Filtered by: County: Bryan Clear all
| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 12, 2024 | 240216 STP-207D(125)CI | BryanDivision 2 | COUNTY ROAD (FOREST LANE) | Bridge And Approaches COUNTY ROAD (FOREST LANE): OVER LITTLE BLUE RIVER, 2.7 MILES WEST OF SH-78 NEAR COBB. | $1,528,528 | Let | HUB Construction, Inc. $1,484,728 · -2.9% | |
| Oct 17, 2024 | 240242 STP-207C(124)PM | AtokaBryanDivision 2 | SH-48 | Widen, Resurface, And Bridge SH-48: FROM 1.0 MILE NORTH OF THE SH-78 JUNCTION, EXTEND NORTH NEAR KENEFIC. | — | Let | THE CUMMINS CONSTRUCTION CO., INC. $16,546,697 · | |
| Nov 21, 2024 | 240259 BRO-264F(108)CB | BryanLefloreMccurtainPittsburg+1 moreDivision 2 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT II. | $186,803 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $246,765 · +32.1% | |
| Mar 13, 2025 | 250064 SAP-207D(134)ES | BryanDivision 2 | CITY STREET (RED BUD LN) | Bridge Repair CITY STREET (RED BUD LN): OVER US-69/US-75, IN THE CITY OF DURANT. | $121,788 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $82,020 · -32.7% | |
| May 15, 2025 | 250063 STP-207C(130)AD | BryanDivision 2 | SH-22 | Pedestrian Improvements (Sidewalk) SH-22: FROM 0.1 MI EAST OF THE US-69 INTERSECTION, EXTEND EAST IN CADDO. | $653,294 | Let | HUB Construction, Inc. $667,635 · +2.2% | |
| May 15, 2025 | 250119 NHPP-022N(257)3P | BryanDivision 2 | US-70 | Resurface (Asphalt) US-70: FROM 0.3 MILES EAST OF THE US-75 INTERCHANGE, EXTEND EAST IN DURANT. | $1,592,968 | Let | OVERLAND CORPORATION $1,829,516 · +14.8% | |
| May 30, 2025 | 250220 E-SAP-022N(270)ES | BryanDivision 2 | US-70 (ROOSEVELT MEMORIAL BRIDGE) | Emergency Bridge Repair (Causeway) US-70 (ROOSEVELT MEMORIAL BRIDGE): EMERGENCY CAUSEWAY REPAIR OVER LAKE TEXOMA, 6.25 MILES EAST OF THE SH-32 INTERSECTION NEAR KINGSTON. | $6,856,417 | Let | BRIDGECO CONTRACTORS, INC. $5,469,872 · -20.2% | |
| Jun 12, 2025 | 250157 SSP-264F(117)PM | BryanMarshallDivision 2 | US-377US-69 | Bridge Waterproof Seal US-69 / US-377: OVER CHOCTAW ROAD, MAIN STREET, AND LAKE TEXOMA AT MULTIPLE LOCATIONS IN DISTRICT II. | — | Let | PBX Corporation $427,678 · | |
| Sep 11, 2025 | 250240 STP-264F(109)PM | AtokaBryanChoctawLatimer+5 moreDivision 2 | SH-375US-271US-59US-69+1 more | Signing US-59/US-69/US-70/US-271/SH-375: AT MULTIPLE LOCATIONS IN DISTRICT II. | $1,577,164 | Let | ACTION SAFETY SUPPLY CO., LLC $1,201,227 · -23.8% | |
| Oct 16, 2025 | 250296 BRO-207F(135)CB | BryanDivision 2 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT II. | $105,733 | Let | PBX Corporation $211,221 · +99.8% | |
| Mar 12, 2026 | 260048 SSR-207C(136)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE US-69 JUNCTION, EXTEND EAST NEAR COLBERT AND ACHILLE. | — | Let | ||
| Mar 12, 2026 | 260049 SSR-207C(137)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT. | — | Let | ||
| Mar 12, 2026 | 260050 SSR-207C(136)SR / SSR-207C(137)SR | BryanDivision 2 | SH-91 | Resurface (Asphalt) SH-91: FROM THE TEXAS STATE LINE, EXTEND NORTH THEN EAST NEAR COLBERT AND ACHILLE. | — | Let | OVERLAND CORPORATION $4,164,235 · | |
| May 7, 2026 | 260124 NHPP-013N(249)PM | BryanDivision 2 | US-69 | Bridge And Approaches US-69: OVER ARKANSAS STREET, KIAMICHI RAILROAD, AND MAIN STREET, 1.8 MILES NORTH OF THE US-70 INTERCHANGE IN THE CITY OF DURANT. | $21,907,548 | Let | Built Right Construction, LLC $18,992,382 · -13.3% | |
| Sep 17, 2026 | 260156 STP-207B(129)PM | BryanDivision 2 | SH-78 | Intersection Modification SH-78: AT THE INTERSECTION OF GERLACH DRIVE IN DURANT. | $6,335,269 | Let | BRIDGECO CONTRACTORS, INC. $6,872,563 · +8.5% | |
| Sep 17, 2026 | 260240 HSIPG-299S(495)TR | AtokaBryanComancheCraig+8 moreDivision 2 | I-35SH-7SH-74SH-9+4 more | Traffic Signal Safety Improvement I-35/US-62/US-69/US-70/US-271/SH-7/SH-9/SH-74: AT MULTIPLE LOCATIONS IN DISTRICTS I, II, III, VII, AND VIII. | $748,986 | Let | Lighthouse Transportation Group, LLC $808,785 · +8.0% | |
| Jul 1, 2028 estimated | 35186(04) NHPP-022N(253)FP | BryanDivision 2 | US-70 | Grade, Drain & Surface US-70: RAMPS AT EAST MAIN STREET IN DURANT, APPROX 3.0 MI EAST OF SH-78 | $2,700,000 | Planned | ||
| FY 2034 | 36281(04) J3-6281(004)PM | BryanDivision 2 | US-69 | Resurface US-69 NORTHBOUND: BEGIN APPROXIMATELY 6.8 MILES NORTH OF JUNCTION US-70, EXTEND NORTH APPROXIMATELY 7.5 MILES | $7,700,000 | Planned | ||
| FY 2035 | 24411(04) J2-4411(004) | BryanMarshallDivision 2 | SH-199 | Widen & Resurface SH-199: FROM APPROX. 6.6 MI EAST OF JCT SH-99, EXTEND EAST APPROX. 5.3 MI | $15,000,000 | Planned | ||
| FY 2035 | 33870(04) J3-3870(004) | BryanDivision 2 | US-69 | Grade,Drain,Bridge & Surface US-69: FROM APPROX 4.25 MI NORTH OF THE OK/TX STATE LINE, EXT NORTH APPROX 4.5 MI | $25,000,0001 items | Planned |
1–20 of 20
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.