Filtered by: County: Coles Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 74A74 | ColesEffinghamDistrict 7 | Lighting upgrades to LED on I-57 at US 45 and at IL 16 in Mattoon and at the northbound Green Creek Rest Area. | — | Executed | Bodine Electric of Decatur $525,537 · | ||
| Mar 11, 2022 | 74A82 | ColesDistrict 7 | Placing 8.3 miles of aggregate shoulders on US 45 from the Douglas County line to Donnelly Road. | — | Executed | Beniach Construction Co., Inc. $144,480 · | ||
| Mar 11, 2022 | 95909 | ColesDistrict 7 | Resurfacing, sidewalks, curb and gutter, patching, and pavement markings on Dewitt Avenue, from east of 14th Street to Logan Street in Mattoon. | — | Executed | Howell Paving, Inc. $1,320,207 · | ||
| Mar 11, 2022 | 95913 | ColesDistrict 7 | Resurfacing CH 27 from Country Club Road to Old State Road. | — | Executed | Ne-Co Asphalt Co., Inc. $178,093 · | ||
| Apr 29, 2022 | 74A21 | ColesDistrict 7 | 4.4 miles of resurfacing on IL 49 from the Clark County line to IL 16. | — | Executed | Howell Paving, Inc. $978,300 · | ||
| Apr 29, 2022 | 74A23 | ColesDistrict 7 | 2.3 miles of patching, milling and resurfacing on Dewitt Avenue from Logan Avenue to Lerna Road in Mattoon. | — | Executed | Howell Paving, Inc. $739,240 · | ||
| Apr 29, 2022 | 74A78 | ColesDistrict 7 | 14.5 miles of patching on I-57 from mile post 181 to mile post 195.5. | — | Executed | Beniach Construction Co., Inc. $411,367 · | ||
| Apr 29, 2022 | 74A89 | ColesDistrict 7 | 6.7 miles of patching, milling and resurfacing on IL 130 from 1.8 miles south of IL 16 in Charleston to the Cumberland County line. | — | Executed | Howell Paving, Inc. $1,960,827 · | ||
| Nov 18, 2022 | 74362 | ColesDistrict 7 | Bridge replacement for SN 015-0022 carrying US 45 over Flat Branch, 0.1 miles south of South-Side Drive in Humboldt. | — | Executed | Sangamo Construction Company $2,218,287 · | ||
| Nov 18, 2022 | 74A70 | ColesDistrict 7 | Replacing the approach slabs, bridge wearing surfaces, and joints on SN 015-0009 and 015-0010 This project is located on 1-57 over S Fork Branch 0.5 miles S of Humboldt. The work consists of replacing the approach slabs, bridge wearing surfaces, and joints on SN 015-0009 and 015-0010. | — | Executed | Samron Midwest Contracting, Inc. $1,298,767 · |
1–10 of 10
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.