261Let jobs
$1,415,162,547Total low bids
$1,426,883,915Total estimates
-0.8%Low bids vs estimates
Aug 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 5, 2021 | 0120-03-031F 2021(784) | Bosque Waco |
REHABILITATE EXISTING ROADWAYSH 22 · | $11,178,328 | $9,797,443 | TEXAS MATERIALS GROUP, INC. | -12.4% | 4 |
| Aug 5, 2021 | 1685-05-116C 1685-5-116 | Harris Houston |
SURFACING/ROADWAY RESTORATIONSH 6 · | $9,294,018 | $8,982,211 | DURWOOD GREENE CONSTRUCTION CO. | -3.4% | 3 |
| Aug 5, 2021 | 0015-13-419F 2021(801) | Travis Austin |
PREVENTIVE MAINTENANCEIH 35 · | $8,604,853 | $8,677,684 | TEXAS MATERIALS GROUP, INC. | +0.8% | 3 |
| Aug 5, 2021 | 0472-01-044C 472-1-44 | Bastrop Austin |
PREVENTIVE MAINTENANCESH 21 · | $8,558,610 | $8,458,636 | BIG CREEK CONSTRUCTION, LTD. | -1.2% | 4 |
| Aug 5, 2021 | 2562-01-023STP 2021(466)HES | Orange Beaumont |
CONSTRUCT NEW ROADFM 1442 · | $5,792,460 | $7,694,480 | TEXAS MATERIALS GROUP, INC. | +32.8% | 2 |
| Aug 5, 2021 | 0200-15-026F 2021(472) | Jefferson Beaumont |
SURFACING / ROADWAYUS 69 · | $7,169,144 | $7,063,406 | TEXAS MATERIALS GROUP, INC. | -1.5% | 1 |
| Aug 5, 2021 | 0068-08-067F 2021(846) | Howard Abilene |
REHABILITATE EXISTING ROADWAYUS 87 · | $7,292,456 | $6,899,250 | RK HALL, LLC | -5.4% | 6 |
| Aug 5, 2021 | 1776-01-036STP 2021(808)HES | Hays Austin |
HAZARD ELIMINATION & SAFETYRM 967 · | $6,740,121 | $6,598,036 | HUNTER INDUSTRIES, LTD. | -2.1% | 4 |
| Aug 5, 2021 | 6385-36-001RMC - 638536001 | Nueces Corpus Christi |
DRY DOCKING FERRY BOATSSH 361 · | $7,033,935 | $5,997,660 | PALACIOS SHIPYARD, INC. | -14.7% | 3 |
| Aug 5, 2021 | 0118-04-032F 2021(822) | Cherokee Tyler |
SURFACING/ROADWAY RESTORATIONSH 21 · | $6,306,254 | $5,923,689 | A. L. HELMCAMP, INC. | -6.1% | 6 |
| Aug 5, 2021 | 0233-02-035F 2021(690) | Culberson El Paso |
HAZARD ELIMINATION & SAFETYUS 62 · | $5,712,788 | $5,832,744 | LESNA CONSTRUCTION, INC. | +2.1% | 4 |
| Aug 5, 2021 | 0921-02-465C 921-2-465 | Hidalgo Pharr |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONCR · | $6,192,871 | $5,092,399 | TRAF-TEX, INC. | -17.8% | 4 |
| Aug 5, 2021 | 0148-03-027STP 2021(814)HES | Kimble San Angelo |
HAZARD ELIMINATION & SAFETYUS 377 · | $4,163,576 | $4,904,926 | 3LW CIVIL LLC | +17.8% | 4 |
| Aug 5, 2021 | 0904-00-197F 2021(874) | Potter Amarillo |
HIGHWAY IMPROVEMENTVA · | $6,057,309 | $4,796,527 | MASSANA CONSTRUCTION INC. | -20.8% | 6 |
| Aug 5, 2021 | 1875-02-027F 2021(828) | Houston Lufkin |
WIDEN ROAD - ADD SHOULDERSFM 2022 · | $4,806,558 | $4,532,080 | PINTO CONSTRUCTION CO., INC. | -5.7% | 4 |
| Aug 5, 2021 | 1090-04-016F 2021(773) | Jackson Yoakum |
ACP OVERLAY, WIDEN/ADD TURN LANES, INSTALL SIGNALFM 1593 · | $3,880,529 | $4,530,159 | HUNTER INDUSTRIES, LTD. | +16.7% | 1 |
| Aug 5, 2021 | 1753-01-017BR 2021(807) | Mason Austin |
BRIDGE REPLACEMENTRM 1871 · | $4,049,062 | $4,178,807 | RELMCO, INC. | +3.2% | 3 |
| Aug 5, 2021 | 2270-01-023F 2021(853) | Taylor Abilene |
PREVENTIVE MAINTENANCEFM 3438 · | $4,407,224 | $4,152,368 | J. H. STRAIN & SONS, INC. | -5.8% | 4 |
| Aug 5, 2021 | 0911-00-106C 911-00-106 | Angelina Lufkin |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $3,924,945 | $4,121,119 | HIGHWAY 19 CONSTRUCTION LLC | +5.0% | 4 |
| Aug 5, 2021 | 0134-02-059STP 2021(868)HES | Young Wichita Falls |
HAZARD ELIMINATION & SAFETYUS 380 · | $4,359,387 | $4,045,567 | ZACK BURKETT CO. | -7.2% | 4 |
| Aug 5, 2021 | 0027-04-042STP 2021(545)HES | Wharton Yoakum |
SAFETY TREAT FIXED OBJECTSUS 90A · | $3,829,053 | $3,775,419 | SJ&J CONSTRUCTION, LLC | -1.4% | 4 |
| Aug 5, 2021 | 0168-07-047F 2021(869) | Deaf Smith Amarillo |
HIGHWAY IMPROVEMENTUS 60 · | $2,808,460 | $3,689,715 | J. LEE MILLIGAN, INC. | +31.4% | 2 |
| Aug 5, 2021 | 2941-02-062CM 2021(842) | Harris Houston |
INSTALL RAISED MEDIANFM 2920 · | $4,170,229 | $3,615,523 | MBN ENTERPRISES LLC | -13.3% | 4 |
| Aug 5, 2021 | 0924-00-147F 2021(909) | El Paso El Paso |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONVA · | $3,811,438 | $3,567,302 | TRI STATE ELECTRIC, LTD. | -6.4% | 1 |
| Aug 5, 2021 | 0902-00-204F 2021(866) | Tarrant Fort Worth |
REHABILITATE EXISTING ROADWAYVA · | $3,370,200 | $3,553,920 | O. TREVINO CONSTRUCTION, LLC | +5.5% | 2 |
| Aug 5, 2021 | 0010-12-074F 2021(829) | Bowie Atlanta |
PROFILE EDGELINE AND CENTERLINE MARKINGSUS 67 · | $3,871,560 | $3,499,747 | STRIPE-A-ZONE, INC. | -9.6% | 4 |
| Aug 5, 2021 | 2121-04-120F 2021(799) | El Paso El Paso |
INSTALL ILLUMINATIONIH 10 · | $2,929,577 | $3,267,441 | TRI STATE ELECTRIC, LTD. | +11.5% | 1 |
| Aug 5, 2021 | 0224-03-060F 2021(872) | Montague Wichita Falls |
SURFACING/ROADWAY RESTORATIONUS 287 · | $3,227,338 | $3,203,181 | JAGOE-PUBLIC COMPANY | -0.7% | 4 |
| Aug 5, 2021 | 0024-07-063F 2021(778) | Bexar San Antonio |
INTERSECTION IMPROVEMENTUS 90 · | $2,508,773 | $2,885,971 | DAN WILLIAMS COMPANY | +15.0% | 11 |
| Aug 5, 2021 | 0018-04-064F 2021(882) | Webb Laredo |
REPLACEMENT OF BRIDGE RAILIH 35 · | $2,450,473 | $2,622,757 | SJ&J CONSTRUCTION, LLC | +7.0% | 4 |
| Aug 5, 2021 | 0617-01-205F 2021(878) | Nueces Corpus Christi |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESH 358 · | $2,939,378 | $2,547,785 | TI-ZACK CONCRETE, INC. | -13.3% | 6 |
| Aug 5, 2021 | 0606-01-007C 606-1-7 | Smith Tyler |
STATE PARK IMPROVEMENTSPR 16 · | $2,289,001 | $2,399,846 | ENCINO LANDSCAPE, INC. | +4.8% | 8 |
| Aug 5, 2021 | 1257-01-053F 2021(447) | Fort Bend Houston |
INSTALL RAISED MEDIANFM 1092 · | $2,675,945 | $2,396,294 | SCR CIVIL CONSTRUCTION, LLC | -10.5% | 3 |
| Aug 5, 2021 | 0902-90-105C 902-90-105 | Tarrant Fort Worth |
INSTALL ILLUMINATIONVA · | $1,852,646 | $2,216,192 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | +19.6% | 1 |
| Aug 5, 2021 | 0901-00-056F 2021(794) | Lamar Paris |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $2,467,501 | $2,201,904 | HIGHWAY 19 CONSTRUCTION LLC | -10.8% | 5 |
| Aug 5, 2021 | 0197-02-132F 2021(907) | Dallas Dallas |
HAZARD ELIMINATION & SAFETYUS 175 · | $2,092,225 | $2,151,210 | GIBSON & ASSOCIATES, INC. | +2.8% | 5 |
| Aug 5, 2021 | 0035-05-061BR 2021(816) | Menard San Angelo |
BRIDGE MAINTENANCEUS 83 · | $2,708,138 | $2,146,115 | RELMCO, INC. | -20.8% | 6 |
| Aug 5, 2021 | 2552-03-059F 2021(800) | El Paso El Paso |
SURFACING/ROADWAY RESTORATIONSL 375 · | $2,635,073 | $1,991,402 | J.D. ABRAMS, L.P. | -24.4% | 6 |
| Aug 5, 2021 | 0916-00-217C 916-00-217 | Nueces Corpus Christi |
HIGHWAY IMPROVEMENTVA · | $2,638,301 | $1,880,179 | PMI PAVEMENT MARKING, LLC | -28.7% | 6 |
| Aug 5, 2021 | 0017-08-111F 2021(881) | La Salle Laredo |
CONSTRUCT RAMPSIH 35 · | $1,806,867 | $1,809,941 | TEXAS MATERIALS GROUP, INC. | +0.2% | 4 |
| Aug 5, 2021 | 6383-18-001RMC - 638318001 | Harris Houston |
METAL BEAM GUARD FENCE REPAIRSH 249 · | $1,812,292 | $1,738,245 | DBI SERVICES, LLC | -4.1% | 3 |
| Aug 5, 2021 | 0092-14-099F 2021(905) | Dallas Dallas |
HAZARD ELIMINATION & SAFETYIH 45 · | $1,762,096 | $1,659,487 | EMERY SAPP & SON'S INC. | -5.8% | 7 |
| Aug 5, 2021 | 0913-00-114F 2021(772) | De Witt Yoakum |
TRAFFIC SIGNAL CABINET AND EQUIPMENT INSTALLATIONVA · | $2,014,500 | $1,652,900 | THIRD COAST SERVICES LLC | -17.9% | 5 |
| Aug 5, 2021 | 0186-06-091C 186-6-91 | Washington Bryan |
INSTALL TRAFFIC SIGNALUS 290 · | $1,579,849 | $1,649,907 | LARRY YOUNG PAVING, INC. | +4.4% | 2 |
| Aug 5, 2021 | 0049-14-014F 2021(768) | Robertson Bryan |
PROFILE MARKINGSFM 46 · | $2,733,667 | $1,534,451 | PMI PAVEMENT MARKING, LLC | -43.9% | 9 |
| Aug 5, 2021 | 0918-47-247STP 2021(611)HES | Dallas Dallas |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $1,316,927 | $1,374,730 | ROADWAY SOLUTIONS, INC. | +4.4% | 3 |
| Aug 5, 2021 | 6383-53-001RMC - 638353001 | San Patricio Corpus Christi |
REHABILITATION OF EXISTING ROADWAYIH 37 · | $1,731,086 | $1,301,899 | J. CARROLL WEAVER, INC. | -24.8% | 8 |
| Aug 5, 2021 | 0114-09-089F 2021(776) | Washington Bryan |
INSTALL FLASHING BEACONUS 290 · | $1,410,020 | $1,254,828 | CITYLYNX, INC. | -11.0% | 3 |
| Aug 5, 2021 | 0902-38-129BR 2019(266) | Parker Fort Worth |
BRIDGE REPLACEMENTCS · | $804,134 | $919,705 | ED BELL CONSTRUCTION COMPANY | +14.4% | 4 |
| Aug 5, 2021 | 6378-75-001RMC - 637875001 | Wichita Wichita Falls |
FULL DEPTH CONCRETE REPAIRUS 82 · | $920,130 | $857,850 | O. TREVINO CONSTRUCTION, LLC | -6.8% | 4 |
| Aug 5, 2021 | 0593-01-130STP 2021(532)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYSH 105 · | $730,539 | $856,007 | TEXAS MATERIALS GROUP, INC. | +17.2% | 1 |
| Aug 5, 2021 | 0079-03-051F 2021(766) | Comanche Brownwood |
INTERSECTION IMPROVEMENTUS 67 · | $872,673 | $850,895 | JAY MILLS CONTRACTING, INCORPORATED | -2.5% | 2 |
| Aug 5, 2021 | 6385-98-001RMC - 638598001 | Scurry Abilene |
CRACK SEALUS 84 · | $935,961 | $778,357 | D & M CONTRACTORS, LLC | -16.8% | 4 |
| Aug 5, 2021 | 6380-94-001RMC - 638094001 | Dallas Dallas |
TRAFFIC CONTROL SERVICESIH 35E · | $653,250 | $751,000 | STATEWIDE SAFETY SYSTEMS | +15.0% | 4 |
| Aug 5, 2021 | 6383-12-001RMC - 638312001 | Dallas Dallas |
REPAIR/REPLACE CONCRETE BARRIERSL 12 · | $934,250 | $696,400 | GIBSON & ASSOCIATES, INC. | -25.5% | 6 |
| Aug 5, 2021 | 6378-59-001RMC - 637859001 | Montague Wichita Falls |
CULVERT REPLACEMENTFM 1749 · | $580,503 | $600,994 | TALBRAN ENTERPRISES LLC | +3.5% | 3 |
| Aug 5, 2021 | 0912-72-352BR 2019(251) | Harris Houston |
REPLACE BRIDGE AND APPROACHESCS · | $509,882 | $599,801 | ARANDA BROTHERS CONSTRUCTION CO., INC. | +17.6% | 2 |
| Aug 5, 2021 | 2574-01-049F 2021(716) | Tom Green San Angelo |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $373,364 | $538,601 | TI-ZACK CONCRETE, INC. | +44.3% | 1 |
| Aug 5, 2021 | 0014-01-025STP 2021(636)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALBU 287P · | $501,217 | $524,000 | DURABLE SPECIALTIES, INC. | +4.5% | 3 |
| Aug 5, 2021 | 6377-87-001RMC - 637787001 | Coryell Waco |
CULVERT REPAIRFM 185 · | $482,593 | $486,782 | CROSS PLUS CONSTRUCTION, LLC | +0.9% | 3 |
| Aug 5, 2021 | 6383-74-001RMC - 638374001 | Smith Tyler |
CRACK SEALUS 69 · | $480,588 | $452,694 | CRACKSEAL OF TEXAS, LLC | -5.8% | 4 |
| Aug 5, 2021 | 0916-00-241F 2021(922) | Nueces Corpus Christi |
LANDSCAPE DEVELOPMENTVA · | $313,266 | $384,164 | TIGHT LINE CONSTRUCTION, LLC | +22.6% | 1 |
| Aug 5, 2021 | 6383-30-001MMC - 638330001 | Hopkins Paris |
LIMESTONE ROCK AND ASPHALTSH 11 · | $366,000 | $380,715 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.0% | 1 |
| Aug 5, 2021 | 6379-39-001RMC - 637939001 | Navarro Dallas |
CULVERT EXTENSION & CROSS DRAINAGEFM 1838 · | $301,889 | $371,146 | TALBRAN ENTERPRISES LLC | +22.9% | 4 |
| Aug 5, 2021 | 6384-28-001RMC - 638428001 | Hill Waco |
CRACK SEALFM 934 · | $494,865 | $366,958 | D & M CONTRACTORS, LLC | -25.8% | 4 |
| Aug 5, 2021 | 6381-46-001RMC - 638146001 | Brazoria Houston |
METAL BEAM GUARD FENCE REPAIRSH 288 · | $351,870 | $354,298 | ISI CONTRACTING, INC. | +0.7% | 3 |
| Aug 5, 2021 | 0157-09-005F 2021(847) | Haskell Abilene |
INSTALL FLASHING BEACONUS 277 · | $301,070 | $348,082 | WILLIS ELECTRIC CO., LP | +15.6% | 1 |
| Aug 5, 2021 | 6384-36-001RMC - 638436001 | Potter Amarillo |
CABLE MEDIAN BARRIER SYSTEM REPAIRIH 40 · | $351,750 | $335,300 | E.V.G. ENTERPRISE | -4.7% | 3 |
| Aug 5, 2021 | 6381-58-001MMC - 638158001 | Grayson Paris |
LIMESTONE ROCK AND ASPHALTUS 75 · | $312,500 | $317,075 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.5% | 1 |
| Aug 5, 2021 | 0542-01-097F 2021(885) | Webb Laredo |
INSTALL TRAFFIC SIGNAL AND RAISED MEDIANBU 59-Z · | $368,773 | $306,767 | TRIPLE H FIELD SERVICES, LLC | -16.8% | 3 |
| Aug 5, 2021 | 6381-57-001MMC - 638157001 | Hunt Paris |
LIMESTONE ROCK AND ASPHALTIH 30 · | $305,000 | $305,100 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.0% | 1 |
| Aug 5, 2021 | 6386-40-001RMC - 638640001 | Nueces Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYIH 37 · | $262,163 | $304,025 | R&M INCORPORATED | +16.0% | 1 |
| Aug 5, 2021 | 0833-03-051STP 2021(785)HES | McLennan Waco |
INSTALL TRAFFIC SIGNAL AND CURB RAMPSFM 1637 · | $174,957 | $206,817 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +18.2% | 2 |
| Aug 5, 2021 | 0917-00-051C 917-00-51 | Brazos Bryan |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONVA · | $230,300 | $183,906 | TRAF-TEX, INC. | -20.1% | 5 |
| Aug 5, 2021 | 0039-07-258F 2021(932) | Cameron Pharr |
TRAFFIC SIGNAL IMPROVEMENTSIH 69E · | $157,044 | $150,583 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -4.1% | 2 |
| Aug 5, 2021 | 0065-02-056F 2021(936) | Jasper Beaumont |
TRAFFIC SIGNAL IMPROVEMENTSUS 96 · | $107,583 | $104,464 | THIRD COAST SERVICES LLC | -2.9% | 3 |
| Aug 5, 2021 | 0910-34-033F 2021(924) | Henderson Tyler |
LANDSCAPE DEVELOPMENTVA · | $108,760 | $72,072 | TIGHT LINE CONSTRUCTION, LLC | -33.7% | 4 |
| Aug 4, 2021 | 0135-10-050F 2021(536) | Denton Dallas |
WDN 4 TO 6 LN DIV W/ GRADE SEP, ADD RT/LT TURN LNUS 380 · | $148,561,178 | $140,553,393 | ZACHRY CONSTRUCTION CORPORATION | -5.4% | 6 |
| Aug 4, 2021 | 0188-10-021F 2021(492) | Fort Bend Houston |
WIDEN ROADWAYFM 1463 · | $102,375,985 | $108,363,935 | ZACHRY CONSTRUCTION CORPORATION | +5.8% | 3 |
| Aug 4, 2021 | 0188-05-027NH 2021(728) | Brazoria Houston |
RECONSTRUCT & WIDEN ROAD FROM 2 TO 4 LANE DIVIDEDSH 36 · | $91,239,425 | $96,532,489 | ZACHRY CONSTRUCTION CORPORATION | +5.8% | 2 |
| Aug 4, 2021 | 0172-09-037F 2021(864) | Tarrant Fort Worth |
WIDEN ROAD - ADD SHOULDERSUS 287 · | $30,222,263 | $30,738,904 | ED BELL CONSTRUCTION COMPANY | +1.7% | 7 |
| Aug 4, 2021 | 0699-01-052F 2021(851) | Taylor Abilene |
WIDEN ROAD - ADD LANESFM 89 · | $24,229,630 | $28,944,555 | A. L. HELMCAMP, INC. | +19.5% | 2 |
| Aug 4, 2021 | 0050-03-096STP 2021(770)HES | Grimes Bryan |
HAZARD ELIMINATION & SAFETYSH 6 · | $18,724,906 | $18,052,622 | LARRY YOUNG PAVING, INC. | -3.6% | 6 |
| Aug 4, 2021 | 2121-04-114CBI 2021(797) | El Paso El Paso |
WIDEN ROAD - ADD LANESIH 10 · | $17,988,823 | $18,039,541 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +0.3% | 5 |
| Aug 4, 2021 | 0180-06-067F 2021(879) | San Patricio Corpus Christi |
INTERCHANGE IMPROVEMENT (NEW OR UPDATE)SH 35 · | $17,562,493 | $17,952,983 | BAY LTD. | +2.2% | 3 |
| Aug 4, 2021 | 0169-07-053C 169-7-53 | Gray Amarillo |
HIGHWAY IMPROVEMENTUS 60 · | $18,919,048 | $16,536,379 | RK HALL, LLC | -12.6% | 5 |
| Aug 4, 2021 | 1259-01-044F 2021(653) | Montgomery Houston |
RECONSTRUCT & WIDEN FROM 2 TO 4 LANESFM 1097 · | $14,647,689 | $16,095,271 | JAMES CONSTRUCTION GROUP, LLC | +9.9% | 7 |
| Aug 4, 2021 | 1236-01-015F 2021(843) | Willacy Pharr |
RECONSTRUCT EXISTING ROADWAYFM 1018 · | $14,854,432 | $12,441,759 | FOREMOST PAVING, INC. | -16.2% | 4 |
| Aug 4, 2021 | 1113-01-028BR 2021(774) | De Witt Yoakum |
BRIDGE REPLACEMENTFM 766 · | $12,049,383 | $12,073,106 | TEXAS MATERIALS GROUP, INC. | +0.2% | 4 |
| Aug 4, 2021 | 0495-09-056C 495-9-56 | Harrison Atlanta |
REPLACE BRIDGE & APPROACHESIH 20 · | $10,475,734 | $11,887,791 | EAST TEXAS BRIDGE, INC. | +13.5% | 4 |
| Aug 4, 2021 | 0902-39-040C 902-39-40 | Palo Pinto Fort Worth |
STATE PARK IMPROVEMENTSVA · | $10,178,415 | $11,699,665 | A. L. HELMCAMP, INC. | +14.9% | 2 |
| Aug 4, 2021 | 0162-01-097C 162-1-97 | McLennan Waco |
CONSTRUCT NEW OVERPASS AND APPROACHESSH 31 · | $11,439,533 | $11,321,680 | WEBBER, LLC | -1.0% | 5 |
| Aug 4, 2021 | 0015-09-194F 2021(948) | Williamson Austin |
HIGHWAY IMPROVEMENTIH 35 · | $8,402,902 | $9,323,423 | J.D. ABRAMS, L.P. | +11.0% | 5 |
| Aug 4, 2021 | 0111-08-100C 111-8-100 | Brazoria Houston |
WIDEN TO 4-LANE DIVIDED RURALSH 36 · | $7,638,229 | $8,923,165 | COPASA INC | +16.8% | 4 |
| Aug 4, 2021 | 0617-02-001BR 2021(752) | Nueces Corpus Christi |
BRIDGE MAINTENANCEPR 22 · | $9,230,111 | $8,685,850 | GIBSON & ASSOCIATES, INC. | -5.9% | 3 |
| Aug 4, 2021 | 0189-01-012F 2021(792) | Red River Paris |
PREVENTIVE MAINTENANCESH 37 · | $9,286,772 | $7,781,705 | RK HALL, LLC | -16.2% | 3 |
| Aug 4, 2021 | 0150-04-046C 150-4-46 | Llano Austin |
HIGHWAY IMPROVEMENTSH 29 · | $7,172,733 | $7,398,989 | HUNTER INDUSTRIES, LTD. | +3.2% | 4 |
| Aug 4, 2021 | 2523-01-026C 2523-1-26 | Galveston Houston |
WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVEFM 2004 · | $7,104,633 | $7,147,857 | TEXAS MATERIALS GROUP, INC. | +0.6% | 2 |
| Aug 4, 2021 | 0316-03-010F 2021(793) | Grayson Paris |
REHABILITATE EXISTING ROADWAYFM 1753 · | $5,627,905 | $6,464,805 | RK HALL, LLC | +14.9% | 4 |
| Aug 4, 2021 | 0650-01-034F 2021(848) | Nolan Abilene |
WIDEN ROAD - ADD SHOULDERSSH 153 · | $6,268,122 | $5,924,739 | NOBLES ROAD CONSTRUCTION, INC. | -5.5% | 8 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.