IDOT Jobs

Jan 2026 · 23 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook Clear all

23 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 16, 2026 60R94 CookDistrict 1 (3366.37-Ft) Intersection Reconstruction of IL-171 at 95th Street, reconfigure the existing "wye" intersection into a "tee" intersection, in Unincorporated Willow Springs, Illinois in. Cook County. — Executed Nov 25 New OHLA Central, Inc. $8,643,219 ·
Jan 16, 2026 61K16 CookDistrict 1 Roadway reconstruction, lighting and traffic signal modernization on Belmont Avenue from Williams Drive to Mannheim Road and on Mannheim Road from South of Gage Avenue to Anderson Place in Franklin Park. — Executed Nov 25 New Alliance Contractors, Inc. $3,835,382 ·
Jan 16, 2026 61L75 CookDistrict 1 Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $424,594 ·
Jan 16, 2026 61L89 CookDistrict 1 HMA resurfacing on Maple Avenue from Brookfield Avenue to 31st Street in Brookfield. Includes pavement patching, curb and gutter, sidewalk, driveways, ADA ramps, curb bump-outs, and flashing beacons. — Executed Nov 25 New Builders Paving, LLC $1,934,050 ·
Jan 16, 2026 61L90 CookDistrict 1 Resurfacing on Jackson Boulevard from Des Plaines Avenue to Harlem Avenue in Forest Park. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $3,554,981 ·
Jan 16, 2026 61M09 CookDistrict 1 HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in Berwyn. Includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements and traffic signal modernization. — Executed Nov 25 New Martam Construction Incorporated $7,777,148 ·
Jan 16, 2026 62321 CookDistrict 1 (1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue located in the City of Chicago Cook County. — Executed Nov 25 New MAT Construction Leasing, Inc. $548,280 ·
Jan 16, 2026 62D34 CookDistrict 1 The removal and replacement of the existing bridge including traffic signal modernization and ADA improvements (430-Ft) Proposed improvement consists of the removal and replacement of the existing bridge including traffic signal modernization and ADA improvements located on Touhy Avenue at North Branch of the Chicago River in Cook County. — Executed Nov 25 New Lorig Construction Company $6,966,559 ·
Jan 16, 2026 62K62 CookDistrict 1 The construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconst (480-Ft) The work consists of the construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. Located along Central Park Avenue over I-290 in the City of Chicago, Cook County, Illinois. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $19,469,072 ·
Jan 16, 2026 62K64 CookDistrict 1 (780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement located at I-290 at Paulina Street. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,918,848 ·
Jan 16, 2026 62K65 CookDistrict 1 (740-Ft) Bridge Superstructure reconstruction (SN-016-0754), approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting located I-290 at Sacramento Boulevard. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,380,221 ·
Jan 16, 2026 62P93 CookDistrict 1 ADA Improvements: curb ramps for sidewalks (ADA) including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warning surfaces, drainage structure adjustments, minor traffic signal improvements (accessible pedestrian signals), thermoplastic pavement markings work. Location: Various Routes, Various Locations within Norwood Park and Leyden Townships (Villages of Norridge, Park Ridge, River Grove and Elmwood Park). — Executed Nov 25 New Triggi Construction, Inc. $2,633,662 ·
Jan 16, 2026 62U12 CookDistrict 1 (520-Ft) Bridge Superstructure replacement, approach slab replacement, lighting ADA improvement and traffic signal modernization. The project is located at Structure No. 016-2114 on Loomis Street over I-290 in the City of Chicago in Cook County. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $11,102,837 ·
Jan 16, 2026 62V42 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement marki (4,061-Ft) Standard Overlay and ADA improvements consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Morton Grove in Cook County. — Rejected Nov 25 New
Jan 16, 2026 62W33 CookDistrict 1 (2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. Location of Work: FAU 2843: Dixie Hwy, from Harwood Avenue to north of Sycamore Drive, within the Village of Homewood in Cook County. — Executed Nov 25 New Iroquois Paving Corporation $7,521,180 ·
Jan 16, 2026 62W47 CookDistrict 1 (2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting locations at IL 7 (Southwest Hwy) and IL 43 (Harlem Ave) in the Villages of Worth and Chicago Ridge in Cook County. — Executed Nov 25 New D. Construction, Inc. $3,827,864 ·
Jan 16, 2026 62Y14 CookDistrict 1 I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic (296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. This project is in the City of Chicago Heights, in Cook County, IL. — Executed Nov 25 New D. Construction, Inc. $742,733 ·
Jan 16, 2026 80B18 CookDistrict 1 Hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized h (767.78-Ft) Designed Overlay Project consists of hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized hot-mix asphalt binder course, placement of thermoplastic and preformed plastic pavement markings, pavement patching, combination concrete curb and gutter removal and replacement. The project is located within the City of Elgin in Hanover Townships in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $556,373 ·
Jan 16, 2026 80B19 CookDistrict 1 Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (3,512-Ft) Standard Overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching and pavement markings. This project located on IL-1 (Halsted St) from South of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood within Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $959,778 ·
Jan 16, 2026 80B81 CookDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to I-57 / I-94 (Bishop Ford Expwy) in Cook County. — Executed Nov 25 New Thor General Contracting LLC $293,485 ·
Jan 16, 2026 80B82 CookDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish which has accumulated on the highway areas. This work is located on I-190; I-90/94 expressways from W. of US 12/45 Mannheim Rd to Congress Pkwy in Cook County. — Executed Nov 25 New Thor General Contracting LLC $196,829 ·
Jan 16, 2026 80B85 CookDuPageDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-290/ IL 110; I-290A, FAP 342 and ILL 53 expressways from Lake Cook Road to Wells St. in Cook and DuPage Counties. — Executed Nov 25 New Thor General Contracting LLC $650,328 ·
Jan 16, 2026 80B86 CookDuPageWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Reed Road to Lake Shore Dr in Cook, DuPage, and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $515,515 ·
1–23 of 23

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.