| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61K43 | McHenryDistrict 1 | HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace and shelter construction, and landscaping at the downtown Cary Gateway Plaza in Cary. | — | Executed | Sjostrom & Sons, Inc. $1,190,661 · | ||
| Jan 17, 2025 | 61K92 | McHenryDistrict 1 | Construct a single-cell, three-sided precast structure to carry Hunter Road over Little Beaver Creek west of Harvard. Work includes HMA paving, shoulder construction, and landscaping. | — | Executed | Dunnet Bay Construction Company $2,789,285 · | ||
| Jan 17, 2025 | 61K97 | McHenryDistrict 1 | HMA resurfcing, curb and gutter, sidewalks, drainage improvements, and parkway restoration on First Street from US 14 to Three Oaks Road in Cary. | — | Rejected | |||
| Jan 17, 2025 | 61L00 | McHenryDistrict 1 | HMA resurfacing and aggregate shoulders on Wonder Lake Road, from Thompson Road to White Oaks Road in Wonder Lake. | — | Executed | Curran Contracting Company $619,752 · | ||
| Jan 17, 2025 | 62R95 | McHenryDistrict 1 | (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $2,149,178 · | ||
| Jan 17, 2025 | 62X54 | McHenryDistrict 1 | Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. | — | Executed | Veterans Vac Services LLC $199,014 · | ||
| Jan 17, 2025 | 64T40 | HenryRock IslandDistrict 2 | Bridge washing of 5 structures over the Rock River in various Counties. | — | Executed | Pressure Washing Unlimited Inc. $54,465 · | ||
| Jan 17, 2025 | 64T90 | HenryDistrict 2 | Full bridge cleaning and painting at SN 037-0140, carrying Osco Rd over Mineral Creek, 2 miles east of I-74. | — | Executed | Eagle Painting & Maintenance Company, Inc. $124,250 · | ||
| Jan 17, 2025 | 64T95 | HenryDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | M & M Concrete, Inc. $39,992 · | ||
| Mar 7, 2025 | 62R96 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. | — | Executed | Peter Baker & Son Co. $1,270,720 · | ||
| Mar 7, 2025 | 62T83 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. | — | Executed | Peter Baker & Son Co. $622,485 · | ||
| Mar 7, 2025 | 62X36 | McHenryDistrict 1 | This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. | — | Executed | Payne & Dolan, Inc. $348,412 · | ||
| Mar 7, 2025 | 64T20 | HenryDistrict 2 | Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280. | — | Executed | Martin & Company Excavating $263,536 · | ||
| Mar 7, 2025 | 64U29 | HenryDistrict 2 | Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles. | — | Executed | Advanced Asphalt Company $2,998,150 · | ||
| Apr 25, 2025 | 61L18 | McHenryDistrict 1 | HMA roadway reconstruction and construction of a shared-use path from Washington Street to IL 176 on Prospect Street and on IL 176 from Prospect Street east for 600 feet, in the city of Marengo. Includes; storm sewer and parkway restoration. | — | Executed | PirTano Construction Co., LLC $3,549,900 · | ||
| Apr 25, 2025 | 62V53 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shou (2,646-Ft) Standard Overlay consists of pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shoulder and centerline rumble strips, placement of thermoplastic pavement markings on US 20 (Grant Highway) from 0.2 Miles Southeast of Harmony Road to Getty Road in Coral Township. | — | Executed | Schroeder Asphalt Services, Inc. $293,954 · | ||
| Apr 25, 2025 | 62X48 | McHenryDistrict 1 | (1.24- Mile) Pavement Grinding project including pavement grooving, remove and replace curb and gutter, pavement markings, concrete class B patching. IL 31 (Western Algonquin Bypass) at South Main Street to North Main Street in the Village of Algonquin within McHenry County. | — | Executed | Diamond Coring Company, Inc. $566,692 · | ||
| Apr 25, 2025 | 62X94 | McHenryDistrict 1 | (2.25-Mile) Roadway Reconstruction including construction of three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Ave., water main, sanitary and storm sewer replacement, lighting, signing, retaining walls, ADA improvements and a building demolition from US 14 to IL 120 in the City of Woodstock and Woodstock Fire Rescue District within McHenry County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $78,336,172 · | ||
| Apr 25, 2025 | 64N76 | HenryDistrict 2 | Intersection reconstruction including culvert replacement on US 6 and Green Riv River Rd/Osco Rd 0.3 mi W to 0.5 mi E of Osco Rd. 1,500 gross feet. | — | Executed | Phoenix Corporation of the Quad Cities $2,705,618 · | ||
| Apr 25, 2025 | 64U32 | HenryDistrict 2 | 2.34 miles of HMA milling and resurfacing on US 6 from IL 78 in Annawan to 0.3 miles west of Bureau County Line. | — | Executed | Advanced Asphalt Company $1,442,827 · | ||
| Jun 13, 2025 | 61L49 | McHenryDistrict 1 | Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments. | — | Executed | Alliance Contractors, Inc. $1,194,482 · | ||
| Jun 13, 2025 | 61L50 | McHenryDistrict 1 | HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders. | — | Executed | Geske and Sons, Inc. $1,758,088 · | ||
| Jun 13, 2025 | 61L51 | McHenryDistrict 1 | Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove. | — | Executed | Geske and Sons, Inc. $588,609 · | ||
| Jun 13, 2025 | 62L61 | McHenryDistrict 1 | (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock. | — | Executed | Curran Contracting Company $2,693,463 · | ||
| Jun 13, 2025 | 62V52 | McHenryDistrict 1 | (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake. | — | Executed | Curran Contracting Company $2,389,468 · | ||
| Jun 13, 2025 | 62V57 | McHenryDistrict 1 | (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake. | — | Executed | Curran Contracting Company $2,685,966 · | ||
| Jun 13, 2025 | 62X35 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface cours (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County. | — | Executed | Plote Construction, Inc. $2,341,185 · | ||
| Jun 13, 2025 | 62X66 | McHenryDistrict 1 | Pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County. | — | Executed | Plote Construction, Inc. $1,405,173 · | ||
| Jun 13, 2025 | 62X68 | McHenryDistrict 1 | (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County. | — | Executed | Schroeder Asphalt Services, Inc. $881,875 · | ||
| Jun 13, 2025 | 64T32 | HenryDistrict 2 | 1.82 miles of crack joint sealing on IL 81 from Galva-Atkinson Rd to WestSt in Kewanee and from US 150 to 0.4 miles west of I-74. | — | Executed | Denler, Inc. $160,257 · | ||
| Jun 13, 2025 | 68510 | HenryDistrict 4 | Bridge replacement: SN's 037-0019, 037-0049, 037-0020, and 037-0053 carrying Interstate 74 over IL Route 17 west of Woodhull. | — | Rejected | IHC Construction Companies, L.L.C. $15,796,785 · | ||
| Sep 19, 2025 | 62T23 | McHenryDistrict 1 | Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. | — | Executed | Clean Cut Tree Service, Inc. $257,146 · | ||
| Sep 19, 2025 | 64P76 | HenryDistrict 2 | 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). | — | Executed | Advanced Asphalt Company $2,339,070 · | ||
| Nov 7, 2025 | 61L88 | McHenryDistrict 1 | Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. | — | Executed | Dunnet Bay Construction Company $5,134,451 · | ||
| Nov 7, 2025 | 64U80 | HenryDistrict 2 | 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps. | — | Executed | Advanced Asphalt Company $342,730 · | ||
| Nov 7, 2025 | 64U82 | HenryDistrict 2 | 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson. | — | Executed | Advanced Asphalt Company $529,895 · | ||
| Nov 7, 2025 | 64U87 | HenryDistrict 2 | 16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line. | — | Executed | Phoenix Corporation of the Quad Cities $355,924 · | ||
| Nov 7, 2025 | 85783 | HenryDistrict 2 | Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding. | — | Executed | Advanced Asphalt Company $535,939 · |
1–38 of 38
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.