Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2026 | 61L54 | CookDistrict 1 | HMA resurfacing of FAU 1447 (16th St.) from Harlem Ave. to Lombard Ave. in the City of Berwyn. Additional work includes traffic signal improvements, curb and gutter repair, pavement markings and other required work. | — | Executed | Martam Construction Incorporated $10,340,904 · | ||
| Apr 24, 2026 | 61M15 | CookDistrict 1 | Construct a prefabricated truss bridge with approach spans to carry a shared-use path over US 14 and Union Pacific Railroad. Includes; MSE walls, HMA path, sidewalk, pavement patching, landscaping, and drainage improvements from Melas Park to Meadows Park in Mount Prospect. | — | Executed | Dunnet Bay Construction Company $10,744,243 · | ||
| Apr 24, 2026 | 62K33 | CookDistrict 1 | (2.03-Mile) The project includes widening and reconstruction of Barrington Road to provide two lanes in each direction separated by a median from Mundhank Road to IL 62, replacing the Poplar Creek box culvert, modernizing and replacing traffic signals, interconnection, sidewalk and shared-use paths, ADA improvements, landscaping. The project is located on Barrington Road from Central Road to IL 62 (Algonquin Road). | — | Executed | Plote Construction, Inc. $31,680,000 · | ||
| Apr 24, 2026 | 62L85 | CookDistrict 1 | Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (1,525-Ft) Standard Overlay consists of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Located in the Village of Forest Park, Cook County. | — | Executed | K-Five Construction Corporation $852,460 · | ||
| Apr 24, 2026 | 62P51 | CookDistrict 1 | Earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter (3,935-Ft) Traffic Signal Modernization and lighting installation project consists of earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter removal, pavement patching, installation of aggregate and (HMA) shoulders, widening with (HMA) base course, resurfacing with polymerized (HMA) binder and polymerized (HMA) surface courses, structure adjustments, installation of storm sewer, drainage structures, sidewalk, shared-use path, driveways, lig | — | Executed | Martam Construction Incorporated $6,339,172 · | ||
| Apr 24, 2026 | 62X31 | CookWillDistrict 1 | (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) | — | Executed | D. Construction, Inc. $135,363 · | ||
| Apr 24, 2026 | 62X44 | CookDistrict 1 | Bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical This improvement consists of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the faces of curbs/raised medians, and inside and outside of dividing walls along walkways of the structure, roadway faces of parapets. (41) SN locations along I-90/94 (Edens and Kennedy Expressways) in the City of Chicago, Villages of Skokie and Wilmette, Cook County. | — | Executed | Mosley Construction 1, LLC $459,265 · | ||
| Apr 24, 2026 | 62X57 | CookDistrict 1 | Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement (1.27-Mile) Design Overlay consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Wilmette, Kenilworth and Winnetka. | — | Executed | Schroeder Asphalt Services, Inc. $1,529,254 · | ||
| Apr 24, 2026 | 62Y28 | CookDistrict 1 | Furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS equipment to run on cellular communications. This work also consists of installing temporary fiber optic cable. Improvements associated with this project are located with the Villages of Hillside, Bellwood, Westchester, Broadview, Maywood, Forest Park, and Oak Park, as well as the City of Chicago in Cook County, on I-290 between Wolf Road and Racine Avenue. | — | Executed | Meade Inc. $9,649,148 · | ||
| Apr 24, 2026 | 62Y30 | CookDistrict 1 | Scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk (190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. This project is in the City of Chicago in Cook County. | — | Executed | Martam Construction Incorporated $786,723 · | ||
| Apr 24, 2026 | 80B09 | CookDistrict 1 | (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerize (9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerized (HMA) binder course, thermoplastic pavement markings and preformed plastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement The project is located within the Village of Elk Grove in Elk Grove Township in Cook County. | — | Executed | Builders Paving, LLC $4,440,808 · | ||
| Apr 24, 2026 | 80B21 | CookDistrict 1 | (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace (3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace), sidewalk removal, thermoplastic pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. This project is in the Village of Schaumburg in Cook County. | — | Executed | K-Five Construction Corporation $4,582,944 · | ||
| Apr 24, 2026 | 80B26 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers located in the City of Blue Island and Village of Calumet Park in Cook County. | — | Executed | Gallagher Asphalt Corporation $2,940,592 · | ||
| Apr 24, 2026 | 80B27 | CookDistrict 1 | (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (HMA) binder course, thermoplastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement and median repair. The project is located within the City of Des Plaines in Maine Township in Cook County. | — | Executed | Plote Construction, Inc. $5,915,339 · | ||
| Apr 24, 2026 | 80B30 | CookDistrict 1 | (2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, earth excavation, pavement patching, resurfacing with HMA, full depth HMA shoulder, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Located on IL 171 (Archer Avenue) in the Village of Lemont, Cook County. | — | Executed | K-Five Construction Corporation $4,118,431 · | ||
| Apr 24, 2026 | 80B39 | CookDistrict 1 | Resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sid (4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sidewalks. Location along US 34 (Ogden Ave) in the Cities of Brookfield, LaGrange, Lyons, and Riverside in Cook County. | — | Executed | K-Five Construction Corporation $6,442,571 · | ||
| Apr 24, 2026 | 80B48 | CookDistrict 1 | (1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing bridge deck, concrete patching. The existing guardrail and bridge rails will be updated to meet standards. Pavement marking will be reestablished at the end of the construction. Project is in the city of Chicago, Cook County, Illinois, along Central Avenue over the North Branch of the Chicago River. | — | Executed | Martam Construction Incorporated $1,108,954 · | ||
| Apr 24, 2026 | 80B55 | CookDistrict 1 | Bridge painting of the structures (Roosevelt Rd This improvement consists of bridge painting of the structures (Roosevelt Rd. over I-90/94 (Dan Ryan Expwy) SN: 016-0478, and Wilson Ave. over I-94 (Edens Expwy) SN: 016-2038. All structures are located at City of Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,123,158 · | ||
| Apr 24, 2026 | 80B62 | CookDistrict 1 | (373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarification, full and partial depth repairs to bridge slab and approach slab, HMA overlay on approach slabs, bridge deck grooving, concrete repair, maintenance of traffic, pavement marking, ADA ramps located on the Chicago Avenue bridge over I-90/94 in the City of Chicago in Cook County. | — | Executed | Martam Construction Incorporated $1,446,233 · | ||
| Apr 24, 2026 | 80B79 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Charles & Charlie Janitorial Landscaping LLC $628,506 · | ||
| Apr 24, 2026 | 80B80 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | Orlando Lawn Service, Inc. $150,790 · | ||
| Apr 24, 2026 | 80C49 | CookDistrict 1 | Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder (2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavem | — | Executed | K-Five Construction Corporation $4,164,775 · |
1–22 of 22
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.