| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 70D05 | EdgarDistrict 5 | Patching from IL 49 to Paris. | — | Executed | Ne-Co Asphalt Co., Inc. $86,200 · | ||
| Apr 27, 2018 | 91529 | EdgarDistrict 5 | Widening and resurfacing on CH 33 from Cherry Point Road to Sprinfield Road in Paris. | — | Executed | Howell Paving, Inc. $1,892,228 · | ||
| Mar 8, 2019 | 70A99 | EdgarDistrict 5 | Standard overlay from 0.5 mile south of Gibson Dr. in Paris to Clark county line for a distance of 7.204 miles. | — | Executed | Howell Paving, Inc. $2,057,468 · | ||
| Apr 26, 2019 | 70D50 | EdgarDistrict 5 | New PCC shoulder with inlet and curb, and new pipe drains at US 150 east of Paris. | — | Rejected | |||
| Jun 14, 2019 | 70C02 | EdgarDistrict 5 | BRIDGE DECK REPAIRS ON 3 (SN 023-0001, SN 023-0002, SN 023-0003) STRUCTURES CARRYING US 150. | — | Executed | Open Road Paving Company LLC $494,434 · | ||
| Jun 14, 2019 | 70D18 | EdgarDistrict 5 | STORM SEWER REMOVAL AND PATCHING IDOT DISTRICT 5 PARKING LOT. | — | Executed | Kieffer Bros. Construction Co., Inc. $544,106 · | ||
| Jun 14, 2019 | 70D33 | EdgarVermilionDistrict 5 | IL 119: 7.609 MILES OF A1 SURFACE TREATMENT FROM 2.8 MILES WEST OF ALVIN TO INDIANA STATE LINE; US 36: 7.572 MILESOF A1 SURFACE TREATMENT FROM IL 1 AT CHRISMAN TO INDIANA STATE LINE. | — | Executed | Illiana Construction Co., Inc., A Div. of Champaign Asphalt Company $543,072 · | ||
| Mar 6, 2020 | 91591 | EdgarDistrict 5 | Guardrail and terminal removal and the installation of new guardrail and terminals on various routes. | — | Executed | Lovewell Fencing, Inc. $920,467 · | ||
| Apr 24, 2020 | 70E28 | EdgarDistrict 5 | 0.041 Mile of pavement removal, earth excavation, and jointed PCC pavement at the sign shop parking lot in Paris. | — | Executed | Feutz Contractors, Inc. $383,735 · | ||
| Jun 12, 2020 | 70D74 | DouglasEdgarDistrict 5 | 10.387 miles of resurfacing (3P policy standard overlay), new shoulders, milled rumble overlay, and culvert replacement from Vermilion/Edgar Co. line to 1800th Rd N of Brocton. | — | Executed | Open Road Paving Company LLC $7,391,354 · | ||
| Apr 23, 2021 | 70E92 | DouglasEdgarDistrict 5 | 12.579 Miles of Cape Seal Operations from ILL 130 South to ILL 49. | — | Executed | Beniach Construction Co., Inc. $933,139 · | ||
| Jun 11, 2021 | 70B02 | EdgarDistrict 5 | 1.702 Miles Total/11.113 Miles Net of 3P Policy Standard Overlay, Misc. Roadway Work, New Shoulders, Milled Rumble Strip from 1800th RD N of Brocton to Kansas NCL. | — | Executed | Howell Paving, Inc. $6,206,182 · | ||
| Apr 29, 2022 | 70F44 | EdgarDistrict 5 | Patching and Parking Improvements at the Paris Headquarters Complex-East Parking Lot with ADA Improvements. | — | Executed | Feutz Contractors, Inc. $518,656 · | ||
| Apr 29, 2022 | 70F83 | EdgarDistrict 5 | 8.182 Miles, Guardrail Improvements. Lower Terre Haute Rd. to Indiana State. | — | Executed | Midwest Fence Corporation $788,584 · | ||
| Apr 29, 2022 | 91598 | EdgarDistrict 5 | Resurfacing and HMA shoulders with rumble strips on CH 4, from 0.3 mile south of US 150 to 0.10 mile east of Ferrel Street. | — | Executed | Open Road Paving Company LLC $4,333,829 · | ||
| Jun 17, 2022 | 70608 | EdgarDistrict 5 | Bridge Replacement Over Catfish Creek 2.5 Miles North of ILL 133. | — | Executed | White Construction LLC $3,930,382 · | ||
| Apr 28, 2023 | 70E29 | EdgarDistrict 5 | West Parking Lot Resurfacing with ADA Improvements, Paris Headquarters Complex. | — | Executed | Ne-Co Asphalt Co., Inc. $416,368 · | ||
| Jun 16, 2023 | 70G43 | EdgarDistrict 5 | Mast arm removal RAP 332, U.S. 150/IL. 1 (SB Central St; NB Main St.) at Madison St. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $56,318 · | ||
| Sep 22, 2023 | 70G86 | EdgarDistrict 5 | 3.06 miles of patching on Elliott St in Paris; at various locations between 2100th Rd and 1800th Rd South of Chrisman. | — | Executed | Beniach Construction Co., Inc. $202,417 · | ||
| Jan 19, 2024 | 70B89 | EdgarDistrict 5 | 5.174 MI, 3P Policy-Designed Overlay, New Shoulders Milled Rumble Strip, 1800th St. E of Paris to Indiana State Line / Culvert Replacement, at Vermilion Rd. INT 3.9 MI E of Paris ECL. | — | Executed | Open Road Paving Company LLC $9,851,467 · | ||
| Apr 26, 2024 | 70D26 | EdgarDistrict 5 | Culvert replacement field entrance east of Hume Station 1185+00. | — | Executed | Cross Construction, Inc. $500,000 · | ||
| Jun 14, 2024 | 70C14 | EdgarDistrict 5 | Gross Length 75,737.81 FT = 14.344 MI, Net Length 75,460.81 = 14.292 MI. Standard Overlay Resurfacing and Culvert Replacement of FAP 749 (ILL 133) from Coles Co Line to ILL 16 in Paris. | — | Executed | Howell Paving, Inc. $12,326,497 · | ||
| Nov 8, 2024 | 91630 | EdgarDistrict 5 | Replace PCC Sidewalk at Carolyn Wenz Elementary School, Paris Mayo Middle School, and Allen Memorial Field in Paris. Work includes Concrete Curb replacement, HMA removal, ADA Improvements, drainage improvements and seeding. | — | Executed | McCarthy Improvement Company $359,182 · | ||
| Mar 7, 2025 | 70F98 | EdgarDistrict 5 | HMA surface removal and resurfacing at various locations along US 150 mainline and shoulder pavement from 125' west of Lower Terre Haute Rd in Paris ,IL to a point approximately 0.3 mile west of CNRL Railroad including the Sulphur Springs Rd and Court St intersection. 2.531 miles gross length. | — | Executed | Evergreen Roadworks, LLC $6,670,718 · | ||
| Jun 13, 2025 | 70E30 | EdgarDistrict 5 | Parking improvement at Paris D5 Headquarters. | — | Executed | McCarthy Improvement Company $1,111,995 · | ||
| Jun 13, 2025 | 91631 | EdgarDistrict 5 | Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals. | — | Executed | Big O Services, LLC $1,648,370 · | ||
| Feb 27, 2026 | 70H62 | DouglasEdgarDistrict 5 | Bridge deck repairs to S.N. 021-0049 and S.N. 023-0026 carrying FAP 820 (IL-130) and FAP 836 IL-49 in Douglas and Edgar Counties. | — | Executed | Sangamo Construction Company $926,892 · | ||
| Jun 12, 2026 | 70D62 | EdgarDistrict 5 | Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge. | — | Executed | William Charles Construction Company, LLC $7,986,429 · | ||
| Jul 31, 2026 | 91669 | EdgarDistrict 5 | HMA resurfacing of CH 4 from southeast of the city of Paris to E. 575th Rd. in Edgar County. | — | Executed | Evergreen Roadworks, LLC $2,189,996 · |
1–29 of 29
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.