| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-80835-0001 1808350001 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Pavement Bridge Rehabilitation At Ill 171 (1st Ave) & at 5th Ave | $37,000,000 | Planned | ||
| — | 1-80835-1000 1808351000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Pavement Water Main, Storm Sewer (New) 22nd St to Des Plaines River | $15,000,000 | Planned | ||
| — | 1-80837-0000 1808370000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At 9th Ave (Overhead) | $9,550,000 | Planned | ||
| — | 1-80838-0000 1808380000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At 17th Ave (Overhead) | $9,680,000 | Planned | ||
| — | 1-80846-0000 1808460000 | District 1 | Troy RdUS-52 | Safety Intersection Reconstn At County Line Rd | $7,000,000 | Planned | ||
| — | 1-80847-0000 1808470000 | District 1 | IL-47Main St | Preservation - Pavements Ultra-Thin Bnd Wr Course Ware Rd to Ill 173 | $2,500,000 | Planned | ||
| — | 1-80872-0000 1808720000 | District 1 | IL-60IL-83 | Preservation - Pavements Smart Overlay NW of Diamond Lake Rd to Des Plaines River Rd | $5,850,000 | Planned | ||
| — | 1-80876-0000 1808760000 | District 1 | Antioch RdIL-137 | Preservation - Pavements Smart Overlay US 45 (Lake St) to E of Ill 21 (Milwaukee Ave) | $2,221,000 | Planned | ||
| — | 1-80877-0000 1808770000 | District 1 | Grand AveIL-132 | Preservation - Pavements Smart Overlay Central Ave to W of Sheehan Dr | $760,000 | Planned | ||
| — | 1-80880-0000 1808800000 | District 1 | IL-21Milwaukee AveUS-45 | Preservation - Pavements Smart Overlay Church St to Chevy Chase Dr | $16,600,000 | Planned | ||
| — | 1-80887-0000 1808870000 | District 1 | Lake StUS-20 | Preservation - Pavements Smart Overlay, Standard Overlay Ramp to I-390 (Elgin-O'Hare Expwy) to E of Greenbrook Blvd & W of Arlington Dr/Bartels Rd to E of Springfield Dr | $4,400,000 | Planned | ||
| — | 1-80890-0000 1808900000 | District 1 | Eisenhower ExpwyI-290US-20 | Maintenance - Bridges Bridge Repair, Bridge Joint Replace/Repair Addison Rd to I-88 | $3,000,000 | Planned | ||
| — | 1-80890-0010 1808900010 | District 1 | Eisenhower ExpwyI-290US-20 | Rehabilitation - Pavement Standard Overlay, Patching Addison Rd to I-88 | $5,000,000 | Planned | ||
| — | 1-80891-0000 1808910000 | District 1 | I-80 | Rehabilitation - Bridges Bridge New Deck, Bridge Repair At Ill 43 (Harlem Ave) (Overhead) | $4,000,000 | Planned | ||
| — | 1-80893-0000 1808930000 | District 1 | Service Road | Miscellaneous Improvement Bridge Removal/Demolition (West Elevated) Over 26th St Connection | $300,000 | Planned | ||
| — | 1-80894-0000 1808940000 | District 1 | I-55 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Caton Farm Rd (Overhead) 3 Mi N of US 52 | $1,000,000 | Planned | ||
| — | 1-80896-0000 1808960000 | District 1 | Dundee RdIL-68 | Safety Intersection Improvement, ADA Improvements At Wille Ave/Milwaukee Pl | $665,000 | Planned | ||
| — | 1-80903-0000 1809030000 | District 1 | IL-64North Ave | Preservation - Pavements Smart Overlay Central Park Ave to Damen Ave | $1,060,000 | Planned | ||
| — | 1-80925-0000 1809250000 | District 1 | 111th St | Rehabilitation - Pavement Designed Overlay Pulaski Rd to Sacramento Ave | $800,000 | Planned | ||
| — | 1-80949-0000 1809490000 | District 1 | Lincoln Ave | Safety Safety Improvements, Pavement Marking, ADA Improvements Niles Center Rd to Howard St | $530,000 | Planned | ||
| — | 1-80952-0000 1809520000 | District 1 | Governors Hwy | Safety Intersection Reconstn At University Pkwy | $9,000,000 | Planned | ||
| — | 1-80954-0000 1809540000 | District 1 | Ogden AveUS-34 | Reconstruction - Bridges Culvert Replacement, Scour Mitigation At Cress Creek W of Benedetti Dr | $550,000 | Planned | ||
| — | 1-80955-0000 1809550000 | District 1 | IL-1Route 1 Cutoff | Reconstruction - Bridges Culvert Replacement Thorn Creek Trib 0.6 Mi N of US 30 | $1,500,000 | Planned | ||
| — | 1-80956-0000 1809560000 | District 1 | IL-47 | Reconstruction - Bridges Culvert Replacement Over Pingree Creek (3.6 Mi S of US 20/ILL 72) | $300,000 | Planned | ||
| — | 1-80958-1000 1809581000 | District 1 | IL-53 | Reconstruction - Pavement Reconstruction Hoff Rd to N of River Rd | $35,000,000 | Planned | ||
| — | 1-80959-0000 1809590000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (EB) | $15,800,000 | Planned | ||
| — | 1-80959-1000 1809591000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (WB) | $15,800,000 | Planned | ||
| — | 1-80972-1000 1809721000 | District 1 | Coal City RdIL-113 | Maintenance - Pavements Shoulder Reconstruction, Drainage I-55 to ILL 53 (Front St) | $500,000 | Planned | ||
| — | 1-80975-0000 1809750000 | District 1 | Western Ave | Preservation - Pavements Smart Overlay 115th St to S of 135th Pl | $6,000,000 | Planned | ||
| — | 1-80976-0000 1809760000 | District 1 | IL-83Ivanhoe Rd | Preservation - Pavements Smart Overlay, Standard Overlay N of Peterson Rd to Winchester Rd | $1,000,000 | Planned | ||
| — | 1-81016-0000 1810160000 | District 1 | US-41US-41 /Skokie Hwy | Preservation - Pavements Smart Overlay Lake-Cook Rd to I-94 (Edens Expwy) | $1,535,000 | Planned | ||
| — | 1-81017-0000 1810170000 | District 1 | IL-83Sibley Blvd | Preservation - Pavements Smart Overlay Oakley Ave to Ill 83 (Torrence Ave) | $12,250,000 | Planned | ||
| — | 1-81030-0000 1810300000 | District 1 | Lake StUS-20 | Preservation - Pavements Crack & Joint Sealing Glen Ellyn Rd to I-355 (Veterans Memorial Tollway) | $225,000 | Planned | ||
| — | 1-81049-0000 1810490000 | District 1 | 159th StUS-6 | Preservation - Pavements Crack & Joint Sealing 94th Ave to Western Ave | $830,000 | Planned | ||
| — | 1-81116-0000 1811160000 | District 1 | I-90I-94Kennedy Expwy | Maintenance - Bridges Bridge Deck Overlay At Ogden Ave (SB) (Overhead) | $4,500,000 | Planned | ||
| — | 1-81117-0000 1811170000 | District 1 | I-57 | Rehabilitation - Bridges Bridge Superstructure Replace At Vollmer Rd (Overhead) | $9,500,000 | Planned | ||
| — | 1-81118-0000 1811180000 | District 1 | I-90I-94Kennedy Expwy | Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay At Grand Ave | $8,500,000 | Planned | ||
| — | 1-81119-0000 1811190000 | District 1 | I-90I-94Kennedy Expwy | Maintenance - Bridges Bridge Deck Overlay At Ogden Ave (NB) (Overhead) | $5,000,000 | Planned | ||
| — | 1-81121-0000 1811210000 | District 1 | IL-53Ruby St | Preservation - Bridges Bridge Painting, Bridge Repair At Des Plaines River | $10,000,000 | Planned | ||
| — | 1-81122-0000 1811220000 | District 1 | Mcdonough StUS-52US-6 | Maintenance - Bridges Bridge Repair At Des Plaines River | $3,500,000 | Planned | ||
| — | 1-81123-0000 1811230000 | District 1 | Eisenhower ExpwyI-290IL-110 | Maintenance - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay At Racine Ave (Overhead) | $8,000,000 | Planned | ||
| — | 1-81124-0000 1811240000 | District 1 | US-20 | Reconstruction - Bridges Culvert Replacement At Drainage Ditch E of Thorne Rd | $5,000,000 | Planned | ||
| — | 1-81125-0000 1811250000 | District 1 | 96th AveUS-45US-52 | Reconstruction - Bridges Bridge Replacement Rock Creek (S Branch of Forked Creek) | $1,500,000 | Planned | ||
| — | 1-81127-0000 1811270000 | District 1 | Edens ExpwyI-94 | Maintenance - Bridges Bridge Repair At Touhy Ave (Overhead) | $8,930,000 | Planned | ||
| — | 1-81128-0000 1811280000 | District 1 | Butterfield RdIL-56 | Maintenance - Pavements Drainage, Erosion Control Technology Dr to Fountain Square Dr | $2,000,000 | Planned | ||
| — | 1-81129-0000 1811290000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) | $50,000,000 | Planned | ||
| — | 1-81129-0010 1811290010 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) | $4,250,000 | Planned | ||
| — | 1-81129-1000 1811291000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Wolf Rd to Ill 50 (Cicero Ave) & DCM | $50,000,000 | Planned | ||
| — | 1-81129-2000 1811292000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) | $50,000,000 | Planned | ||
| — | 1-81129-2010 1811292010 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) | $2,000,000 | Planned | ||
| — | 1-81137-0000 1811370000 | District 1 | Higgins RdIL-72 | Rehabilitation - Pavement Standard Overlay E of Fairview Ave to I-90 Ramp (WB) | $3,105,000 | Planned | ||
| — | 1-81144-0000 1811440000 | District 1 | US-45 | Safety Intersection Reconstn At Buffalo Grove Rd | $10,000,000 | Planned | ||
| — | 1-81144-0400 1811440400 | District 1 | US-45 | Safety Utility Adjustment At Buffalo Grove Rd | $100,000 | Planned | ||
| — | 1-81151-0000 1811510000 | District 1 | Pulaski Rd/crawfor | Safety Traf Signal Modernization, Left Turn Lanes, Right Turn Lane At 167th St | $1,550,000 | Planned | ||
| — | 1-81153-0000 1811530000 | District 1 | Cottage Grove Ave | Safety Safety Improvements, Pavement Marking, ADA Improvements ILL 83 (Sibley Blvd) to 154th St | $500,000 | Planned | ||
| — | 1-81155-0000 1811550000 | District 1 | Forest Preserve Dr | Rehabilitation - Pavement Standard Overlay Belmont Ave to Montrose Ave | $2,957,000 | Planned | ||
| — | 1-81156-0000 1811560000 | District 1 | 5th Ave | Rehabilitation - Pavement Standard Overlay Hemingway Dr to Ill 64 (North Ave) | $688,000 | Planned | ||
| — | 1-81159-0000 1811590000 | District 1 | Broadway StIL-53IL-7 | Miscellaneous Improvement Retaining Wall S of Caton Farm Rd | $1,000,000 | Planned | ||
| — | 1-81176-0000 1811760000 | District 1 | US-14 | Preservation - Pavements Smart Overlay E of Ill 47 (Eastwood Dr) to W Lake Shore Dr | $825,000 | Planned | ||
| — | 1-81177-0000 1811770000 | District 1 | IL-176Telegraph St | Preservation - Pavements Smart Overlay Ill 23 (N State St) to Ill 47 (Eastwood Dr) | $4,550,000 | Planned | ||
| — | 1-81180-0000 1811800000 | District 1 | IL-53Rand Rd | Preservation - Pavements Smart Overlay Lake-Cook Rd to Ill 58 (Golf Rd) | $19,105,000 | Planned | ||
| — | 1-81181-0000 1811810000 | District 1 | Elmhurst RdIL-83 | Preservation - Pavements Smart Overlay S of Palatine Rd to Prospect Ave | $4,800,000 | Planned | ||
| — | 1-81183-0000 1811830000 | District 1 | IL-176 | Preservation - Pavements Smart Overlay NW of Ill 31 to Fox River | $2,450,000 | Planned | ||
| — | 1-81184-0000 1811840000 | District 1 | Lee / Mannheim RdUS-12 AUS-45 | Preservation - Pavements Smart Overlay Graceland Ave to Jefferson/Market St | $695,000 | Planned | ||
| — | 1-81186-0000 1811860000 | District 1 | Roosevelt Rd | Preservation - Pavements Smart Overlay US 12/20/45 (LaGrange Rd) to Des Plaines Ave | $7,740,000 | Planned | ||
| — | 1-81188-0000 1811880000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Smart Overlay Orchard Pl to Ill 171 (Cumberland Ave) | $5,100,000 | Planned | ||
| — | 1-81189-0000 1811890000 | District 1 | Bobby E Thompson EIL-137 | Preservation - Pavements Smart Overlay S of Belvidere St to Lakeview Ave | $675,000 | Planned | ||
| — | 1-81191-0000 1811910000 | District 1 | US-30 | Preservation - Pavements Smart Overlay E of Orchard Rd to Ill 31 (Lake St) | $340,000 | Planned | ||
| — | 1-81192-0000 1811920000 | District 1 | Barnard Mill RdIL-31 | Preservation - Pavements Smart Overlay Barnard Mill Rd/Beck Dr to W Johnsburg Rd | $1,165,000 | Planned | ||
| — | 1-81194-0000 1811940000 | District 1 | Algonquin RdIL-62 | Preservation - Pavements Smart Overlay NW of Bolz Rd to Royal Way | $260,000 | Planned | ||
| — | 1-81195-0000 1811950000 | District 1 | Archer AveIL-171 | Preservation - Pavements Smart Overlay Division St to Boula Ave | $2,735,000 | Planned | ||
| — | 1-81197-0000 1811970000 | District 1 | Dundee RdIL-68 | Preservation - Pavements Smart Overlay Des Plaines River to I-94 (Edens Expwy) | $10,320,000 | Planned | ||
| — | 1-81198-0000 1811980000 | District 1 | Dundee RdIL-68 | Preservation - Pavements Smart Overlay George Rd to 1st St | $1,620,000 | Planned | ||
| — | 1-81199-0000 1811990000 | District 1 | 143rd StIL-7 | Rehabilitation - Pavement Widening & Resurfacing West Ave to Southwest Hwy | $2,000,000 | Planned | ||
| — | 1-81200-0000 1812000000 | District 1 | Grant HwyUS-20 | Preservation - Pavements Smart Overlay County Line Rd to West St | $3,250,000 | Planned | ||
| — | 1-81204-0000 1812040000 | District 1 | Dundee RdIL-53IL-68 | Preservation - Pavements Smart Overlay Trailside Ct to Ill 53 | $6,000,000 | Planned | ||
| — | 1-81207-0000 1812070000 | District 1 | IL-43IL-58US-14 | Preservation - Pavements Smart Overlay Emerson St to US 14 (Caldwell Ave) | $2,430,000 | Planned | ||
| — | 1-81208-0000 1812080000 | District 1 | Ogden AveUS-34 | Preservation - Pavements Smart Overlay N Jackson Rd to N County Line Rd | $2,050,000 | Planned | ||
| — | 1-81209-0000 1812090000 | District 1 | IL-56 | Preservation - Pavements Smart Overlay Ill 47 to W of Ramp At I-88 | $4,900,000 | Planned | ||
| — | 1-81210-0000 1812100000 | District 1 | Rand RdUS-12 | Preservation - Pavements Smart Overlay N of Ill 22 to Lake-Cook Rd | $7,295,000 | Planned | ||
| — | 1-81212-0000 1812120000 | District 1 | Cass StUS-30 | Preservation - Pavements Smart Overlay E of Clinton Ave to I-80 | $3,165,000 | Planned | ||
| — | 1-81213-0000 1812130000 | District 1 | IL-176Liberty St | Preservation - Pavements Smart Overlay E of Larkdale Row to W of N Forest Preserve Rd | $2,520,000 | Planned | ||
| — | 1-81214-0000 1812140000 | District 1 | IL-176Liberty St | Preservation - Pavements Smart Overlay Fort Hill Trail to E of Hilltop Ter | $1,380,000 | Planned | ||
| — | 1-81215-0000 1812150000 | District 1 | Algonquin RdIL-62 | Preservation - Pavements Smart Overlay Palatine/Schaumburg Municipal Border to Plum Grove Rd | $1,620,000 | Planned | ||
| — | 1-81216-0000 1812160000 | District 1 | Barrington Rd | Preservation - Pavements Smart Overlay S of Ill 72 (Higgins Rd) to N of US 20 (Lake St) | $12,350,000 | Planned | ||
| — | 1-81217-0000 1812170000 | District 1 | Ogden AveUS-34 | Preservation - Pavements Smart Overlay SW of Aurora Rd/Raymond Dr to W of Walnut Ave | $11,210,000 | Planned | ||
| — | 1-81218-0000 1812180000 | District 1 | IL-176 | Preservation - Pavements Smart Overlay McHenry/Lake Co Line to W of Williams Park Rd | $1,155,000 | Planned | ||
| — | 1-81219-0000 1812190000 | District 1 | I-55 | Preservation - Pavements Smart Overlay N of Kennedy Dr to I-55 NB Ramp to Ill 129/Frontage Rd | $7,000,000 | Planned | ||
| — | 1-81221-0000 1812210000 | District 1 | Calumet ExpwyIL-394 | Preservation - Pavements Smart Overlay E Steger Rd to N of Village Woods Dr | $7,045,000 | Planned | ||
| — | 1-81223-0000 1812230000 | District 1 | Lake StUS-20 | Preservation - Pavements Smart Overlay Bluff City Blvd to S of Naperville Rd/Elizabeth Dr | $2,140,000 | Planned | ||
| — | 1-81224-0000 1812240000 | District 1 | 14th StUS-30 | Preservation - Pavements Smart Overlay W of Indiana St/ Indiana Cir to Hilltop Ave | $3,045,000 | Planned | ||
| — | 1-81225-0000 1812250000 | District 1 | IL-21 | Preservation - Pavements Smart Overlay Dearlove Rd to Harlem Ave | $8,530,000 | Planned | ||
| — | 1-81227-0000 1812270000 | District 1 | Chicago StIL-53US-52 | Preservation - Pavements Smart Overlay US 52 (Doris Ave) to W Manhattan Rd | $8,500,000 | Planned | ||
| — | 1-81228-0000 1812280000 | District 1 | IL-59New Sutton Rd | Preservation - Pavements Smart Overlay Bartlett Rd to Spring Creek/Arboretum Blvd | $2,400,000 | Planned | ||
| — | 1-81229-0000 1812290000 | District 1 | Hawthorne RdIL-59IL-68 | Preservation - Pavements Smart Overlay Ill 68 (Dundee Rd) to Ill 62 (Algonquin Rd) | $1,600,000 | Planned | ||
| — | 1-81232-0000 1812320000 | District 1 | IL-19Irving Park Rd | Preservation - Pavements Smart Overlay 25th Ave to Des Plaines River | $1,400,000 | Planned | ||
| — | 1-81233-0000 1812330000 | District 1 | Harlem AveIL-43 | Preservation - Pavements Smart Overlay W 26th St to 46th St/47th St | $3,300,000 | Planned | ||
| — | 1-81235-0000 1812350000 | District 1 | Northwest HwyUS-14 | Preservation - Pavements Smart Overlay Hart Rd to Lake-Cook Rd | $2,700,000 | Planned | ||
| — | 1-81236-0000 1812360000 | District 1 | Gregory St | Preservation - Pavements Smart Overlay Western Ave to Burr Oak Ave | $800,000 | Planned | ||
| — | 1-81237-0000 1812370000 | District 1 | I-290 | Preservation - Pavements Smart Overlay Ill 390 (Elgin-O'Hare Tollway) to I-355 Tollway | $6,250,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.