Filtered by: County: Kane Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 62U68 | KaneMcHenryDistrict 1 | Arterial routes sweeping in McHenry and Kane counties This contract consists of arterial routes sweeping in McHenry and Kane counties | — | Rejected | Central Sweeping of Illinois, LLC $1,476,500 · | ||
| Mar 8, 2024 | 61H42 | KaneDistrict 1 | Full Depth Resurfacing with curb and gutter, HMA bike path, ADA improvements, and Drainage improvements on Kautz Road from north of Lowgest Drive to Swenson Drive in Geneva and St. Charles. | — | Executed | Plote Construction, Inc. $6,091,120 · | ||
| Mar 8, 2024 | 61J58 | KaneDistrict 1 | Resurfacing Hankes Road from Deerpath Road to Galena Boulevard, and Galena Boulevard from Hankes Road to Orchard Road in Aurora. | — | Executed | Builders Paving, LLC $767,888 · | ||
| Mar 8, 2024 | 61J65 | KaneDistrict 1 | Reconstruction of South McLean Boulevard to a full-curbed cross section with addtional lanes, landscaped median and turn lanes, from Stearns Road to Spring Street in South Elgin. | — | Executed | Plote Construction, Inc. $12,767,711 · | ||
| Mar 8, 2024 | 61K23 | KaneDistrict 1 | Resurfacing Church Road from Indian Trail Road to Sheffer Road, and Sheffer Road from Church Road to Ohio Street in Aurora. | — | Executed | Geneva Construction Company $496,166 · | ||
| Mar 8, 2024 | 61K25 | KaneDistrict 1 | HMA resurfacing with pavement patching, recessed pavement markings, sidewalks, curb and gutter, and landscaping on Illinois Avenue from Highland Avenue to the bridge over the Fox River in Aurora. | — | Executed | Builders Paving, LLC $829,828 · | ||
| Mar 8, 2024 | 61K27 | KaneDistrict 1 | Sidewalk Construction on Calkins Drive from McCannon Street to Grove Street, West Street from Calkins Drive to Maple Street, and Grove Street from Snow St. to Maple Street in Sugar Grove. | — | Executed | Triggi Construction, Inc. $212,336 · | ||
| Mar 8, 2024 | 62T77 | KaneDistrict 1 | (1.45-Mile) Smart Overlay and ADA improvement; Location: FAP 341 IL72 from US 20/IL 47 to Reinking Rd in the Village of Pingree Grove and Rutland Township in Kane County. | — | Executed | Peter Baker & Son Co. $491,941 · | ||
| Mar 8, 2024 | 62V25 | KaneDistrict 1 | Asphalt surface removal and replacement, pavement markings This improvement is on various State maintained routes within the Villages of Lily Lake and Virgil and the City of Elgin in Kane County. This is an intermittent spot resurfacing improvement consists of asphalt surface removal and replacement, pavement markings. | — | Executed | Curran Contracting Company $499,630 · | ||
| Apr 26, 2024 | 61K15 | KaneDistrict 1 | Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove. | — | Executed | D. Construction, Inc. $571,413 · | ||
| Apr 26, 2024 | 61K39 | KaneDistrict 1 | Resurface Baseline Road from US 30 to IL 31 in Montgomery. | — | Executed | Geneva Construction Company $431,447 · | ||
| Apr 26, 2024 | 62T45 | KaneDistrict 1 | This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County. | — | Executed | Lorig Construction Company $256,821 · | ||
| Apr 26, 2024 | 62U84 | KaneDistrict 1 | (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County. | — | Executed | Martam Construction Incorporated $2,186,382 · | ||
| Jun 14, 2024 | 61J28 | KaneDistrict 1 | Reconstruction of the existing intersection of us 20 and Reinking road in the c ty of Elgin to a three-leg roundabout. Work includes pavement removal, storm se sewers, watermains, pcc roadway pavement, curb and gutter, sidewalks, lighting, landscaping, pavement markings and other necessary work. | — | Executed | Plote Construction, Inc. $3,364,000 · | ||
| Jun 14, 2024 | 61K38 | KaneDistrict 1 | Resurface Main Street from Cross Street to 630' north of IL 47 in Sugar Grove. | — | Executed | D. Construction, Inc. $446,051 · | ||
| Jun 14, 2024 | 62U83 | CookKaneDistrict 1 | 6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties. | — | Executed | Dunnet Bay Construction Company $27,446,572 · | ||
| Aug 2, 2024 | 62R97 | KaneMcHenryDistrict 1 | Location 1: 7,089 Feet (1.34 Miles), SMART Overlay, Designed Overlay and ADA Improvements and is located on US 14 from 0.4 Mile SE of Cary/Algonquin Rd to SE of Spring Beach Way within the Village of Cary in McHenry County. Location 2: 1,148.44 Feet (0.22 Miles). Shoulder and Drainage repairs and is located on IL 31 north of Main St in within the Village of Carpentersville in Kane County. | — | Executed | Peter Baker & Son Co. $2,080,376 · | ||
| Aug 2, 2024 | 62T86 | KaneDistrict 1 | (0.55-Mile) SMART Overlay project consisting of hot-mix asphalt surface removal pavement patching, grading and shaping shoulders, hot-mix asphalt surface, detector loop replacement, and thermoplastic pavement marking on Hill Avenue from Montgomery Road to the Kendall County Line within the City of Aurora, in Kane County. | — | Executed | D. Construction, Inc. $274,271 · | ||
| Nov 8, 2024 | 61K64 | KaneDistrict 1 | HMA resurfacing, concrete curb and gutter, storm sewer, and erosion control on Indian Trail from Highland Avenue to IL 31 in Aurora. | — | Executed | Geneva Construction Company $1,369,171 · | ||
| Nov 8, 2024 | 61K66 | KaneDistrict 1 | Resurface Ashland Avenue from IL 25 to Union Street in Aurora. | — | Executed | Geneva Construction Company $1,157,514 · | ||
| Nov 8, 2024 | 61K67 | KaneDistrict 1 | Resurface Prairie Street from the west city limits to Randall Road in Aurora. | — | Rejected | Builders Paving, LLC $1,538,538 · | ||
| Nov 8, 2024 | 61K73 | KaneDistrict 1 | HMA resurfacing, patching, pavement markings, sidewalks, ADA improvements, at various locations in Elgin. | — | Rejected | |||
| Nov 8, 2024 | 62W05 | KaneDistrict 1 | This is a maintenance yard improvement project for the IDOT Sign Shop Yard. The project includes pavement removal, placement of subbase material, HMA HMA binder course, HMA surface course, portland cement concrete, thermoplastic pavement markings, drainage structure repairs, and other incidental. The project is located at 595 S. Street, Elgin in Kane County. | — | Executed | A Lamp Concrete Contractors, Inc. $584,932 · | ||
| Nov 8, 2024 | 62X08 | KaneDistrict 1 | Demolition and removal of two single-family residences, and site clean-up at a commercial property. All three locations are in Sugar Grove. | — | Executed | Veterans Vac Services LLC $245,431 · | ||
| Nov 8, 2024 | 62X13 | KaneDistrict 1 | (214-Ft) Retaining wall repair. Work includes replacement of cast-in-place segment, replacement of curb and gutter, sidewalk, adjustment of drainage parkway/ landscaped areas restoration. Located on IL 25, North of IL 64 (at 404 North 5th Avenue) within the City of St. Charles, in Kane County. | — | Executed | Areatha Construction Co., Inc. $675,550 · |
1–25 of 25
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.