Filtered by: County: Warren Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 29, 2022 | 68A36 | WarrenDistrict 4 | Resurfacing on US 67 from N of jct US 34 to N of 901h Avenue, North of Roseville, including bridge deck overlays to SN 094-0045 and 094-0046 over S Henderson Creek and SN 094-0035 and 094-0042 over Picayune Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $20,211,670 · | ||
| Apr 29, 2022 | 68G33 | HendersonWarrenDistrict 4 | Chip seal A-1 and fog coat on IL 116 from 950 N near Media to US 67. | — | Executed | DMS Contracting, Inc. $656,824 · | ||
| Jun 17, 2022 | 68G43 | McDonoughWarrenDistrict 4 | Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles. | — | Executed | Freesen, a div of UCM, Inc. $2,042,711 · | ||
| Jun 17, 2022 | 68G93 | WarrenDistrict 4 | 6.22 miles of HMA patching from 20th Street to US 67. | — | Executed | Gunther Construction, a div of UCM, Inc. $435,978 · | ||
| Jun 17, 2022 | 89760 | WarrenDistrict 4 | Replace the bridge carrying CH 4 over Henderson Creek, 5.4 miles southeast of Alexis. | — | Executed | County Contractors, Inc. $2,275,756 · | ||
| Jul 15, 2022 | 68G71 | WarrenDistrict 4 | Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work. | — | Executed | Brandt Construction Co. $1,033,550 · | ||
| Nov 18, 2022 | 68E43 | WarrenDistrict 4 | Replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 This project is located just west of Galesburg and consists of replacing a double steel plate arch culvert with a double 12'x12' precast concrete box culvert carrying US 34 over the South branch of Cedar Creek. | — | Executed | Laverdiere Construction, Inc. $2,344,285 · |
1–7 of 7
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.