| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-79618-0000 1796180000 | District 1 | Hyde Park Blvd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Woodlawn Ave to Harper Ave | $269,000 | Planned | ||
| — | 1-79624-0000 1796240000 | District 1 | Lehigh Ave | Rehabilitation - Pavement Standard Overlay, ADA Improvements Touhy Ave to Central Ave | $1,030,000 | Planned | ||
| — | 1-79672-0000 1796720000 | District 1 | Lake StUS-20 | Reconstruction - Pavement Interchange (New) At Shales Pkwy | $102,000,000 | Planned | ||
| — | 1-79672-0001 1796720001 | District 1 | Lake StUS-20 | Reconstruction - Bridges Bridge Replacement At Shales Pkwy | $3,000,000 | Planned | ||
| — | 1-79672-0440 1796720440 | District 1 | Lake StUS-20 | Reconstruction - Pavement Utility Adjustment At Shales Pkwy | $15,000,000 | Planned | ||
| — | 1-79695-0000 1796950000 | District 1 | Northwest HwyUS-14 | Miscellaneous Improvement Traf Signal Installation, RR Interconnect At Cuba Rd | $2,300,000 | Planned | ||
| — | 1-79700-0000 1797000000 | District 1 | IL-173Kenosha St | Safety Channelization at Solon Rd & at Lakeview Rd | $1,500,000 | Planned | ||
| — | 1-79707-0000 1797070000 | District 1 | IL-38Roosevelt Rd | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement, Drainage Winfield Rd to County Farm Rd | $12,900,000 | Planned | ||
| — | 1-79707-0010 1797070010 | District 1 | IL-38Roosevelt Rd | Rehabilitation - Pavement Standard Overlay, Drainage Fapp Circle to E of Pierce Ave | $2,500,000 | Planned | ||
| — | 1-79730-0000 1797300000 | District 1 | IL-173Rosecrans Rd | Miscellaneous Improvement Traf Signal Modernization, Channelization At Kilbourne Rd | $1,400,000 | Planned | ||
| — | 1-79733-0000 1797330000 | District 1 | Doty Ave | Miscellaneous Improvement Dredging 110th St to S of Kensington Ave (PS #27) | $2,000,000 | Planned | ||
| — | 1-79735-0000 1797350000 | District 1 | I-55 | Initial Construction - Pa Add Auxiliary Lanes I-355 to Ill 53 (Bolingbrook Dr) | $24,800,000 | Planned | ||
| — | 1-79735-0400 1797350400 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment I-355 to Ill 53 (Bolingbrook Dr) | $2,000,000 | Planned | ||
| — | 1-79743-0000 1797430000 | District 1 | Dixie Hwy | Rehabilitation - Pavement Designed Overlay, New Shoulders, Drainage Sycamore Dr to Harwood Ave | $4,500,000 | Planned | ||
| — | 1-79748-0000 1797480000 | District 1 | I-57 | Reconstruction - Bridges Bridge Replacement At 183rd St (Overhead) | $10,000,000 | Planned | ||
| — | 1-79753-0000 1797530000 | District 1 | I-57 | Rehabilitation - Bridges Bridge New Deck At Flossmoor Rd (Overhead) | $6,940,000 | Planned | ||
| — | 1-79757-0000 1797570000 | District 1 | I-80 | Rehabilitation - Bridges Bridge Widening, Bridge Superstructure Replace At Oak Park Ave (Overhead) | $5,200,000 | Planned | ||
| — | 1-79759-0000 1797590000 | District 1 | I-80 | Reconstruction - Bridges Bridge Replacement At 183rd St (Overhead) | $11,000,000 | Planned | ||
| — | 1-79763-0000 1797630000 | District 1 | I-290 | Reconstruction - Bridges Bridge Replacement At I-355 (Veterans Memorial Tollway) & At Spring Brook | $40,750,000 | Planned | ||
| — | 1-79771-1000 1797711000 | District 1 | Jefferson StUS-30 | Maintenance - Bridges Bridge New Deck, Bridge Repair At Des Plaines River | $25,000,000 | Planned | ||
| — | 1-79796-0000 1797960000 | District 1 | IL-83Kingery Hwy | Reconstruction - Bridges Bridge Replacement At Ill 56 (Butterfield Rd) | $12,875,000 | Planned | ||
| — | 1-79799-0000 1797990000 | District 1 | IL-59Neltnor Blvd | Reconstruction - Bridges Bridge Replacement At UP & CN RR 0.2 mi S of Main St | $9,550,000 | Planned | ||
| — | 1-79800-0000 1798000000 | District 1 | IL-59 | Reconstruction - Bridges Bridge Replacement At RR over Prairie Path | $1,958,000 | Planned | ||
| — | 1-79806-0000 1798060000 | District 1 | Brandon RdCH-42 | Maintenance - Bridges Bridge Repair At Des Plaines River | $5,000,000 | Planned | ||
| — | 1-79809-0000 1798090000 | District 1 | Jackson St | Rehabilitation - Bridges Bridge Superstructure Rehab At Des Plaines River | $25,000,000 | Planned | ||
| — | 1-79811-0000 1798110000 | District 1 | Kedzie Ave | Rehabilitation - Bridges Bridge Painting, Bridge Superstructure Rehab At Cal Sag Channel | $13,220,000 | Planned | ||
| — | 1-79868-0000 1798680000 | District 1 | Western Ave | Rehabilitation - Pavement Standard Overlay, ADA Improvements, RR Flagger McKinley Rd to E Westleigh Rd | $2,800,000 | Planned | ||
| — | 1-79869-0000 1798690000 | District 1 | Northwest HwyUS-14 | Rehabilitation - Pavement Standard Overlay, New Shoulders, Milled Rumble Strip McHenry Co Line to Hart Rd | $1,970,000 | Planned | ||
| — | 1-79876-0000 1798760000 | District 1 | Harlem AveIL-43 | Rehabilitation - Pavement Designed Overlay, Storm Sewer (New), ADA Improvements 47th St to Sanitary & Ship Canal | $4,200,000 | Planned | ||
| — | 1-79880-0000 1798800000 | District 1 | IL-59Sutton Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements, RR Flagger Cook Co Line to S of Heritage Woods Dr | $7,000,000 | Planned | ||
| — | 1-79899-0000 1798990000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Retaining Wall At Ill 43 (Harlem Ave) (Overhead) | $24,493,000 | Planned | ||
| — | 1-79899-0010 1798990010 | District 1 | Harlem AveIL-43 | Preservation - Bridges Bridge Repair, Bridge Widening, Bridge Deck Overlay At CN RR S of I-55 Ramps (EB) | $24,493,000 | Planned | ||
| — | 1-79901-0000 1799010000 | District 1 | Algonquin RdIL-62 | Reconstruction - Bridges Bridge Replacement At Spring Creek 1.4 Mi W of ILL 59 | $5,630,000 | Planned | ||
| — | 1-79905-0000 1799050000 | District 1 | IL-31Lake St | Safety Channelization, Traf Signal Modernization, ADA Improvements At I-88 Ramps | $1,160,000 | Planned | ||
| — | 1-79908-0000 1799080000 | District 1 | Higgins RdIL-72 | Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, ADA Improvements At Huntington Blvd | $1,500,000 | Planned | ||
| — | 1-79925-0000 1799250000 | District 1 | 55th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements East Ave to Joliet Rd | $711,000 | Planned | ||
| — | 1-79944-0000 1799440000 | District 1 | 26th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Des Plaines Ave to 49th Ave | $6,250,000 | Planned | ||
| — | 1-79967-2000 1799672000 | District 1 | Jefferson StUS-52 | Rehabilitation - Bridges Culvert Extension River Rd to Houbolt Rd | $30,400,000 | Planned | ||
| — | 1-79967-2001 1799672001 | District 1 | Jefferson StUS-52 | Initial Construction - Pa Additional Lanes River Rd to Houbolt Rd | $45,600,000 | Planned | ||
| — | 1-79967-2600 1799672600 | District 1 | Jefferson StUS-52 | Initial Construction - Pa Utility Adjustment River Rd to Houbolt Rd | $4,000,000 | Planned | ||
| — | 1-79967-2800 1799672800 | District 1 | Jefferson StUS-52 | Rehabilitation - Bridges Miscellaneous River Rd to Houbolt Rd | $500,000 | Planned | ||
| — | 1-79976-0000 1799760000 | District 1 | Washington Blvd | Reconstruction - Bridges Bridge Replacement Ill 171 (First Ave) to Thatcher Ave | $5,000,000 | Planned | ||
| — | 1-79987-0000 1799870000 | District 1 | Devon Ave | Reconstruction - Bridges Bridge Replacement at Des Plaines River | $3,000,000 | Planned | ||
| — | 1-79992-1000 1799921000 | District 1 | Highland Ave | Maintenance - Bridges Bridge Repair Under Ill 56 | $5,000,000 | Planned | ||
| — | 1-79998-0000 1799980000 | District 1 | Bishop Ford ExpwyI-94 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay W of Martin Luther King Dr to Little Calumet River | $85,000,000 | Planned | ||
| — | 1-80004-0000 1800040000 | District 1 | Ida B Wells Dr | Rehabilitation - Bridges Bridge New Deck, Bridge Superstructure Replace at Old Post Office & at S Branch Chicago River | $23,100,000 | Planned | ||
| — | 1-80009-0000 1800090000 | District 1 | Eisenhower ExpwyI-290 | Reconstruction - Bridges Bridge Replacement at Independence Blvd (Overhead) | $40,000,000 | Planned | ||
| — | 1-80013-0000 1800130000 | District 1 | US-20 | Safety Intersection Reconstn, Traf Signal Replacement at Big Timber Rd | $5,540,000 | Planned | ||
| — | 1-80085-0000 1800850000 | District 1 | Greenwood Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Linneman St to Ill 58 (Golf Rd) | $1,200,000 | Planned | ||
| — | 1-80098-0000 1800980000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 59 (Sutton Rd) to Windsong Dr | $2,300,000 | Planned | ||
| — | 1-80130-0000 1801300000 | District 1 | Batavia AveIL-31 | Maintenance - Pavements Drainage, ADA Improvements S of Fargo Blvd | $500,000 | Planned | ||
| — | 1-80145-0000 1801450000 | District 1 | 115th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Springfield Ave to Western Ave | $3,000,000 | Planned | ||
| — | 1-80146-0000 1801460000 | District 1 | 119th St | Rehabilitation - Pavement Standard Overlay, New Shoulders, Drainage US 45 (LaGrange Rd) to Cal Sag Rd | $2,100,000 | Planned | ||
| — | 1-80183-0000 1801830000 | District 1 | IL-31 | Rehabilitation - Pavement Standard Overlay, ADA Improvements S of Wildrose Spring Rd to S of Third St | $2,500,000 | Planned | ||
| — | 1-80188-0000 1801880000 | District 1 | IL-72Oak Knoll Dr | Rehabilitation - Pavement Designed Overlay, Milled Rumble Strip, New Shoulders DeKalb Co Line to Aurora Dr | $2,500,000 | Planned | ||
| — | 1-80197-0000 1801970000 | District 1 | (eastbound)I-80 | Reconstruction - Bridges Bridge Replacement At I-294 (Tri-State Tollway) (NB) | $52,000,000 | Planned | ||
| — | 1-80237-0000 1802370000 | District 1 | IL-176 | Miscellaneous Improvement Left Turn Lanes At Buhl Rd & At Bay View Beach Rd | $2,500,000 | Planned | ||
| — | 1-80242-0000 1802420000 | District 1 | US-14 | Safety Intersection Reconstn At Hartland Rd / Hughes Rd | $5,000,000 | Planned | ||
| — | 1-80247-0000 1802470000 | District 1 | IL-64North Ave | Safety Channelization, Widening Existing Pavement Renaux Blvd to Bonnie Dr & At Brown Rd | $4,900,000 | Planned | ||
| — | 1-80267-0000 1802670000 | District 1 | IL-176Liberty St | Reconstruction - Bridges Culvert Replacement At Bangs Lake Outlet | $1,000,000 | Planned | ||
| — | 1-80288-0000 1802880000 | District 1 | Palatine Rd | Reconstruction - Bridges Culvert Replacement E of Williams Dr to E of Salt Creek & At Salt Creek 0.2 Mi W of Winston Dr W of Ill 53 | $1,700,000 | Planned | ||
| — | 1-80293-0000 1802930000 | District 1 | I-90I-94Kennedy Expwy | Reconstruction - Bridges Bridge Replacement At Fulton St (Overhead) | $20,000,000 | Planned | ||
| — | 1-80294-0000 1802940000 | District 1 | Forest Way Dr | Reconstruction - Bridges Culvert Replacement At Ditch N of Willow Rd | $1,200,000 | Planned | ||
| — | 1-80319-0000 1803190000 | District 1 | IL-53Independence Blvd | Safety Intersection Improvement At Normantown Rd / Devonwood Ave | $2,545,000 | Planned | ||
| — | 1-80322-0000 1803220000 | District 1 | Oakton St | Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, Pavement Marking At Busse Hwy, Dee Rd & Northwest Hwy | $3,000,000 | Planned | ||
| — | 1-80323-0000 1803230000 | District 1 | Morgan StPark Ave | Miscellaneous Improvement Standard Overlay, Traf Signal Modernization, Pavement Marking 1) Morgan St/Park Ave - 149th St to 167th St, 2) Ill 1 at 144th St | $4,060,000 | Planned | ||
| — | 1-80327-0000 1803270000 | District 1 | Harlem AveIL-43 | Reconstruction - Pavement Bridge Repair 46th/47th St to 53rd St | $8,000,000 | Planned | ||
| — | 1-80344-0000 1803440000 | District 1 | Various | Safety Milled Rumble Strip Various Locations | $210,000 | Planned | ||
| — | 1-80348-0000 1803480000 | District 1 | Ogden Ave | Miscellaneous Improvement Turning Lanes, Channelization, Traf Signal Modernization At Oak Park Ave, East Ave & Ridgeland Ave | $2,210,000 | Planned | ||
| — | 1-80361-0000 1803610000 | District 1 | Belvidere StIL-120 | Reconstruction - Bridges Culvert Replacement, Intersection Improvement at Ditch 0.4 mi W of ILL 131 and At Knight/Ruth Wilcox Ave | $500,000 | Planned | ||
| — | 1-80370-0000 1803700000 | District 1 | Front StIL-53 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, New Shoulders Water Street to Grundy Co Line | $5,500,000 | Planned | ||
| — | 1-80376-0000 1803760000 | District 1 | IL-31 | Safety Intersection Reconstn, Drainage at Ringwood Rd | $4,000,000 | Planned | ||
| — | 1-80439-0000 1804390000 | District 1 | Washington Blvd | Rehabilitation - Pavement Standard Overlay Ill 43 (Harlem Ave) to Austin Blvd | $1,900,000 | Planned | ||
| — | 1-80440-0000 1804400000 | District 1 | Central Ave | Rehabilitation - Pavement Designed Overlay, ADA Improvements 53rd St to 63rd St | $1,012,000 | Planned | ||
| — | 1-80441-0000 1804410000 | District 1 | Dundee Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements I-94 (Edens Expwy) to Forest Way Dr | $800,000 | Planned | ||
| — | 1-80453-0000 1804530000 | District 1 | Touhy Ave | Miscellaneous Improvement Traf Signal Installation, ADA Improvements At Chestnut St | $500,000 | Planned | ||
| — | 1-80552-0000 1805520000 | District 1 | I-57 | Initial Construction - Pa Interchange (New) at Eagle Lake Rd | $150,000,000 | Planned | ||
| — | 1-80552-0400 1805520400 | District 1 | I-57 | Initial Construction - Pa Utility Adjustment at Eagle Lake Rd | $2,000,000 | Planned | ||
| — | 1-80552-0500 1805520500 | District 1 | I-57 | Initial Construction - Pa RR Crossing Construction at Eagle Lake Rd | $2,000,000 | Planned | ||
| — | 1-80553-0000 1805530000 | District 1 | Half Day RdIL-22 | Safety Intersection Improvement, ADA Improvements At ILL 83 | $5,000,000 | Planned | ||
| — | 1-80558-0000 1805580000 | District 1 | Belvidere RdIL-120 | Initial Construction - Pa Additional Lanes Ashford Ln to US 45 | $13,410,000 | Planned | ||
| — | 1-80558-0010 1805580010 | District 1 | Belvidere RdIL-120 | Reconstruction - Pavement Reconstruction, ADA Improvements Ashford Ln to US 45 | $8,940,000 | Planned | ||
| — | 1-80558-0400 1805580400 | District 1 | Belvidere RdIL-120 | Initial Construction - Pa Utility Adjustment Ashford Ln to US 45 | $500,000 | Planned | ||
| — | 1-80567-0000 1805670000 | District 1 | Montrose Ave | Rehabilitation - Pavement Standard Overlay Central Ave to Elston Ave | $2,250,000 | Planned | ||
| — | 1-80578-0000 1805780000 | District 1 | Ridge Blvd | Miscellaneous Improvement Miscellaneous Howard St to S of Pratt Blvd (Pedestrian Improvements) | $2,000,000 | Planned | ||
| — | 1-80590-0000 1805900000 | District 1 | 25th Ave | Reconstruction - Bridges Bridge Replacement at Salt Creek 0.3 Mi S of Cermak Rd | $5,500,000 | Planned | ||
| — | 1-80592-0000 1805920000 | District 1 | Eisenhower ExpwyI-290 | Reconstruction - Bridges Bridge Replacement at Ogden Ave (Overhead) | $17,740,000 | Planned | ||
| — | 1-80592-1000 1805921000 | District 1 | Ogden Ave | Safety Intersection Improvement, Traf Signal Modernization, Traf Signal Installation Over I-290 (Eisenhower Expwy) | $26,301,000 | Planned | ||
| — | 1-80608-0000 1806080000 | District 1 | US-30 | Preservation - Pavements Standard Overlay Harvey Rd to 143rd St | $9,250,000 | Planned | ||
| — | 1-80652-0000 1806520000 | District 1 | E Butterfield Frtg | Rehabilitation - Pavement Designed Overlay DEAD END TO FAIRFIELD AVE | $146,000 | Planned | ||
| — | 1-80791-0000 1807910000 | District 1 | Cicero AveIL-50IL-83 | Reconstruction - Bridges Bridge Replacement At Cal Sag Channel | $20,000,000 | Planned | ||
| — | 1-80798-0000 1807980000 | District 1 | Dixie HwyIL-1 | Safety Intersection Reconstn At County Line Rd | $7,000,000 | Planned | ||
| — | 1-80803-0000 1808030000 | District 1 | Governors HwyIL-50 | Miscellaneous Improvement Traf Signal Installation, Safety Improvements, Pavement Marking Wilmington-Peotone Rd to County Line Rd | $2,500,000 | Planned | ||
| — | 1-80814-0000 1808140000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Western Ave (Overhead) | $30,300,000 | Planned | ||
| — | 1-80818-0000 1808180000 | District 1 | Eisenhower ExpwyI-290IL-110 | Rehabilitation - Bridges Bridge Substructure Rehab, Bridge Superstructure Rehab At Pulaski Rd (Overhead) | $8,930,000 | Planned | ||
| — | 1-80821-0000 1808210000 | District 1 | Eisenhower ExpwyI-290IL-110 | Rehabilitation - Bridges Bridge Substructure Rehab, Bridge Superstructure Rehab At Kostner Ave (Overhead) | $8,610,000 | Planned | ||
| — | 1-80832-0000 1808320000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Circle Ave | $94,000,000 | Planned | ||
| — | 1-80833-0000 1808330000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Des Plaines Ave | $9,300,000 | Planned | ||
| — | 1-80834-0000 1808340000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Des Plaines River | $32,000,000 | Planned | ||
| — | 1-80835-0000 1808350000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Pavement Interchange Reconstruction At Ill 171 (1st Ave) & at 5th Ave | $150,000,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.