IDOT Jobs

2022 · 17 jobs · — Sign up free
★ My Jobs

Filtered by: County: Ford Clear all

17 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 21, 2022 66M12 FordDistrict 3 Cleaning and painting all structural steel and other steel components of the structure This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $311,138 ·
Apr 29, 2022 66L03 FordDistrict 3 A SMART overlay with 1 This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,153,189 ·
Apr 29, 2022 66M34 FordDistrict 3 Class B pavement patching and other related construction work This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work. — Executed Nov 26 New Terrazas, LLC $183,566 ·
Apr 29, 2022 66M45 FordDistrict 3 Class B pavement patching and related construction work This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. — Rejected Nov 26 New Iroquois Paving Corporation $391,494 ·
Apr 29, 2022 68F87 MarshallWoodfordDistrict 4 Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. — Executed Nov 26 New Advanced Asphalt Company $25,968,870 ·
Apr 29, 2022 68G30 WoodfordDistrict 4 Cape Seal on Il 116/117 from IL 117(N) to 1-39. — Executed Nov 26 New Beniach Construction Co., Inc. $692,608 ·
Apr 29, 2022 68G77 KnoxWoodfordDistrict 4 Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. — Executed Nov 26 New Laser Electric, Inc. $179,815 ·
Apr 29, 2022 68G78 WoodfordDistrict 4 Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. — Executed Nov 26 New Three Star Painting, Inc. $500,000 ·
Apr 29, 2022 87771 FordDistrict 3 Resurfacing Buckley Road from IL 54 to the Iroquois County line. — Executed Nov 26 New Iroquois Paving Corporation $1,239,137 ·
Jun 17, 2022 66B77 FordDistrict 3 3P milling and resurfacing (design overlay) This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay). — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $4,357,980 ·
Jun 17, 2022 66L89 FordDistrict 3 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement. — Executed Nov 26 New Iroquois Paving Corporation $4,972,663 ·
Jun 17, 2022 66M60 FordDistrict 3 Class A Pavement Patching and related construction work This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work. — Executed Nov 26 New G. M. Sipes Construction, Inc. $231,790 ·
Jun 17, 2022 68G65 WoodfordDistrict 4 Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. — Executed Nov 26 New Stark Excavating, Inc. $157,836 ·
Jun 17, 2022 68H04 TazewellWoodfordDistrict 4 2.9 miles of median removal and manhole/inlet repairs. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $155,327 ·
Jun 17, 2022 87798 FordDistrict 3 Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54. — Rejected Nov 26 New Iroquois Paving Corporation $397,927 ·
Jun 17, 2022 89812 WoodfordDistrict 4 HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $614,969 ·
Nov 18, 2022 74755 CrawfordDistrict 7 Replacement of SN 017-0022 carrying IL 1 over an unnamed creek, 1.8 miles South of IL 33. — Executed Nov 26 New White Construction LLC $1,238,552 ·
1–17 of 17

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.