Filtered by: County: Kankakee Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 66P07 | GrundyKankakeeDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties. | — | Executed | The Final Connection, Inc. $105,464 · | ||
| Mar 8, 2024 | 66P20 | KankakeeDistrict 3 | This project is located in a Kankakee county. The intent of the project to repair and maintain Traffic signal, Flashing beacons and Roadway lighting. | — | Rejected | Outsen Electric, Incorporated $152,655 · | ||
| Apr 26, 2024 | 66M98 | IroquoisKankakeeDistrict 3 | Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. | — | Executed | Iroquois Paving Corporation $2,586,271 · | ||
| Apr 26, 2024 | 66N96 | KankakeeDistrict 3 | SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap. | — | Executed | Tobey's Construction & Cartage, Inc. $33,295 · | ||
| Apr 26, 2024 | 87829 | KankakeeDistrict 3 | Resurfacing CH 3 from the Iroquois County line to CH 37. | — | Executed | Kankakee Valley Construction Company, Inc. $323,707 · | ||
| Jun 14, 2024 | 66L10 | KankakeeDistrict 3 | This project is located on FAP 41 (IL 17) 0.7 mile east of Union Hill Road, consisting of replacing SN 046-0031 with SN 046-0162, carrying FAP 41 (IL 17) over Horse Creek. | — | Executed | Tobey's Construction & Cartage, Inc. $1,975,085 · | ||
| Jun 14, 2024 | 66N52 | KankakeeDistrict 3 | Bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concret This project consists of bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concrete, drain cleaning, traffic control, pavement striping; on F.A.P. Route 332 (IL 1/17) at two structures, Structure No. 046-0023 and Structure No. 046-0111 carrying IL 1/17 over the Kankakee River in Momence. | — | Executed | Tobey's Construction & Cartage, Inc. $850,262 · | ||
| Jun 14, 2024 | 87835 | KankakeeDistrict 3 | Construct a three-span PPC deck beam bridge with HMA approaches and guardrail to carry CH 17 over Exline Slough, 5.9 miles northeast of Manteno. | — | Executed | Tobey's Construction & Cartage, Inc. $910,990 · |
1–8 of 8
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.