Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 11, 2022 | 66L57 | BureauDistrict 3 | Work begins in Ohio, Illinois at the intersection of IL 26 and IL 92 and goes West 9.9 miles including a 3P milling and resurfacing of IL 92, drainage improvements, and guardrail improvements. The project terminates at the junction of US 34 and IL 89 in La Moille, Illinois. | — | Executed | Advanced Asphalt Company $3,472,037 · | ||
| Mar 11, 2022 | 87784 | BureauDistrict 3 | Sidewarlk construction and replacemnt at various locations within Princeton. | — | Executed | Advanced Asphalt Company $363,355 · | ||
| Mar 11, 2022 | 87785 | BureauDistrict 3 | Sidewalk replacement at various locations in DePue. | — | Executed | Advanced Asphalt Company $248,541 · | ||
| Apr 29, 2022 | 66A79 | BureauDistrict 3 | 3P milling and resurfacing This work is located at FAS 1247 (US 6), approximately 1.0 miles East of Henry County Line to US 34 (S) in Sheffield in Bureau County (+/-5.74 miles). This work consists of 3P milling and resurfacing. | — | Executed | Advanced Asphalt Company $3,588,523 · | ||
| Apr 29, 2022 | 66F91 | BureauDistrict 3 | The project consists on the removal and replacement of six concrete box culverts on IL 29 (DePue Spur) in Bureau County. The scope of work includes milling and resurfacing the area in between culverts and guardrail upgrades. Traffic control shall be achieved by detour. The project length is 0.6 miles. | — | Executed | Gensini Excavating, Inc. $3,420,890 · | ||
| Apr 29, 2022 | 66K35 | BureauDistrict 3 | Spot improvement to remove and replace a box culvert located 0.2 mile South of IL 92 in Ohio IL. | — | Executed | Phoenix Corporation of the Quad Cities $535,704 · | ||
| Apr 29, 2022 | 66K57 | BureauDistrict 3 | Work begin at IL 92/IL 89 intersection just North of Lamoille and end 0.2 mile South of Plank Road in Cherry. The project is a 3P milling and resurfacing of IL 89 including drainage and ADA improvements. | — | Executed | Advanced Asphalt Company $5,628,157 · | ||
| Apr 29, 2022 | 66K73 | BureauDistrict 3 | Bridge Replacements SN 006-0117 and SN 006-0121 under TR 60B 4.8 miles East of Henry County Line; under TR 82C, 1.5 miles north of Sheffield. | — | Executed | D. Construction, Inc. $7,246,218 · | ||
| Apr 29, 2022 | 66L72 | BureauDistrict 3 | Work begin 0.1 mile East of Lincoln Avenue in Depue and at IL 89 in Spring Valley. The project is a SMART overlay, shoulder widening and rumble strips. | — | Executed | Advanced Asphalt Company $1,899,841 · | ||
| Jun 17, 2022 | 66M35 | BureauLaSalleDistrict 3 | Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. | — | Executed | All States Painting, Inc. $378,400 · | ||
| Jun 17, 2022 | 87778 | BureauDistrict 3 | Replace the double barrel box culvert with a 10' x 12' double barrel reinforced concrete box culvert over Hickory Creek at Backbone Road. | — | Executed | Gensini Excavating, Inc. $961,378 · | ||
| Sep 23, 2022 | 66M91 | BureauLaSalleDistrict 3 | Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,093,285 · | ||
| Nov 18, 2022 | 66M31 | BureauDistrict 3 | Milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised refl This project is located on FAP 587 (US 34) beginning N. of LaMoille and ending at the LaSalle County line,_for a total of 5.85 miles. Work consists of milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,765,431 · | ||
| Nov 18, 2022 | 66M74 | BureauDistrict 3 | Structure No. 006-0153, Bridge Rehabilitation, 3.3 mi. west of US 34 (Lamoille). | — | Executed | D. Construction, Inc. $546,258 · |
1–14 of 14
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.