IDOT Jobs

Jun 2026 · 7 jobs · — Sign up free
★ My Jobs

Filtered by: County: Will Clear all

7 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 12, 2026 62X28 WillDistrict 1 Concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed join (1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $248,599 ·
Jun 12, 2026 62X37 WillDistrict 1 (4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,580,280 ·
Jun 12, 2026 78C13 WilliamsonDistrict 9 Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. — Executed Nov 25 New Samron Midwest Contracting, Inc. $328,825 ·
Jun 12, 2026 80B17 WillDistrict 1 Thermoplastic pavement markings, and incidental work (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County. — Executed Nov 25 New Iroquois Paving Corporation $197,734 ·
Jun 12, 2026 80B77 WillDistrict 1 The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $1,130,242 ·
Jun 12, 2026 80D36 WillDistrict 1 This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County. — Executed Nov 25 New GRANITE CONSTRUCTION COMPANY $900,000 ·
Jun 12, 2026 99748 WilliamsonDistrict 9 Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. — Rejected Nov 25 New
1–7 of 7

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.