Filtered by: County: Henry Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2020 | 62G27 | McHenryDistrict 1 | 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. | — | Executed | Payne & Dolan, Inc. $1,469,929 · | ||
| Jan 17, 2020 | 62K14 | McHenryDistrict 1 | Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. | — | Executed | Martam Construction Incorporated $1,184,616 · | ||
| Jan 17, 2020 | 64M46 | HenryDistrict 2 | 7.94 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles E of the I-74/I-80 interchange to 0.5 miles W of IL 82. | — | Executed | Denler, Inc. $598,283 · | ||
| Mar 6, 2020 | 62F91 | McHenryDistrict 1 | Overlay Smart, ADA improvements, and milled rumble strips on IL 120 from IL 47 to Martin Rd. | — | Executed | Curran Contracting Company $3,512,337 · | ||
| Apr 24, 2020 | 61G43 | McHenryDistrict 1 | Construction of a multi-use path adjacent to Reed Road from Vine Street to IL 47 in the Village of Huntley. | — | Executed | Martam Construction Incorporated $239,749 · | ||
| Apr 24, 2020 | 62D36 | McHenryDistrict 1 | Project 14,023 LF. Pavement widening, pavement reconstruction, construction of a turnabout, curb and gutter, sidewalk, proposed drainage. replacement of a box culvert with three box culverts and two retaining walls. | — | Executed | Curran Contracting Company $9,727,727 · | ||
| Apr 24, 2020 | 62K57 | McHenryDistrict 1 | Light tower and foundation removal, install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at US 14 at IL 31 in Crystal Lake. | — | Executed | Hecker and Company, Inc. $679,721 · | ||
| Jun 12, 2020 | 61G63 | McHenryDistrict 1 | Sidewalk and pedestrian crossing improvements on West Main Street from Cary-Algonquin Road to Wulff street in Cary | — | Executed | A Lamp Concrete Contractors, Inc. $162,319 · | ||
| Jun 12, 2020 | 64P33 | HenryDistrict 2 | Cleaning and painting beam ends on SN's 037-0001 and 037-0002 carrying I-74/280 over Mosquito Creek. | — | Executed | Three Star Painting, Inc. $95,000 · | ||
| Jun 12, 2020 | 68F55 | HenryDistrict 4 | Culvert repair to SN 037-2010 on I-74/IL 110, 0.1 mile N of the Knox County line. | — | Executed | Phoenix Corporation of the Quad Cities $79,729 · | ||
| Jul 31, 2020 | 46552 | McHenryDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. | — | Executed | Superior Road Striping, Inc. $308,371 · | ||
| Jul 31, 2020 | 68F93 | HenryDistrict 4 | Pavement patching on EB I-74 entrance and exit ramps at IL 17 near Woodull in Henry County. | — | Executed | G. M. Sipes Construction, Inc. $106,730 · | ||
| Sep 18, 2020 | 62M66 | McHenryDistrict 1 | Building Demolition at 3 locations. Location No. 1: 2103 N. Woodlawn Parkway; Location No. 2 2107 N. Woodlawn Parkway; Locaton No. 3 W. side of IL 31, approximately 2,250-ft N. of McCullom Lake. | — | Executed | MYS, Incorporated $360,168 · | ||
| Nov 6, 2020 | 61G72 | McHenryDistrict 1 | Sidewalk improvements including ADA ramp installation along Chapel Hill Road from Reed Avenue to Fairview Avenue in Johnsburg. | — | Executed | A Lamp Concrete Contractors, Inc. $149,541 · | ||
| Nov 6, 2020 | 62A80 | McHenryDistrict 1 | (0.45 miles) the type of work is Bridge Replacement in McHenry County, over Kishwaukee River: SN 056-0025. | — | Executed | Plote Construction, Inc. $7,441,279 · | ||
| Nov 6, 2020 | 62J35 | McHenryDistrict 1 | Bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary (0.09-Mile) Improvement of US 14 over Fox River consists of bridge deck overlay and joint repairs, located in the Village of Fox River Grove and Village of Cary. | — | Executed | Martam Construction Incorporated $813,564 · | ||
| Nov 6, 2020 | 62N02 | KaneMcHenryDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties. | — | Active | Illinois Central Sweeping LLC $495,000 · | ||
| Nov 6, 2020 | 64P50 | HenryDistrict 2 | Concrete overlays on the structures (037-0009 and 037-0010) carrying 1-74 over the Osco-Orion Road (FAS 2224A). | — | Executed | General Constructors Inc. of the Quad Cities $627,394 · |
1–18 of 18
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.