Filtered by: County: Lake Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 61J82 | LakeDistrict 1 | Sidewalk reconstruction and traffic signal modifications at the intersection of Central Avenue and Hickory Street in Highland Park. | — | Executed | Alliance Contractors, Inc. $318,100 · | ||
| Jan 19, 2024 | 61K05 | LakeDistrict 1 | HMA resurfacing, widening, storm sewers, drainage structures, PCC sidewalks, HMA multi-use patch, and traffic signal improvements at the intersection of Wadsworth Road and Lewis Avenue in Waukegan and Beach Park. | — | Executed | Campanella and Sons, Inc. $4,199,910 · | ||
| Jan 19, 2024 | 62U69 | LakeDistrict 1 | Arterial routes sweeping in Lake County This contract consists of arterial routes sweeping in Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $2,640,000 · | ||
| Mar 8, 2024 | 61J99 | LakeDistrict 1 | Replace the bridge carrying Oak Spring Road over the Des Plaines River, 0.80 mile east of IL 21. | — | Executed | Dunnet Bay Construction Company $4,739,292 · | ||
| Mar 8, 2024 | 61K10 | LakeDistrict 1 | Full depth pavement reclamation, aggregate subgrade, HMA Pavement, curb, gutter and sidewalk replacement, and storm sewer on Fish Lake Road from north IL 120 to Nippersink Road in Volo. | — | Executed | Lenny Hoffman Excavating, Inc. $2,819,811 · | ||
| Mar 8, 2024 | 62R92 | LakeDistrict 1 | (1100 -Ft) (SN 049-0171) Bridge deck scarification and overlay, partial and full depth bridge deck, approach slab repair, expansion joint replacement, structural steel repair, and abutment bearing replacement, located over Metra Railroad and Rollins Rd in the Village of Fox Lake and Grant Township in Lake Co. | — | Executed | Martam Construction Incorporated $1,183,142 · | ||
| Mar 8, 2024 | 62T26 | LakeDistrict 1 | (3.51-Mile) Crack and Joint Sealing project along IL 132 (Grand Avenue) from 0.2-miles East of Hunt Club Road to Ferndale Street in the Village of Gurnee, Lake County. | — | Executed | SKC Construction, Inc. $242,111 · | ||
| Mar 8, 2024 | 62T59 | LakeMcHenryDistrict 1 | Hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and repl (6.1-Mile) SMART Overlay, ADA improvements: The work consists of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and replacement for curb ramps (ADA) improvements, pavement markings, raised reflective pavement markers and detector loops. The project is located on US 12/ IL 59 (Rand Rd) from State Park Road/ East Street to North of IL 120, within the Villages of Spring Grove, Fox Lake and Volo in Lake and McHenry Counties. | — | Executed | Builders Paving, LLC $6,630,000 · | ||
| Mar 8, 2024 | 62U98 | CookLakeDistrict 1 | Debris and litter cleaning along I-94/US-41 (Edens Expwy) from I-90 (Kennedy Expwy) to Clavey Rd This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expwy) from I-90 (Kennedy Expwy) to Clavey Rd. The project length is 200 miles. | — | Executed | William Dunbar Construction LLC. $117,482 · | ||
| Mar 8, 2024 | 62W53 | LakeDistrict 1 | 2,863-ft (0.54-miles). Intersection improvement of US 41 at Stearns School Road widening, addition of turning lanes, resurfacing, traffic signal modernization. Project includes improvements on Stearns School Road from Notting Hill Road to US 41 located in the Village of Gurnee and unincorporated Warren Township. | — | Executed | Campanella and Sons, Inc. $4,399,898 · | ||
| Apr 26, 2024 | 61K34 | LakeDistrict 1 | Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst. | — | Executed | Lenny Hoffman Excavating, Inc. $5,300,754 · | ||
| Apr 26, 2024 | 62M25 | LakeMcHenryDistrict 1 | (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties. | — | Executed | Payne & Dolan, Inc. $7,564,874 · | ||
| Apr 26, 2024 | 62T69 | LakeDistrict 1 | (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County. | — | Executed | Peter Baker & Son Co. $1,732,377 · | ||
| Jun 14, 2024 | 46648 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of of the work is on various State-maintained highways in Lake and Will Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,812,600 · | ||
| Jun 14, 2024 | 62R84 | CookLakeDistrict 1 | Installation of new fiber optic cable, conduit, PTZ cameras, network switches along six different corridors located in Cook and Lake Counties located primarily within Village of Skokie, Elmwood Park, North Chicago, and Lincolnwood. | — | Executed | H & H Electric Co. $1,113,578 · | ||
| Jun 14, 2024 | 62U77 | LakeDistrict 1 | ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete cu (0.35-Mile) Designed Overlay consists of ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, asphalt leveling binder and surface course, pavement markings, raised reflective pavement marker installation. Located on IL 176 (Park Avenue) from Garfield Rd to Park Pl, within the Village of Libertyville in Lake County. | — | Executed | Peter Baker & Son Co. $649,700 · | ||
| Aug 2, 2024 | 61K49 | LakeDistrict 1 | Resurfacing Indian Creek Road from Gilmer Road to the east village limits of Hawthorne Woods | — | Executed | Peter Baker & Son Co. $369,519 · | ||
| Aug 2, 2024 | 61K51 | LakeDistrict 1 | HMA Resurfacing, curb and gutter, sidewalks, drainage adjustments, and parkway restoration on North Avenue from Glen Flora Avenue to Julian Street in Waukegan | — | Executed | Peter Baker & Son Co. $957,987 · | ||
| Aug 2, 2024 | 61K52 | LakeDistrict 1 | Construction of a Open-spandrel arch ridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. | — | Rejected | Dunnet Bay Construction Company $4,297,627 · | ||
| Sep 20, 2024 | 62P38 | LakeDistrict 1 | Curb ramps (ADA) improvements on Various Routes at Various locations within the Villages of Mundelein, Liberty This project consists of curb ramps (ADA) improvements on Various Routes at Various locations within the Villages of Mundelein, Libertyville and Vernon Hills in Central Lake County. | — | Executed | Alliance Contractors, Inc. $1,061,609 · | ||
| Sep 20, 2024 | 62P40 | LakeDistrict 1 | This is an ADA curb ramp installation project. This project is located along various State routes in the Villages of Barrington, Beach Park, Lake Zurich and Winthrop Harbor and the Cities of North Chicago, Park City and Waukegan in Lake County. | — | Executed | Alliance Contractors, Inc. $888,213 · | ||
| Sep 20, 2024 | 62V17 | CookLakeDistrict 1 | Project covers 14 miles along I-94 from Montrose Ave to Lake Cook Rd and 3 mile along US Route 41 from Lake Cook Rd to Park Ave. Improvements are within 8 separate cities and villages within Cook and Lake counties from Chicago to Highland Park. Project involves replacing the surveillance vehicle detection system, ramp metering system, 6 sign structures and installing wrong way detection system. Connection to fiberoptic system and network integration is also included. | — | Executed | Meade Inc. $9,281,773 · | ||
| Nov 8, 2024 | 61J87 | LakeDistrict 1 | Construction of a grade separation structure to carry the CN/WCL Railroad over US 14; Pavement reconstruction of US 14, construction of a pump station, relocation of the Flint Creek Tributary, box culvert construction, retaining and noise walls, watermain, sanitary sewer, traffic signals and roadway lighting between IL 59 and Valencia Avenue in Barrington. | — | Executed | IHC Construction Companies LLC and Curran Contracting Company JV $69,424,887 · | ||
| Nov 8, 2024 | 61K74 | LakeDistrict 1 | HMA reconstruction of Hazel Avenue from Wilmot Road to Waukegan Road in Deerfield. Includes curb and gutter, PCC Sidewalk, ADA improvements, bridge deck sealing and landscaping. | — | Executed | A Lamp Concrete Contractors, Inc. $10,184,632 · | ||
| Nov 8, 2024 | 62B66 | LakeDistrict 1 | Decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), an The project consists of decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), and construction of the new pump station in the northeast quadrant of the US 41 and IL 176 intersection with a new outfall pipe to the Skokie River. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $15,494,185 · |
1–25 of 25
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.