Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 18, 2019 | 66H81 | BureauDistrict 3 | Cleaning and painting all strucutral steel of SN 006-0090 carrying IL 40 over Hennepin Canal. | — | Executed | Thomas Industrial Coatings, Inc. $99,935 · | ||
| Jan 18, 2019 | 66J37 | BureauDistrict 3 | Concrete deck, bearing, expansion joint, floor drain, guardrail/terminal section removal and replacement, and installing steel bridge railing to SN 006-0061 carrying US 6 over King Creek. | — | Executed | D. Construction, Inc. $426,461 · | ||
| Jan 18, 2019 | 66J43 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0039 carrying FAI 180 over FAI 80 approximately 4 miles east of Princeton. | — | Executed | ERA-Valdivia Contractors, Inc. $424,473 · | ||
| Jan 18, 2019 | 66J46 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0142 carrying IL 89 over a branch of Brush Creek approximately 0.8 miles south of Arlington. | — | Executed | Thomas Industrial Coatings, Inc. $101,065 · | ||
| Mar 8, 2019 | 66J76 | BureauLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Laser Electric, Inc. $75,883 · | ||
| Apr 26, 2019 | 87698 | BureauDistrict 3 | Replace the bridge carrying TR 281 over East Bureau Creek, 3.5 miles west of Depue. | — | Executed | Stark Excavating, Inc. $1,004,126 · | ||
| Jun 14, 2019 | 46917 | BureauDistrict 3 | 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. | — | Executed | Phoenix Corporation of the Quad Cities $476,639 · | ||
| Jun 14, 2019 | 66E21 | BureauDistrict 3 | 4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS. | — | Executed | Advanced Asphalt Company $3,128,659 · | ||
| Jun 14, 2019 | 66J87 | BureauDistrict 3 | 10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80. | — | Executed | A. C. Pavement Striping Co. $328,924 · | ||
| Jul 12, 2019 | 66H58 | BureauDistrict 3 | 9.9 miles of 3P 3.75" milling and resurfacing on IL-26 from N of IL-92 to S of red covered bridge road according to tamp designed overlay policy. Other work includes shoulder stone, pavement marking, and raised reflective pavement markers. | — | Executed | Advanced Asphalt Company $4,128,627 · | ||
| Aug 2, 2019 | 66A92 | BureauDistrict 3 | 6.03 miles of 3P milling and resurfacing on IL 40 from the Burlington Northern Santa Fe Railroad south of Buda to the Stark County line. Includes approach work on SN 006-0145, guardrail with shoulder stabilization, aggregate ditch checks, intermittent resurfacing, shoulder stone, pavement marking and raised reflectors. | — | Executed | Advanced Asphalt Company $3,084,437 · |
1–11 of 11
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.