| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$2,500.00 |
$6,291.24 |
$15,260.00 |
$10,000.00 |
$2,000.00 |
$11,550.00 |
$10,000.00 |
| 20 | 201(B)1300 |
SELECTIVE CLEARING | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$4,417.94 |
$4,087.50 |
$7,500.00 |
$3,500.00 |
$11,550.00 |
$10,000.00 |
| 30 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 71.25 | CY |
$10.00 |
$12.00 |
$86.38 |
$21.80 |
$20.00 |
$25.00 |
$63.49 |
$35.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 97.5 | CY |
$15.00 |
$71.00 |
$73.76 |
$38.15 |
$30.00 |
$25.00 |
$57.99 |
$50.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,182 | LF |
$3.00 |
$2.50 |
$2.75 |
$4.36 |
$2.50 |
$4.00 |
$1.10 |
$5.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 7 | LF |
$15.00 |
$10.00 |
$8.80 |
$54.50 |
$8.00 |
$25.00 |
$5.50 |
$25.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 2,938 | SY |
$7.50 |
$5.00 |
$4.95 |
$6.54 |
$4.50 |
$5.00 |
$7.70 |
$5.00 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 0.58 | AC |
$1,500.00 |
$250.00 |
$990.00 |
$2,725.00 |
$900.00 |
$1,500.00 |
$11,000.00 |
$12,000.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 0.58 | AC |
$1,500.00 |
$550.00 |
$1,320.00 |
$2,725.00 |
$1,200.00 |
$2,000.00 |
$55,000.00 |
$5,000.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 109.25 | CY |
$115.00 |
$105.00 |
$108.74 |
$107.91 |
$175.00 |
$85.00 |
$45.98 |
$80.00 |
| 110 | 609(B)4330 |
1'-8" COMB.CRB.& GUT.(6" BARRIER) | 230 | LF |
$45.00 |
$35.00 |
$48.15 |
$27.25 |
$70.00 |
$50.00 |
$63.40 |
$60.00 |
| 120 | 609(C)4400 |
CONCRETE HEADER CURB (6"X 16") | 365 | LF |
$35.00 |
$25.00 |
$39.71 |
$27.25 |
$35.00 |
$40.00 |
$53.65 |
$55.00 |
| 130 | 610(A)5200 |
4" CONCRETE SIDEWALK | 2,719.75 | SY |
$65.00 |
$70.00 |
$73.57 |
$67.53 |
$92.00 |
$80.00 |
$96.53 |
$125.00 |
| 140 | 610(A)5220 |
6" CONCRETE SIDEWALK | 426.01 | SY |
$65.00 |
$75.00 |
$85.18 |
$80.30 |
$105.00 |
$90.00 |
$131.46 |
$250.00 |
| 150 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 570 | SY |
$75.00 |
$95.00 |
$86.96 |
$80.30 |
$125.00 |
$100.00 |
$131.46 |
$150.00 |
| 160 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 417 | SF |
$35.00 |
$35.00 |
$44.04 |
$31.66 |
$26.40 |
$35.00 |
$42.00 |
$45.00 |
| 170 | 611(G)7700 |
SPECIAL INLET DRAIN | 6 | EA |
$6,000.00 |
$3,200.00 |
$4,342.79 |
$5,277.23 |
$2,500.00 |
$2,500.00 |
$165.00 |
$4,000.00 |
| 180 | 613(E)5900 |
18" CORRUGATED POLYETHYLENE PIPE | 16 | LF |
$125.00 |
$70.29 |
$148.27 |
$66.23 |
$100.00 |
$75.00 |
$165.00 |
$125.00 |
| 190 | 613(EE)5965 |
15" CORRUGATED POLYPROPYLENE PIPE | 5 | LF |
$100.00 |
$120.00 |
$178.22 |
$58.90 |
$150.00 |
$100.00 |
$137.50 |
$110.00 |
| 200 | 613(L)6704 |
15" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$750.00 |
$1,400.00 |
$525.54 |
$486.65 |
$200.00 |
$550.00 |
$825.00 |
$500.00 |
| 210 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$900.00 |
$1,800.00 |
$586.78 |
$670.21 |
$250.00 |
$550.00 |
$1,100.00 |
$750.00 |
| 220 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$3,500.00 |
$6,291.24 |
$2,725.00 |
$2,000.00 |
$2,000.00 |
$5,654.40 |
$5,000.00 |
| 230 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 12 | LF |
$10.00 |
$35.00 |
$39.97 |
$21.80 |
$15.00 |
$15.00 |
$47.12 |
$25.00 |
| 240 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 130 | SY |
$10.00 |
$25.00 |
$15.71 |
$16.35 |
$15.00 |
$10.00 |
$4.35 |
$25.00 |
| 250 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 242 | SY |
$10.00 |
$15.00 |
$13.37 |
$10.90 |
$6.00 |
$10.00 |
$23.37 |
$25.00 |
| 260 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 335 | SY |
$10.00 |
$10.00 |
$8.37 |
$10.90 |
$4.00 |
$10.00 |
$16.88 |
$25.00 |
| 270 | 619(B)6404 |
REMOVAL OF SIDEWALK | 1,154 | SY |
$10.00 |
$8.00 |
$10.40 |
$13.08 |
$4.00 |
$10.00 |
$29.40 |
$25.00 |
| 280 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 30 | LF |
$10.00 |
$20.00 |
$33.99 |
$5.45 |
$15.00 |
$10.00 |
$27.50 |
$25.00 |
| 290 | 619(C)6600 |
SAWING PAVEMENT | 725 | LF |
$7.00 |
$8.00 |
$5.54 |
$6.54 |
$6.00 |
$13.00 |
$5.50 |
$5.00 |
| 300 | 622(A)0210 |
1 1/2" PIPE RAILING | 417 | LF |
$100.00 |
$150.00 |
$119.11 |
$140.06 |
$157.00 |
$250.00 |
$280.50 |
$150.00 |
| 310 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 2 | EA |
$320.00 |
$200.00 |
$306.25 |
$327.00 |
$250.00 |
$350.00 |
$495.00 |
$500.00 |
| 320 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 5 | EA |
$3,500.00 |
$8,600.00 |
$5,500.00 |
$8,556.50 |
$7,850.00 |
$10,000.00 |
$8,635.00 |
$9,500.00 |
| 330 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$175.00 |
$400.00 |
$275.00 |
$436.00 |
$400.00 |
$500.00 |
$495.00 |
$1,500.00 |
| 340 | 836 7100 |
REGULATORY OR WARNING SIGN ASSEMBLY | 4 | EA |
$6,000.00 |
$9,400.00 |
$9,350.00 |
$10,137.00 |
$9,300.00 |
$11,000.00 |
$10,230.00 |
$11,000.00 |
| 350 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 95 | SF |
$25.00 |
$18.00 |
$27.50 |
$19.62 |
$18.00 |
$25.00 |
$19.80 |
$80.00 |
| 360 | 851(C)2415 |
2" SQUARE TUBE POST | 22 | LF |
$13.00 |
$8.00 |
$16.50 |
$8.72 |
$8.00 |
$11.00 |
$8.80 |
$80.00 |
| 370 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 685 | LF |
$20.00 |
$22.00 |
$19.80 |
$24.85 |
$22.80 |
$25.00 |
$25.08 |
$30.00 |
| 380 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,760 | SD |
$0.7500 |
$4.92 |
$1.10 |
$5.34 |
$4.90 |
$4.90 |
$5.39 |
$0.0100 |
| 390 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,415 | SD |
$1.25 |
$4.95 |
$1.65 |
$5.34 |
$4.90 |
$4.90 |
$5.39 |
$0.0100 |
| 400 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,485 | SD |
$2.50 |
$1.20 |
$0.1100 |
$1.09 |
$1.00 |
$1.00 |
$1.10 |
$0.0100 |
| 410 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 43,125 | SD |
$0.1500 |
$0.0500 |
$0.0100 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0100 |
| 420 | 880(G)6805 |
CHANNELIZER CONES | 39,392.45 | SD |
$0.7500 |
$0.0500 |
$0.3300 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0100 |
| 430 | 880(I)7000 |
FLAGGER | 50 | SD |
$100.00 |
$150.00 |
$110.02 |
$163.50 |
$120.00 |
$5.00 |
$71.50 |
$300.00 |
| 440 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$10,529.62 |
$19,620.00 |
$11,000.00 |
$21,000.00 |
$9,350.00 |
$15,000.00 |
| 450 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$5,071.41 |
$2,725.00 |
$1,500.00 |
$3,500.00 |
$6,050.00 |
$5,000.00 |
| 460 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$55,014.43 |
$35,000.00 |
$63,232.34 |
$64,277.76 |
$64,000.00 |
$55,000.00 |
$50,062.73 |
$70,000.00 |