220Let jobs
$674,826,945Total low bids
$780,793,194Total estimates
-13.6%Low bids vs estimates
Jul 2025 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2025 | 6484-64-001RMC - A00215508 | Dallas Dallas |
Opaque Sealer Finish IH0035E WestIH0035E · Routine Maintenance Project - Sealed | $980,959 | $1,066,861 | ICOS MANAGEMENT, LLC | +8.8% | 2 |
| Jul 31, 2025 | 6484-63-001RMC - A00215507 | Dallas Dallas |
Opaque Sealer Finish IH0035E - EastIH0035E · Routine Maintenance Project - Sealed | $848,587 | $930,156 | ICOS MANAGEMENT, LLC | +9.6% | 2 |
| Jul 31, 2025 | 6488-17-001SUP - A00217059 | Travis Austin |
District HQ Window Washing FY26IH0035 · State Use Project | $4,920 | — | 0 | ||
| Jul 31, 2025 | 6488-56-001EMC - A00217140 | Kerr San Antonio |
FM 394 & FM 1338 Kerr Flood 2025FM0394 · Emergency Maintenance Project - Sealed | $1,284,271 | — | 0 | ||
| Jul 30, 2025 | 6486-34-001RMC - A00216253 | Angelina Lufkin |
2025-07 Crack Seal (North Counties)US0069 · Routine Maintenance Project | $713,567 | $830,189 | D & M CONTRACTORS, LLC | +16.3% | 4 |
| Jul 30, 2025 | 6480-14-001BPM - A00214051 | Houston Lufkin |
2025-06 BPM SouthSL0304 · Bridge Preventative Maintenance | $377,120 | $230,695 | SHALOM SERVICES CORPORATION | -38.8% | 8 |
| Jul 30, 2025 | 6486-94-001RMC - A00216492 | Shelby Lufkin |
2025-7 Shelby MBGFUS0096 · Routine Maintenance Project | $161,949 | $138,118 | AUSTIN BARRICADE COMPANY, L.L.C. | -14.7% | 4 |
| Jul 29, 2025 | 6484-46-001RMC - A00215466 | Lubbock Lubbock |
50th St and FM835 Decel Lane WideningFM 835 · Routine Maintenance Project - Sealed | $158,058 | $589,341 | LONE STAR DIRT & PAVING, LTD. | +272.9% | 1 |
| Jul 29, 2025 | 6478-47-001MMC - A00213359 | Waller Houston |
MMC 6478-47 EmulsionFM1488 · Material Maintenance Project | $255,600 | $258,420 | ERGON ASPHALT & EMULSIONS, INC. | +1.1% | 2 |
| Jul 29, 2025 | 6487-63-001SUP - A00216748 | Wichita Wichita Falls |
ELECTRA Janitorial & Grounds FY25-27US0287 · State Use Project | $77,302 | — | 0 | ||
| Jul 28, 2025 | 6489-21-001SUP - A00217328 | San Saba Brownwood |
SU LITTER- SAN SABA 2025US0190 · State Use Project | $45,718 | — | 0 | ||
| Jul 28, 2025 | 6488-28-001SUP - A00217088 | Henderson Tyler |
SUP - Henderson County Litter RemovalSH0019 · State Use Project | $211,499 | — | 0 | ||
| Jul 25, 2025 | 6478-03-001RMC - A00213189 | Cooke Wichita Falls |
FY25 Re-Stripe & RPM'sUS0082 · Routine Maintenance Project - Sealed | $958,755 | $577,562 | FLAT LINE, INC. | -39.8% | 7 |
| Jul 25, 2025 | 6480-74-001SUP - A00214271 | Montgomery Houston |
SUP 6480-74-001 Litter RemovalIH0045 · State Use Project | $894,774 | — | 0 | ||
| Jul 25, 2025 | 6488-61-001SUP - A00217155 | Sabine Lufkin |
2025-07 Sabine Grounds and PicnicFM0083 · State Use Project | $55,291 | — | 0 | ||
| Jul 24, 2025 | 6477-67-001RMC - A00213097 | Taylor Abilene |
Callout Thermoplastic StripingIH0020 · Routine Maintenance Project | $961,985 | $677,415 | FLAT LINE, INC. | -29.6% | 4 |
| Jul 24, 2025 | 6461-92-001RMC - A00206162 | Grayson Paris |
Full Depth Concrete US75 FY26US0075 · Routine Maintenance Project - Sealed | $751,000 | $496,711 | WINDING ROAD CONSTRUCTION, INC. | -33.9% | 4 |
| Jul 24, 2025 | 6486-03-001MMC - A00216185 | Brown Brownwood |
WINTER WEATHER (MAT ONLY) DISTRICT WIDEUS0183 · Material Maintenance Project | $372,726 | $461,525 | TOUCHSTONE RESOURCES, LLC | +23.8% | 1 |
| Jul 24, 2025 | 6470-92-001RMC - A00211370 | Johnson Fort Worth |
FY25 Tree Trimming and Brush RemovalFM0004 · Routine Maintenance Project - Sealed | $538,934 | $240,334 | AUSTIN BARRICADE COMPANY, L.L.C. | -55.4% | 8 |
| Jul 24, 2025 | 6487-58-001MMC - A00216735 | Brown Brownwood |
HOT-MIX COLD-LAID BROWN 2025 (MAT ONLY)US0377 · Material Maintenance Project | $233,600 | $240,000 | VALUE DRILLING COMPANY INC | +2.7% | 5 |
| Jul 24, 2025 | 6481-22-001BPM - A00214349 | Lamar Paris |
BPM Lamar FY26FM0137 · Bridge Preventative Maintenance - Sealed | $335,183 | $224,665 | BK FIELD OPERATIONS LLC | -33.0% | 4 |
| Jul 24, 2025 | 6484-13-001RMC - A00215396 | Lamar Paris |
Culvert ReplacementFM1500 · Routine Maintenance Project - Sealed | $258,093 | $223,063 | GARRET SHIELDS INFRASTRUCTURE | -13.6% | 1 |
| Jul 24, 2025 | 6481-21-001BPM - A00214348 | Hunt Paris |
BPM Hunt FY26IH0030 · Bridge Preventative Maintenance - Sealed | $325,575 | $209,178 | BK FIELD OPERATIONS LLC | -35.8% | 7 |
| Jul 24, 2025 | 6482-42-001RMC - A00214742 | Kimble San Angelo |
Non-Site Tree Trimming South FY 25US0377 · Routine Maintenance Project - Sealed | $350,388 | $126,660 | AUSTIN BARRICADE COMPANY, L.L.C. | -63.9% | 9 |
| Jul 23, 2025 | 6486-01-001MMC - A00216181 | Randall Amarillo |
FY 26 Amarillo Area HMACIH0027 · Material Maintenance Project | $625,000 | $625,000 | RK HALL, LLC | 0.0% | 2 |
| Jul 23, 2025 | 6486-39-001RMC - A00216260 | San Jacinto Lufkin |
2026-07 San Jacinto Crack Seal (South)US0059 · Routine Maintenance Project - Sealed | $425,778 | $427,929 | D & M CONTRACTORS, LLC | +0.5% | 4 |
| Jul 23, 2025 | 6484-43-001RMC - A00215461 | Potter Amarillo |
Traffic Control FY 26IH0040 · Routine Maintenance Project - Sealed | $556,680 | $388,185 | BARRICADES UNLIMITED | -30.3% | 2 |
| Jul 23, 2025 | 6487-09-001MMC - A00216518 | Potter Amarillo |
FY 26 AMA Hydraulic CementIH0040 · Material Maintenance Project | $392,900 | $358,401 | AKA-MATERIALS | -8.8% | 2 |
| Jul 23, 2025 | 6486-25-001RMC - A00216240 | Angelina Lufkin |
2025-08 ANGELINA MBGFUS0059 · Routine Maintenance Project - Sealed | $282,300 | $293,167 | RHINO EQUITY, LLC | +3.8% | 3 |
| Jul 23, 2025 | 6462-73-001RMC - A00206740 | Bexar San Antonio |
FY2026 CULVERT REPLACEMENT SASHMR0681 · Routine Maintenance Project - Sealed | $100,507 | $98,815 | GARRET SHIELDS INFRASTRUCTURE | -1.7% | 3 |
| Jul 23, 2025 | 6481-09-001BPM - A00214336 | Bexar San Antonio |
FY2026 IH 410 WBFR AT DRAINIH0410 · Bridge Preventative Maintenance - Sealed | $44,120 | $35,566 | BK FIELD OPERATIONS LLC | -19.4% | 3 |
| Jul 23, 2025 | 6489-27-001SUP - A00217345 | Washington Bryan |
FY25 Washington Picnic Area MaintenanceSH0105 · State Use Project | $84,700 | — | 0 | ||
| Jul 23, 2025 | 6479-93-001SUP - A00213971 | Hidalgo Pharr |
6479-93-001 Grounds MaintenanceIH0069C · State Use Project | $69,396 | — | 0 | ||
| Jul 23, 2025 | 6479-88-001SUP - A00213965 | Starr Pharr |
6479-88-001 Janitorial MNT (Roma/Hebb)US0083 · State Use Project | $94,620 | — | 0 | ||
| Jul 23, 2025 | 6488-67-001SUP - A00217172 | Randall Amarillo |
Janitorial Canyon Maintenance Office FYUS0060 · State Use Project | $15,073 | — | 0 | ||
| Jul 22, 2025 | 6483-51-001RMC - A00215117 | Chambers Beaumont |
FY 26 FDCRIH0010 · Routine Maintenance Project - Sealed | $776,468 | $1,042,037 | GARRET SHIELDS INFRASTRUCTURE | +34.2% | 2 |
| Jul 22, 2025 | 6484-77-001RMC - A00215571 | Hidalgo Pharr |
6484-77-001 FM Mowing (Hidalgo)SH0495 · Routine Maintenance Project - Sealed | $895,298 | $817,470 | R&M INCORPORATED | -8.7% | 4 |
| Jul 22, 2025 | 6468-61-001RMC - A00210170 | Tom Green San Angelo |
Tree Trimming North FY 25SH0208 · Routine Maintenance Project - Sealed | $246,591 | $101,768 | AUSTIN BARRICADE COMPANY, L.L.C. | -58.7% | 9 |
| Jul 21, 2025 | 6488-76-001EMC - A00217190 | Kerr San Antonio |
SL 98 and FM 1350 Kerr Flood 2025FM1350 · Emergency Maintenance Project - Sealed | $444,840 | — | 0 | ||
| Jul 21, 2025 | 6488-77-001SUP - A00217195 | Hardin Beaumont |
KOUNTZE HIKE AND BIKE TRAIL MAINTENANCEUS0069 · State Use Project | $16,508 | — | 0 | ||
| Jul 21, 2025 | 6488-78-001SUP - A00217196 | Orange Beaumont |
ORANGE LITTER BARREL MAINTENANCESH0012 · State Use Project | $10,544 | — | 0 | ||
| Jul 21, 2025 | 6488-79-001SUP - A00217198 | Jefferson Beaumont |
BMT DISTRICT JANITORIALUS0069 · State Use Project | $101,113 | — | 0 | ||
| Jul 21, 2025 | 6488-80-001SUP - A00217201 | Newton Beaumont |
NEWTON LITTER MNTSH0087 · State Use Project | $104,249 | — | 0 | ||
| Jul 21, 2025 | 6488-82-001SUP - A00217204 | Liberty Beaumont |
LIBERTY MO/AO JANITORIAL MAINT.US0090 · State Use Project | $27,171 | — | 0 | ||
| Jul 21, 2025 | 6488-83-001SUP - A00217205 | Orange Beaumont |
ORANGE LITTER MAINTENANCESH0062 · State Use Project | $176,606 | — | 0 | ||
| Jul 21, 2025 | 6488-65-001SUP - A00217167 | Newton Beaumont |
DEWEYVILLE PARKS MAINTENANCESH0012 · State Use Project | $20,301 | — | 0 | ||
| Jul 18, 2025 | 6476-50-001RMC - A00212820 | Jackson Yoakum |
Ditch Cleaning FY 25US0059 · Routine Maintenance Project | $121,915 | $96,926 | AUSTIN BARRICADE COMPANY, L.L.C. | -20.5% | 5 |
| Jul 18, 2025 | 6488-15-001ER 2B25(193) | Travis Austin |
FY25 EMC at Cow Creek CrossingRM1431 · Emergency Maintenance Project - Sealed | $4,030,543 | — | 0 | ||
| Jul 17, 2025 | 6487-79-001EMC - A00216781 | Tarrant Fort Worth |
Emergency Bridge Repair - Tarrant CountyIH0030 · Emergency Maintenance Project - Sealed | $1,199,133 | — | 0 | ||
| Jul 17, 2025 | 6488-55-001EMC - A00217139 | Kerr San Antonio |
SH 39 Kerr Flood 2025SH0039 · Emergency Maintenance Project - Sealed | $10,455,604 | — | 0 | ||
| Jul 17, 2025 | 6486-86-001SUP - A00216467 | Red River Paris |
Grounds Maintenance - Red River FY25US0082 · State Use Project | $7,845 | — | 0 | ||
| Jul 15, 2025 | 6483-36-001RMC - A00215084 | Fort Bend Houston |
RMC 6483-36-001US0059 · Routine Maintenance Project | $652,800 | $1,130,160 | ISI CONTRACTING, INC. | +73.1% | 2 |
| Jul 15, 2025 | 6486-60-001RMC - A00216384 | San Patricio Corpus Christi |
6486-60-001 Mowing (San Patricio)IH0037 · Routine Maintenance Project - Sealed | $577,427 | $503,440 | R&M INCORPORATED | -12.8% | 4 |
| Jul 15, 2025 | 6485-78-001MMC - A00216076 | Karnes Corpus Christi |
6485-78-001 Aggregate Karnes AreaUS0181 · Material Maintenance Project | $488,000 | $480,500 | BRAUNTEX MATERIALS, INC. | -1.5% | 4 |
| Jul 15, 2025 | 6481-41-001RMC - A00214396 | Waller Houston |
RMC 6481-41-001US0290 · Routine Maintenance Project - Sealed | $640,460 | $480,471 | THE CONFIDENCE GROUP, INC | -25.0% | 4 |
| Jul 15, 2025 | 6485-80-001MMC - A00216078 | San Patricio Corpus Christi |
6485-80-001 Flex Base Sinton MaintUS0181 · Material Maintenance Project | $450,500 | $337,195 | MARTIN MARIETTA MATERIALS, INC. | -25.2% | 4 |
| Jul 15, 2025 | 6481-58-001RMC - A00214429 | Karnes Corpus Christi |
FY2026 KAO Crack SealSH0123 · Routine Maintenance Project - Sealed | $272,463 | $333,539 | D & M CONTRACTORS, LLC | +22.4% | 3 |
| Jul 15, 2025 | 6481-56-001RMC - A00214427 | Live Oak Corpus Christi |
FY2026 AAO Crack SealUS0281 · Routine Maintenance Project - Sealed | $284,513 | $312,800 | FYL ENTERPRISES, LLC | +9.9% | 3 |
| Jul 15, 2025 | 6485-79-001MMC - A00216077 | Karnes Corpus Christi |
6485-79-001 HMCL Karnes Maint.US0181 · Material Maintenance Project | $277,800 | $279,000 | BRAUNTEX MATERIALS, INC. | +0.4% | 3 |
| Jul 15, 2025 | 6485-81-001MMC - A00216088 | Karnes Corpus Christi |
6485-81-001 Flex Base Karnes MaintUS0181 · Material Maintenance Project | $165,000 | $154,300 | COLORADO MATERIALS, LTD. | -6.5% | 5 |
| Jul 15, 2025 | 6488-25-001EMC - A00217072 | Kerr San Antonio |
FM 1340 Kerr Flood 2025FM1340 · Emergency Maintenance Project - Sealed | $865,020 | — | 0 | ||
| Jul 14, 2025 | 6485-11-001RMC - A00215824 | Freestone Bryan |
FY26 - Freestone/Leon Tree RemovalSH0075 · Routine Maintenance Project | $237,900 | $183,754 | RHINO EQUITY, LLC | -22.8% | 7 |
| Jul 14, 2025 | 6485-55-001SUP - A00215980 | Calhoun Yoakum |
Janitorial Calhoun CountySH0035 · State Use Project | $37,131 | — | 0 | ||
| Jul 14, 2025 | 6486-72-001SUP - A00216400 | Franklin Paris |
Janitorial - Franklin FY2025SH0037 · State Use Project | $18,174 | — | 0 | ||
| Jul 14, 2025 | 6486-85-001SUP - A00216464 | Rains Paris |
Grounds Maintenance - Rains FY25US0069 · State Use Project | $12,940 | — | 0 | ||
| Jul 11, 2025 | 6487-13-001SUP - A00216522 | Parker Fort Worth |
FY2026 - Parker/Palo Pinto PicnicsIH0020 · State Use Project | $253,683 | — | 0 | ||
| Jul 11, 2025 | 6486-27-001SUP - A00216244 | Montgomery Houston |
Janitorial Maintenance 6486-27-001FM3083 · State Use Project | $76,510 | — | 0 | ||
| Jul 10, 2025 | 6485-88-001RMC - A00216138 | Webb Laredo |
Webb County Concrete TurnaroundIH0035 · Routine Maintenance Project - Sealed | $949,675 | $1,340,905 | J. CARROLL WEAVER, INC. | +41.2% | 1 |
| Jul 9, 2025 | 6481-81-001RMC - A00214576 | Denton Dallas |
Attenuators Denton Co FY 26IH0035W · Routine Maintenance Project - Sealed | $717,750 | $506,220 | FIREMAN EXCAVATING, INC. | -29.5% | 6 |
| Jul 9, 2025 | 6479-05-001RMC - A00213803 | Denton Dallas |
MBGF Repairs Denton FY 26IH0035W · Routine Maintenance Project - Sealed | $926,030 | $488,902 | ROSS SA ENTERPRISE LLC | -47.2% | 6 |
| Jul 9, 2025 | 6483-80-001RMC - A00215292 | Dallas Dallas |
Lrg Guide Sign IH30 2025IH0030 · Routine Maintenance Project - Sealed | $663,421 | $485,525 | SYNERGY SIGNS & SERVICES LLC | -26.8% | 6 |
| Jul 9, 2025 | 6484-68-001RMC - A00215529 | Dallas Dallas |
Large Sign Replace 63 0725IH0030 · Routine Maintenance Project - Sealed | $600,319 | $450,404 | SYNERGY SIGNS & SERVICES LLC | -25.0% | 6 |
| Jul 9, 2025 | 6482-04-001RMC - A00214635 | Collin Dallas |
FPSR 07 0725FM0545 · Routine Maintenance Project - Sealed | $474,864 | $441,920 | JAGOE-PUBLIC COMPANY | -6.9% | 3 |
| Jul 9, 2025 | 6480-13-001BPM - A00214050 | San Augustine Lufkin |
2025-06 BPM NorthSH0021 · Bridge Preventative Maintenance | $518,760 | $425,610 | ACE CONTRACTORS, INC. | -18.0% | 2 |
| Jul 9, 2025 | 6486-09-001MMC - A00216197 | Robertson Bryan |
FY25 Robertson HMA - 07SH0006 · Material Maintenance Project | $435,000 | $411,000 | BIG CREEK CONSTRUCTION, LTD. | -5.5% | 4 |
| Jul 9, 2025 | 6480-37-001BPM - A00214129 | Freestone Bryan |
FY25 - Freestone IH45 SouthIH0045 · Bridge Preventative Maintenance - Sealed | $451,815 | $405,447 | CROSS PLUS CONSTRUCTION, LLC | -10.3% | 6 |
| Jul 9, 2025 | 6478-73-001RMC - A00213487 | Collin Dallas |
Crash Cushion Attenuator Repair 07 0425US0075 · Routine Maintenance Project - Sealed | $596,500 | $353,325 | FIREMAN EXCAVATING, INC. | -40.8% | 5 |
| Jul 9, 2025 | 6486-35-001RMC - A00216255 | Brown Brownwood |
ROADSIDE MOWING (CALL-OUT) BROWN 2025US0183 · Routine Maintenance Project | $408,600 | $340,500 | T&L CLEANING SERVICES LLC | -16.7% | 2 |
| Jul 9, 2025 | 6482-01-001RMC - A00214632 | Kaufman Dallas |
Attenuator Repair FY '25IH0020 · Routine Maintenance Project - Sealed | $923,560 | $306,115 | FIREMAN EXCAVATING, INC. | -66.9% | 3 |
| Jul 9, 2025 | 6485-85-001MMC - A00216117 | Brazos Bryan |
FY25 Bulk Salt Bryan AO - 07SH0006 · Material Maintenance Project | $303,920 | $284,179 | NSG LOGISTICS, LLC | -6.5% | 1 |
| Jul 9, 2025 | 6468-32-001RMC - A00210116 | Williamson Austin |
FY25 Georgetown Crack SealUS0079 · Routine Maintenance Project - Sealed | $255,169 | $265,381 | FYL ENTERPRISES, LLC | +4.0% | 3 |
| Jul 9, 2025 | 6468-34-001RMC - A00210118 | Burnet Austin |
FY 25 Burnet Crack SealUS0281 · Routine Maintenance Project - Sealed | $317,756 | $235,391 | FYL ENTERPRISES, LLC | -25.9% | 4 |
| Jul 9, 2025 | 6468-33-001RMC - A00210117 | Bastrop Austin |
FY 25 Bastrop Crack SealUS0290 · Routine Maintenance Project - Sealed | $209,706 | $214,797 | FYL ENTERPRISES, LLC | +2.4% | 3 |
| Jul 9, 2025 | 6471-92-001BPM - A00211700 | Collin Dallas |
Bridge Joint Cleaning Sealing 07 0725US0075 · Bridge Preventative Maintenance - Sealed | $227,906 | $199,431 | ROAD DOCTORS LLC | -12.5% | 6 |
| Jul 9, 2025 | 6468-38-001RMC - A00210122 | Hays Austin |
FY25 Hays Crack SealFM2001 · Routine Maintenance Project - Sealed | $174,787 | $176,920 | FYL ENTERPRISES, LLC | +1.2% | 3 |
| Jul 9, 2025 | 6483-26-001RMC - A00215040 | Orange Beaumont |
FY 25 Culvert CleaningIH0010 · Routine Maintenance Project | $269,350 | $161,120 | XTREME PRO CLEANING LLC | -40.2% | 4 |
| Jul 9, 2025 | 6484-99-001MMC - A00215735 | Kaufman Dallas |
FLEX BASE (Material Only) 06 0925FM2728 · Material Maintenance Project | $108,750 | $117,813 | KNIFE RIVER CORPORATION - SOUTH | +8.3% | 5 |
| Jul 9, 2025 | 6480-92-001RMC - A00214300 | Navarro Dallas |
Tree Trimming and Brush Removal 01 0709FM0667 · Routine Maintenance Project - Sealed | $151,676 | $103,008 | AUSTIN BARRICADE COMPANY, L.L.C. | -32.1% | 11 |
| Jul 9, 2025 | 6481-20-001RMC - A00214347 | Williamson Austin |
FY 25 Georgetown Tree and Brush RemovalFM0112 · Routine Maintenance Project - Sealed | $186,862 | $93,836 | LOOKS GREAT SERVICES OF MS, INC. | -49.8% | 7 |
| Jul 9, 2025 | 6479-06-001RMC - A00213804 | Denton Dallas |
Tree/Brush Removal/Trimming 04 0725FM0156 · Routine Maintenance Project - Sealed | $99,400 | $76,625 | ALLIES LAND CLEARING | -22.9% | 11 |
| Jul 9, 2025 | 6485-00-001MMC - A00215736 | Kaufman Dallas |
Lime (Material Only) 06 0725FM2728 · Material Maintenance Project | $13,500 | $17,000 | TOUCHSTONE RESOURCES, LLC | +25.9% | 1 |
| Jul 8, 2025 | 6485-92-001RMC - A00216167 | Henderson Tyler |
Henderson & Anderson Guardrail CalloutSH0019 · Routine Maintenance Project - Sealed | $683,580 | $573,272 | BK FIELD OPERATIONS LLC | -16.1% | 3 |
| Jul 8, 2025 | 6486-12-001MMC - A00216200 | Burleson Bryan |
FY25 Burleson HMA - 07SH0036 · Material Maintenance Project | $317,000 | $292,200 | BRAZOS PAVING, INC. | -7.8% | 3 |
| Jul 8, 2025 | 6480-64-001RMC - A00214225 | Tom Green San Angelo |
Mowing - Tom Green (Urban) FY 26SH0208 · Routine Maintenance Project - Sealed | $283,019 | $241,395 | SKYLINE CONSTRUCTION PAVING & STRIPING | -14.7% | 4 |
| Jul 8, 2025 | 6485-84-001MMC - A00216116 | Brazos Bryan |
FY25 Hydraulic Cement Bryan AO - 07SH0006 · Material Maintenance Project | $245,508 | $238,320 | TOUCHSTONE RESOURCES, LLC | -2.9% | 2 |
| Jul 8, 2025 | 6479-83-001BPM - A00213950 | Freestone Bryan |
FY25 - Freestone US84 - 07US0084 · Bridge Preventative Maintenance - Sealed | $279,223 | $194,064 | BK FIELD OPERATIONS LLC | -30.5% | 7 |
| Jul 8, 2025 | 6485-25-001MMC - A00215846 | Midland Odessa |
6485-25-001 AggregateIH0020 · Material Maintenance Project | $52,500 | $41,795 | SOUTHERN SOURCING SOLUTIONS, LLC | -20.4% | 5 |
| Jul 8, 2025 | 6486-18-001MMC - A00216223 | Pecos Odessa |
6486-18-001 AggregateBI0010G · Material Maintenance Project | $40,250 | $23,967 | SOUTHERN SOURCING SOLUTIONS, LLC | -40.5% | 5 |
| Jul 8, 2025 | 6486-17-001MMC - A00216222 | Ector Odessa |
6486-17-001 AggregateSL0338 · Material Maintenance Project | $35,000 | $21,645 | SOUTHERN SOURCING SOLUTIONS, LLC | -38.2% | 5 |
| Jul 3, 2025 | 6481-43-001RMC - A00214399 | El Paso El Paso |
Cleaning & SweepingIH0010 · Routine Maintenance Project - Sealed | $439,940 | $355,000 | AIMS COMPANIES | -19.3% | 2 |
1–100 of 220Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.