 |
$15,000.00 |
$44,370.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,681 | LF |
$3.00 |
$3.24 |
$3.82 |
$3.55 |
$3.50 |
$5.10 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 252 | LF |
$14.00 |
$12.44 |
$14.66 |
$14.00 |
$13.00 |
$20.40 |
| 70 | 229 6100 |
DITCH LINER PROTECTION | 915 | LF |
$3.00 |
$3.29 |
$3.88 |
$3.60 |
$3.60 |
$3.06 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 16,340 | SY |
$3.00 |
$3.29 |
$3.88 |
$3.75 |
$3.50 |
$4.85 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 3.38 | AC |
$1,100.00 |
$100.00 |
$1,042.85 |
$950.00 |
$885.00 |
$3,060.00 |
| 100 | 241 3100 |
MOWING | 6.42 | AC |
$325.00 |
$368.00 |
$433.64 |
$400.00 |
$368.00 |
$510.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 4,150 | SY |
$7.50 |
$9.49 |
$6.79 |
$12.50 |
$10.25 |
$11.22 |
| 120 | 407(B)7300 |
TACK COAT | 571 | GAL |
$5.00 |
$6.09 |
$5.38 |
$6.55 |
$6.50 |
$6.40 |
| 130 | 408 8100 |
PRIME COAT | 1,443 | GAL |
$5.00 |
$7.05 |
$5.70 |
$7.60 |
$7.60 |
$5.54 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,288 | TON |
$110.00 |
$116.67 |
$115.56 |
$125.00 |
$125.00 |
$123.22 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 421 | TON |
$120.00 |
$153.68 |
$135.17 |
$165.00 |
$165.00 |
$148.82 |
| 160 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 98 | CY |
$25.00 |
$50.00 |
$14.58 |
$30.00 |
$45.00 |
$22.95 |
| 170 | 509(A)0200 |
CLASS AA CONCRETE | 225 | CY |
$700.00 |
$525.00 |
$599.00 |
$700.00 |
$600.00 |
$622.00 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 165 | CY |
$500.00 |
$470.00 |
$490.22 |
$575.00 |
$400.00 |
$400.00 |
| 190 | 511(A)2200 |
REINFORCING STEEL | 35,604 | LB |
$1.50 |
$1.50 |
$1.18 |
$1.15 |
$1.00 |
$1.15 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$12,500.00 |
$8,678.60 |
$10,000.00 |
$15,000.00 |
$51,000.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,800 | SY |
$8.00 |
$6.30 |
$6.65 |
$6.65 |
$7.50 |
$12.50 |
| 220 | 619(C)6600 |
SAWING PAVEMENT | 64 | LF |
$11.00 |
$5.00 |
$5.85 |
$10.00 |
$20.00 |
$11.00 |
| 230 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,484 | LF |
$10.00 |
$8.25 |
$9.13 |
$9.40 |
$12.50 |
$12.50 |
| 240 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 18,000 | SD |
$0.3500 |
$0.3600 |
$0.2900 |
$0.2700 |
$0.5000 |
$0.3700 |
| 250 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 220 | SD |
$0.7000 |
$3.00 |
$5.89 |
$5.20 |
$6.00 |
$3.06 |
| 260 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,190 | SD |
$1.30 |
$2.00 |
$0.2900 |
$0.2700 |
$5.00 |
$2.04 |
| 270 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,980 | SD |
$1.30 |
$2.00 |
$0.2900 |
$0.2700 |
$5.00 |
$2.04 |
| 280 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 4,840 | SD |
$0.2500 |
$0.2500 |
$0.2900 |
$0.2700 |
$5.00 |
$0.2600 |
| 290 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 502 | SD |
$15.00 |
$13.00 |
$17.68 |
$16.00 |
$18.00 |
$13.26 |
| 300 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$140.00 |
$25.00 |
$117.84 |
$125.00 |
$150.00 |
$25.50 |
| 310 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 12.88 | SF |
$45.00 |
$39.00 |
$64.81 |
$60.00 |
$65.00 |
$39.78 |
| 320 | 851(C)2415 |
2" SQUARE TUBE POST | 38 | LF |
$12.50 |
$12.50 |
$14.14 |
$13.00 |
$14.00 |
$12.75 |
| 330 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 4,400 | LF |
$0.7000 |
$1.05 |
$2.95 |
$5.15 |
$3.00 |
$1.07 |
| 340 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,750.00 |
$2,000.00 |
$5,891.80 |
$5,000.00 |
$6,000.00 |
$3,000.00 |
| 350 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$27,500.00 |
$59,500.00 |
$30,066.94 |
$12,000.00 |
$30,000.00 |
$40,800.00 |
| 360 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 21,535 | CY |
$10.00 |
$8.15 |
$10.40 |
$10.00 |
$14.00 |
$13.26 |
| 370 | 202(D)2500 |
UNCLASSIFIED BORROW | 858 | CY |
$12.00 |
$12.00 |
$12.80 |
$15.00 |
$17.00 |
$23.46 |
| 380 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$42,000.00 |
$40,000.00 |
$38,417.13 |
$30,000.00 |
$50,000.00 |
$89,760.00 |
| 390 | 221(C)2410 |
REINFORCED SILT FENCE | 6,412 | LF |
$4.00 |
$4.28 |
$5.04 |
$3.55 |
$3.50 |
$5.10 |
| 400 | 221(E)2600 |
TEMPORARY SILT DIKE | 602 | LF |
$14.00 |
$12.44 |
$14.66 |
$14.00 |
$16.00 |
$20.40 |
| 410 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 8 | EA |
$300.00 |
$422.00 |
$497.27 |
$465.00 |
$425.00 |
$510.00 |
| 420 | 229 6100 |
DITCH LINER PROTECTION | 1,101 | LF |
$3.00 |
$3.29 |
$3.88 |
$3.60 |
$3.50 |
$3.06 |
| 430 | 230(A)7200 |
SOLID SLAB SODDING | 49,000 | SY |
$3.00 |
$3.29 |
$3.88 |
$3.65 |
$3.50 |
$4.85 |
| 440 | 233(A)0200 |
VEGETATIVE MULCHING | 10.12 | AC |
$1,100.00 |
$885.00 |
$1,042.85 |
$950.00 |
$885.00 |
$3,060.00 |
| 450 | 241 3100 |
MOWING | 12.41 | AC |
$325.00 |
$368.00 |
$433.64 |
$400.00 |
$368.00 |
$510.00 |
| 460 | 307(K)4200 |
STABILIZED SUBGRADE | 15,393 | SY |
$7.50 |
$7.91 |
$7.57 |
$9.20 |
$10.25 |
$10.20 |
| 470 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 844 | TON |
$50.00 |
$37.00 |
$37.78 |
$40.00 |
$52.00 |
$61.20 |
| 480 | 407(B)7300 |
TACK COAT | 1,934 | GAL |
$5.00 |
$5.62 |
$5.38 |
$6.60 |
$6.60 |
$4.69 |
| 490 | 408 8100 |
PRIME COAT | 4,859 | GAL |
$5.00 |
$6.61 |
$5.70 |
$7.55 |
$7.20 |
$5.14 |
| 500 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,354 | TON |
$110.00 |
$120.14 |
$115.26 |
$134.00 |
$130.00 |
$119.75 |
| 510 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,425 | TON |
$120.00 |
$128.89 |
$121.58 |
$127.00 |
$140.00 |
$132.53 |
| 520 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 215 | CY |
$25.00 |
$50.00 |
$41.20 |
$30.00 |
$6.60 |
$25.00 |
| 530 | 509(A)0200 |
CLASS AA CONCRETE | 549 | CY |
$700.00 |
$525.00 |
$512.00 |
$700.00 |
$600.00 |
$582.00 |
| 540 | 509(D)0500 |
CLASS C CONCRETE | 230 | CY |
$500.00 |
$425.00 |
$600.00 |
$575.00 |
$400.00 |
$400.00 |
| 550 | 511(A)2200 |
REINFORCING STEEL | 80,854 | LB |
$1.50 |
$1.50 |
$1.18 |
$1.15 |
$1.00 |
$1.15 |
| 560 | 611(G)9004 |
INLET CDI RCP DES. 2 | 7 | EA |
$4,000.00 |
$4,250.00 |
$7,182.66 |
$3,200.00 |
$3,200.00 |
$5,100.00 |
| 570 | 611(H)0684 |
ADD'L DEPTH IN INLET CDI RCP DES. 2 | 34.3 | VF |
$450.00 |
$325.00 |
$886.99 |
$500.00 |
$500.00 |
$1,020.00 |
| 580 | 613(A)5216 |
24" R.C.PIPE CLASS III | 509 | LF |
$120.00 |
$97.50 |
$138.97 |
$95.00 |
$105.00 |
$168.30 |
| 590 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 284 | LF |
$70.00 |
$76.50 |
$84.91 |
$57.00 |
$89.00 |
$94.86 |
| 600 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 86 | LF |
$90.00 |
$62.00 |
$104.11 |
$60.00 |
$92.00 |
$125.46 |
| 610 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,700.00 |
$2,530.00 |
$2,085.47 |
$3,300.00 |
$2,100.00 |
$2,000.00 |
| 620 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$2,400.00 |
$3,170.00 |
$2,234.84 |
$3,850.00 |
$2,800.00 |
$2,400.00 |
| 630 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$18,750.00 |
$4,394.10 |
$20,000.00 |
$35,000.00 |
$47,940.00 |
| 640 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 8,680 | SY |
$8.00 |
$6.08 |
$5.55 |
$6.50 |
$7.50 |
$13.01 |
| 650 | 619(C)6600 |
SAWING PAVEMENT | 64 | LF |
$11.00 |
$5.00 |
$5.85 |
$10.00 |
$20.00 |
$10.00 |
| 660 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 4,682 | LF |
$10.00 |
$7.50 |
$9.13 |
$8.50 |
$12.50 |
$11.63 |
| 670 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$18,500.00 |
$12,801.66 |
$20,000.00 |
$15,000.00 |
$20,000.00 |
| 680 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,754 | CY |
$30.00 |
$10.00 |
$11.33 |
$10.00 |
$14.25 |
$12.75 |
| 690 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 289 | CY |
$40.00 |
$50.00 |
$14.22 |
$30.00 |
$45.00 |
$25.00 |
| 700 | 509(A)0210 |
CLASS AA CONCRETE | 547.5 | CY |
$800.00 |
$495.00 |
$608.32 |
$675.00 |
$600.00 |
$558.15 |
| 710 | 511(A)2210 |
REINFORCING STEEL | 100,190 | LB |
$1.50 |
$1.50 |
$1.14 |
$1.15 |
$1.00 |
$1.15 |
| 720 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$10,000.00 |
$21,486.78 |
$20,000.00 |
$15,000.00 |
$8,000.00 |
| 730 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 3,890 | CY |
$30.00 |
$9.00 |
$10.66 |
$10.00 |
$14.25 |
$12.75 |
| 740 | 202(D)2510 |
UNCLASSIFIED BORROW | 1,605 | CY |
$40.00 |
$12.00 |
$15.33 |
$15.00 |
$18.00 |
$23.46 |
| 750 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 368 | CY |
$40.00 |
$50.00 |
$13.24 |
$30.00 |
$45.00 |
$25.00 |
| 760 | 509(A)0210 |
CLASS AA CONCRETE | 641.2 | CY |
$800.00 |
$445.00 |
$580.12 |
$675.00 |
$600.00 |
$572.00 |
| 770 | 511(A)2210 |
REINFORCING STEEL | 116,450 | LB |
$1.50 |
$1.50 |
$1.14 |
$1.15 |
$1.00 |
$1.15 |
| 780 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 480 | TON |
$70.00 |
$66.00 |
$64.25 |
$63.00 |
$90.00 |
$86.70 |
| 790 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 105 | TON |
$60.00 |
$55.00 |
$49.24 |
$42.00 |
$82.00 |
$63.24 |
| 800 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$10,000.00 |
$21,486.78 |
$20,000.00 |
$15,000.00 |
$35,000.00 |
| 810 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 45 | SD |
$75.00 |
$135.00 |
$176.75 |
$155.00 |
$150.00 |
$137.70 |
| 820 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 22,610 | SD |
$0.4000 |
$0.3500 |
$0.3500 |
$0.3200 |
$0.6000 |
$0.3600 |
| 830 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,140 | SD |
$0.7500 |
$0.7500 |
$2.36 |
$2.05 |
$3.00 |
$0.7700 |
| 840 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,520 | SD |
$1.50 |
$2.00 |
$1.47 |
$1.30 |
$1.75 |
$2.04 |
| 850 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,140 | SD |
$1.50 |
$5.00 |
$4.71 |
$4.10 |
$5.00 |
$5.10 |
| 860 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,660 | SD |
$1.50 |
$0.6000 |
$2.36 |
$2.10 |
$3.00 |
$0.6100 |
| 870 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 2,280 | SD |
$1.00 |
$0.4000 |
$3.54 |
$3.10 |
$4.25 |
$0.4100 |
| 880 | 880(G)6805 |
CHANNELIZER CONES | 450 | SD |
$0.4000 |
$0.2500 |
$1.18 |
$1.10 |
$1.50 |
$0.2600 |
| 890 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$75.00 |
$35.00 |
$41.24 |
$37.00 |
$40.00 |
$35.70 |
| 900 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$100.00 |
$100.00 |
$117.84 |
$110.00 |
$125.00 |
$102.00 |
| 910 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 38 | SF |
$45.00 |
$46.50 |
$64.81 |
$60.00 |
$65.00 |
$47.43 |
| 920 | 851(C)2415 |
2" SQUARE TUBE POST | 74 | LF |
$10.00 |
$11.00 |
$14.14 |
$13.00 |
$15.00 |
$11.22 |
| 930 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 13,500 | LF |
$0.8000 |
$0.9200 |
$1.47 |
$2.15 |
$1.60 |
$0.9400 |
| 940 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$20,000.00 |
$20,267.78 |
$24,200.00 |
$25,000.00 |
$22,440.00 |
| 950 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$5,302.62 |
$4,000.00 |
$6,000.00 |
$5,000.00 |
| 960 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$265,000.00 |
$235,000.00 |
$245,000.00 |
$250,000.00 |
$240,000.00 |
$272,000.00 |