| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2020 | 62G27 | McHenryDistrict 1 | 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. | — | Executed | Payne & Dolan, Inc. $1,469,929 · | ||
| Jan 17, 2020 | 62K14 | McHenryDistrict 1 | Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. | — | Executed | Martam Construction Incorporated $1,184,616 · | ||
| Mar 6, 2020 | 62F91 | McHenryDistrict 1 | Overlay Smart, ADA improvements, and milled rumble strips on IL 120 from IL 47 to Martin Rd. | — | Executed | Curran Contracting Company $3,512,337 · | ||
| Apr 24, 2020 | 61G43 | McHenryDistrict 1 | Construction of a multi-use path adjacent to Reed Road from Vine Street to IL 47 in the Village of Huntley. | — | Executed | Martam Construction Incorporated $239,749 · | ||
| Apr 24, 2020 | 62D36 | McHenryDistrict 1 | Project 14,023 LF. Pavement widening, pavement reconstruction, construction of a turnabout, curb and gutter, sidewalk, proposed drainage. replacement of a box culvert with three box culverts and two retaining walls. | — | Executed | Curran Contracting Company $9,727,727 · | ||
| Apr 24, 2020 | 62K57 | McHenryDistrict 1 | Light tower and foundation removal, install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at US 14 at IL 31 in Crystal Lake. | — | Executed | Hecker and Company, Inc. $679,721 · | ||
| Jun 12, 2020 | 61G63 | McHenryDistrict 1 | Sidewalk and pedestrian crossing improvements on West Main Street from Cary-Algonquin Road to Wulff street in Cary | — | Executed | A Lamp Concrete Contractors, Inc. $162,319 · | ||
| Jul 31, 2020 | 46552 | McHenryDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $308,371 · | ||
| Sep 18, 2020 | 62M66 | McHenryDistrict 1 | Building Demolition at 3 locations. Location No. 1: 2103 N. Woodlawn Parkway; Location No. 2 2107 N. Woodlawn Parkway; Locaton No. 3 W. side of IL 31, approximately 2,250-ft N. of McCullom Lake. | — | Executed | MYS, Incorporated $360,168 · | ||
| Nov 6, 2020 | 61G72 | McHenryDistrict 1 | Sidewalk improvements including ADA ramp installation along Chapel Hill Road from Reed Avenue to Fairview Avenue in Johnsburg. | — | Executed | A Lamp Concrete Contractors, Inc. $149,541 · | ||
| Nov 6, 2020 | 62A80 | McHenryDistrict 1 | (0.45 miles) the type of work is Bridge Replacement in McHenry County, over Kishwaukee River: SN 056-0025. | — | Executed | Plote Construction, Inc. $7,441,279 · | ||
| Nov 6, 2020 | 62J35 | McHenryDistrict 1 | Bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary (0.09-Mile) Improvement of US 14 over Fox River consists of bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary. | — | Executed | Martam Construction Incorporated $813,564 · | ||
| Nov 6, 2020 | 62N02 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Active | Illinois Central Sweeping LLC $495,000 · |
1–13 of 13
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.