Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 61K43 McHenryDistrict 1 HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace and shelter construction, and landscaping at the downtown Cary Gateway Plaza in Cary. — Executed Nov 25 New Sjostrom & Sons, Inc. $1,190,661 ·
Jan 17, 2025 61K92 McHenryDistrict 1 Construct a single-cell, three-sided precast structure to carry Hunter Road over Little Beaver Creek west of Harvard. Work includes HMA paving, shoulder construction, and landscaping. — Executed Nov 25 New Dunnet Bay Construction Company $2,789,285 ·
Jan 17, 2025 61K97 McHenryDistrict 1 HMA resurfcing, curb and gutter, sidewalks, drainage improvements, and parkway restoration on First Street from US 14 to Three Oaks Road in Cary. — Rejected Nov 25 New
Jan 17, 2025 61L00 McHenryDistrict 1 HMA resurfacing and aggregate shoulders on Wonder Lake Road, from Thompson Road to White Oaks Road in Wonder Lake. — Executed Nov 25 New Curran Contracting Company $619,752 ·
Jan 17, 2025 62R95 McHenryDistrict 1 (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County. — Executed Nov 25 New Peter Baker & Son Co. $2,149,178 ·
Jan 17, 2025 62X54 McHenryDistrict 1 Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. — Executed Nov 25 New Veterans Vac Services LLC $199,014 ·
Jan 17, 2025 64T40 HenryRock IslandDistrict 2 Bridge washing of 5 structures over the Rock River in various Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $54,465 ·
Jan 17, 2025 64T90 HenryDistrict 2 Full bridge cleaning and painting at SN 037-0140, carrying Osco Rd over Mineral Creek, 2 miles east of I-74. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $124,250 ·
Jan 17, 2025 64T95 HenryDistrict 2 Concrete sealer applied to bridge decks at various locations within District 2. — Executed Nov 25 New M & M Concrete, Inc. $39,992 ·
Mar 7, 2025 62R96 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. — Executed Nov 25 New Peter Baker & Son Co. $1,270,720 ·
Mar 7, 2025 62T83 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. — Executed Nov 25 New Peter Baker & Son Co. $622,485 ·
Mar 7, 2025 62X36 McHenryDistrict 1 This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. — Executed Nov 25 New Payne & Dolan, Inc. $348,412 ·
Mar 7, 2025 64T20 HenryDistrict 2 Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280. — Executed Nov 25 New Martin & Company Excavating $263,536 ·
Mar 7, 2025 64U29 HenryDistrict 2 Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles. — Executed Nov 25 New Advanced Asphalt Company $2,998,150 ·
Apr 25, 2025 61L18 McHenryDistrict 1 HMA roadway reconstruction and construction of a shared-use path from Washington Street to IL 176 on Prospect Street and on IL 176 from Prospect Street east for 600 feet, in the city of Marengo. Includes; storm sewer and parkway restoration. — Executed Nov 25 New PirTano Construction Co., LLC $3,549,900 ·
Apr 25, 2025 62V53 McHenryDistrict 1 Pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shou (2,646-Ft) Standard Overlay consists of pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shoulder and centerline rumble strips, placement of thermoplastic pavement markings on US 20 (Grant Highway) from 0.2 Miles Southeast of Harmony Road to Getty Road in Coral Township. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $293,954 ·
Apr 25, 2025 62X48 McHenryDistrict 1 (1.24- Mile) Pavement Grinding project including pavement grooving, remove and replace curb and gutter, pavement markings, concrete class B patching. IL 31 (Western Algonquin Bypass) at South Main Street to North Main Street in the Village of Algonquin within McHenry County. — Executed Nov 25 New Diamond Coring Company, Inc. $566,692 ·
Apr 25, 2025 62X94 McHenryDistrict 1 (2.25-Mile) Roadway Reconstruction including construction of three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Ave., water main, sanitary and storm sewer replacement, lighting, signing, retaining walls, ADA improvements and a building demolition from US 14 to IL 120 in the City of Woodstock and Woodstock Fire Rescue District within McHenry County. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $78,336,172 ·
Apr 25, 2025 64N76 HenryDistrict 2 Intersection reconstruction including culvert replacement on US 6 and Green Riv River Rd/Osco Rd 0.3 mi W to 0.5 mi E of Osco Rd. 1,500 gross feet. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $2,705,618 ·
Apr 25, 2025 64U32 HenryDistrict 2 2.34 miles of HMA milling and resurfacing on US 6 from IL 78 in Annawan to 0.3 miles west of Bureau County Line. — Executed Nov 25 New Advanced Asphalt Company $1,442,827 ·
Jun 13, 2025 61L49 McHenryDistrict 1 Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments. — Executed Nov 25 New Alliance Contractors, Inc. $1,194,482 ·
Jun 13, 2025 61L50 McHenryDistrict 1 HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders. — Executed Nov 25 New Geske and Sons, Inc. $1,758,088 ·
Jun 13, 2025 61L51 McHenryDistrict 1 Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove. — Executed Nov 25 New Geske and Sons, Inc. $588,609 ·
Jun 13, 2025 62L61 McHenryDistrict 1 (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock. — Executed Nov 25 New Curran Contracting Company $2,693,463 ·
Jun 13, 2025 62V52 McHenryDistrict 1 (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake. — Executed Nov 25 New Curran Contracting Company $2,389,468 ·
Jun 13, 2025 62V57 McHenryDistrict 1 (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake. — Executed Nov 25 New Curran Contracting Company $2,685,966 ·
Jun 13, 2025 62X35 McHenryDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface cours (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County. — Executed Nov 25 New Plote Construction, Inc. $2,341,185 ·
Jun 13, 2025 62X66 McHenryDistrict 1 Pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County. — Executed Nov 25 New Plote Construction, Inc. $1,405,173 ·
Jun 13, 2025 62X68 McHenryDistrict 1 (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $881,875 ·
Jun 13, 2025 64T32 HenryDistrict 2 1.82 miles of crack joint sealing on IL 81 from Galva-Atkinson Rd to WestSt in Kewanee and from US 150 to 0.4 miles west of I-74. — Executed Nov 25 New Denler, Inc. $160,257 ·
Jun 13, 2025 68510 HenryDistrict 4 Bridge replacement: SN's 037-0019, 037-0049, 037-0020, and 037-0053 carrying Interstate 74 over IL Route 17 west of Woodhull. — Rejected Nov 25 New IHC Construction Companies, L.L.C. $15,796,785 ·
Sep 19, 2025 62T23 McHenryDistrict 1 Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $257,146 ·
Sep 19, 2025 64P76 HenryDistrict 2 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). — Executed Nov 25 New Advanced Asphalt Company $2,339,070 ·
Nov 7, 2025 61L88 McHenryDistrict 1 Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. — Executed Nov 25 New Dunnet Bay Construction Company $5,134,451 ·
Nov 7, 2025 64U80 HenryDistrict 2 9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps. — Executed Nov 25 New Advanced Asphalt Company $342,730 ·
Nov 7, 2025 64U82 HenryDistrict 2 9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson. — Executed Nov 25 New Advanced Asphalt Company $529,895 ·
Nov 7, 2025 64U87 HenryDistrict 2 16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $355,924 ·
Nov 7, 2025 85783 HenryDistrict 2 Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding. — Executed Nov 25 New Advanced Asphalt Company $535,939 ·
1–38 of 38

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.