Filtered by: County: Whiteside Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 11, 2022 | 64D78 | WhitesideDistrict 2 | 0.86 Mi along IL 40 - Standard overlay, milling and ADA Improvements from 0.1 Mi N of Lynn Blvd and 0.1 Mi N to 0.1 Mi S of LeFevre Rd; reconstruction and ADA improvements from Lynn Blvd to 0.1 Mi N of LeFevre Rd in Sterling. | — | Executed | Martin & Company Excavating $6,345,198 · | ||
| Mar 11, 2022 | 64R43 | WhitesideDistrict 2 | Deck patching with scarification and polymer concrete wearing surface on SN 098-0051 carrying Avenue "G" over the North branch of the Rock River in Sterling. | — | Executed | Path Construction Company, Inc. $239,261 · | ||
| Apr 29, 2022 | 64J47 | WhitesideDistrict 2 | 0.5 mile, Bridge repair and bridge painting on US 30 over the Mississippi River one mile West of IL 84. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $987,610 · | ||
| Apr 29, 2022 | 85724 | WhitesideDistrict 2 | Cold-in-Place Recycling, resurfacing and aggregate shoulders on Spring Hill Road from Henry Road to the west city limits of Prophetstown, and on Star Road from the east city limits to Yorktown Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,611,487 · | ||
| Jun 17, 2022 | 64N77 | WhitesideDistrict 2 | The removal and replacement of pedestrian (ADA) curb ramps, curb and gutter, and grading and shaping The replacement of non-compliant pedestrian (ADA) curb ramps along IL 136 from 4th Street to 0.1-mile West of IL 84 in Fulton. The proposed improvement generally consists of the removal and replacement of pedestrian (ADA) curb ramps, curb and gutter, and grading and shaping. Update curb ramps, sidewalks, and crosswalks (no changes to roadway). | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $976,105 · | ||
| Jun 17, 2022 | 64P15 | WhitesideDistrict 2 | 2.985 miles - From IandM Feeder Canal 0.3 Mi East of IL 40 in Rock Falls to the Lee County Line - Cold Milling, Pavement Patching, and HMA Resurfacing. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,018,594 · | ||
| Jun 17, 2022 | 64P89 | WhitesideDistrict 2 | Bridge deck sealing on SN 098-6003 carrying US 30 over the Mississippi River 1.0 miles West of IL 84. | — | Executed | M & M Concrete, Inc. $20,971 · | ||
| Jun 17, 2022 | 64P95 | WhitesideDistrict 2 | 0.049 miles (261 ft), intersection improvements at US 30 and Emerson Road intersections. Approved HSIP Location. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $145,965 · | ||
| Jun 17, 2022 | 64R40 | WhitesideDistrict 2 | Full cleaning and painting of structural steel of SN 098-0005 carrying US 30 over UP RR 2.5 miles West of Morrison. | — | Executed | Civil Coatings and Construction Inc. $335,125 · | ||
| Jun 17, 2022 | 85709 | WhitesideDistrict 2 | Reconstruction of Dixon Avenue from IL 40 to Hennepin Feeder Canal Bridge in Rock Falls. | — | Executed | Martin & Company Excavating $2,521,018 · | ||
| Nov 18, 2022 | 64G66 | WhitesideDistrict 2 | 7.5 MI CIP RS and Culvert Replacement, Culvert Extension from the Carroll County Line to US 30. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $7,298,721 · | ||
| Nov 18, 2022 | 64S06 | WhitesideDistrict 2 | Pavement patching from Rock lsland/Whiteside County line to 3.10 mile North East. | — | Executed | G. M. Sipes Construction, Inc. $638,966 · |
1–12 of 12
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.