IDOT Jobs

2021 · 12 jobs · — Sign up free
★ My Jobs

Filtered by: County: Kane Clear all

12 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 15, 2021 61G83 KaneDistrict 1 Reconstruction of Bolz Road from Amarillo Drive to Kennedy Drive in the Village of Carpentersville. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,569,268 ·
Jan 15, 2021 62L48 KaneDistrict 1 Crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restripin (1.937-Mile) Improvement consists of crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restriping pavement marking in Villages of East and West Dundee, Dundee Township. — Executed Nov 26 New Freehill Asphalt, Inc. $121,357 ·
Mar 5, 2021 61G90 KaneDistrict 1 Pavement widening, markings and signing to acommodate on-street bicycle lanes on various routes within Aurora. — Executed Nov 26 New D. Construction, Inc. $284,012 ·
Mar 5, 2021 62N10 KaneDistrict 1 A culvert repair of the structure (SN 045-0299) carrying IL Route 47 over Pingree Creek in Plato Township This improvement consists of a culvert repair of the structure (SN 045-0299) carrying IL Route 47 over Pingree Creek in Plato Township. — Executed Nov 26 New Alliance Contractors, Inc. $119,528 ·
Apr 23, 2021 61G58 KaneDistrict 1 Roadway reconstruction, lighting, water main, landscaping, pavement markings, on East New York Street from Farnsworth Avenue to Welsh Drive in Aurora. — Executed Nov 26 New Martam Construction Incorporated $7,777,000 ·
Apr 23, 2021 61G91 KaneDistrict 1 Traffic Signal modernization at three intersections, sidewalk improvements, and pavement markings at Fabyan Parkway and IL 131, Orchard Road at Acutt Road and Rochester Drive, and Orchard Road from US 30 to Jericho Road in Batavia, Montgomery and unincorporated Kane County. — Executed Nov 26 New H & H Electric Co. $645,740 ·
Jun 11, 2021 61H10 KaneDistrict 1 Resuface Sleepy Hollow Road from 0.3 mile south of Crane Dr. to IL 72 in Sleepy Hollow. — Executed Nov 26 New Plote Construction, Inc. $363,000 ·
Jun 11, 2021 62M73 KaneDistrict 1 Culvert repairs for the structure earring on IL 38 MiII Creek in the Village of Campton Hills, Kane County, IL The improvement consists of culvert repairs for the structure earring on IL 38 MiII Creek in the Village of Campton Hills, Kane County, IL. Gross length is 388 FT (0.073 Miles), Net length is 37.5 FT (0.007 Miles). — Executed Nov 26 New MYS, Incorporated $196,778 ·
Jul 30, 2021 62G11 KaneDistrict 1 Intersection reconstruction, new traffic signals, consolidating three drainage structures into two box culvert (1,719 Ft.) The project consists of intersection reconstruction, new traffic signals, consolidating three drainage structures into two box culverts under State Street and IL 72, pedestrian and bicyclist accommodations, lighting improvements, ADA ramps, watermain and sanitary sewer improvements. Location: (IL 72) at State Street / Getzelman Road. — Executed Nov 26 New Pir Tano Construction Company, Inc. $3,881,417 ·
Sep 17, 2021 61H17 KaneDistrict 1 Reconstruct the existing Illinois Prairie Path from Indian Trial Road to the DuPage County line in Aurora. — Executed Nov 26 New Martam Construction Incorporated $894,048 ·
Nov 5, 2021 62N52 CookKaneDistrict 1 (2.63-Mile) Standard overlay and ADA improvement project on IL 19 (Irving Park Road) from IL 25 to IL 59 in Cook and Kane Counties. — Executed Nov 26 New Arrow Road Construction Co. $2,384,740 ·
Nov 5, 2021 62N55 KaneDistrict 1 (1.64-mile) Standard Overlay, Milled Rumble Strip and ADA improvements project, consisting of HMA removal, pavement patching, HMA resurfacing, curb ramps (ADA) improvements, pavement markings install. Located on IL 25 from Hazel Avenue to the Kendall County Line in the City of Aurora and the Village of Montgomery. — Executed Nov 26 New Geneva Construction Company $1,031,471 ·
1–12 of 12

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.