261Let jobs
$1,415,162,547Total low bids
$1,426,883,915Total estimates
-0.8%Low bids vs estimates
Aug 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 31, 2021 | 6383-96-001MMC - 638396001 | El Paso El Paso |
HOT MIXIH 10 · | $272,500 | $246,000 | JOBE MATERIALS, L.P. | -9.7% | 2 |
| Aug 30, 2021 | 6386-95-001MMC - 638695001 | Wichita Wichita Falls |
DE-ICING SALTUS 287 · | $273,325 | $300,600 | SOUTHWEST ENVIROTX PARTNERS, LLC | +10.0% | 4 |
| Aug 26, 2021 | 6387-57-001MMC - 638757001 | San Augustine Lufkin |
HOT MIXUS 96 · | $235,284 | $225,470 | EAST TEXAS ASPHALT CO., LTD. | -4.2% | 1 |
| Aug 26, 2021 | 6387-56-001MMC - 638756001 | Nacogdoches Lufkin |
AGGREGATEFM 343 · | $131,142 | $131,000 | ARCOSA LWS, LLC | -0.1% | 1 |
| Aug 26, 2021 | 6381-54-001MMC - 638154001 | Hidalgo Pharr |
ASPHALTIC PATCHING MATERIALSH 495 · | $52,500 | $105,000 | DIGG COMMERCIAL, LLC | +100.0% | 1 |
| Aug 26, 2021 | 6385-08-001MMC - 638508001 | El Paso El Paso |
AGGREGATESL 375 · | $114,000 | $63,465 | JOBE MATERIALS, L.P. | -44.3% | 2 |
| Aug 25, 2021 | 6383-49-001RMC - 638349001 | Menard San Angelo |
SMALL SIGN REPLACEMENTUS 83 · | $264,709 | $187,410 | TWELVE STARS CONSTRUCTION COMPANY LLC | -29.2% | 8 |
| Aug 24, 2021 | 6387-43-001MMC - 638743001 | Comanche Brownwood |
LIMESTONE ROCK AND ASPHALTSH 16 · | $298,707 | $312,017 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.5% | 1 |
| Aug 24, 2021 | 6387-42-001MMC - 638742001 | Brown Brownwood |
LIMESTONE ROCK AND ASPHALTUS 183 · | $284,430 | $269,444 | VULCAN CONSTRUCTION MATERIALS, LLC | -5.3% | 1 |
| Aug 24, 2021 | 6387-44-001MMC - 638744001 | Lampasas Brownwood |
LIMESTONE ROCK AND ASPHALTUS 281 · | $268,284 | $259,598 | VULCAN CONSTRUCTION MATERIALS, LLC | -3.2% | 1 |
| Aug 24, 2021 | 6381-03-001RMC - 638103001 | Brazoria Houston |
HOT MIXFM 518 · | $237,970 | $228,110 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -4.1% | 3 |
| Aug 24, 2021 | 6383-88-001MMC - 638388001 | Harris Houston |
WINTER WEATHER MATERIALIH 45 · | $120,461 | $94,288 | SOUTHWEST ENVIROTX PARTNERS, LLC | -21.7% | 4 |
| Aug 24, 2021 | 6376-85-001RMC - 637685001 | Harris Houston |
TREE REMOVALIH 10 · | $105,513 | $72,850 | JMT CONSTRUCTION | -31.0% | 4 |
| Aug 19, 2021 | 6380-10-001RMC - 638010001 | Erath Fort Worth |
TREE TRIMMING AND BRUSH REMOVALUS 377 · | $295,632 | $214,006 | FOWLER CONSTRUCTION | -27.6% | 8 |
| Aug 19, 2021 | 6384-51-001MMC - 638451001 | Hunt Paris |
ASPHALTIC PATCHING MATERIALIH 30 · | $232,500 | $195,000 | RK HALL, LLC | -16.1% | 1 |
| Aug 19, 2021 | 6380-78-001RMC - 638078001 | Johnson Fort Worth |
TREE TRIMMING AND BRUSH REMOVALFM 1902 · | $208,509 | $187,081 | PATHFIELD INVESTMENTS LLC | -10.3% | 7 |
| Aug 19, 2021 | 6387-74-001RMC - 638774001 | Webb Laredo |
LANDSCAPE MAINTENANCEIH 35 · | $151,193 | $143,223 | RK POWER DRIVE SERVICES, INC. | -5.3% | 1 |
| Aug 19, 2021 | 6377-49-001RMC - 637749001 | Erath Fort Worth |
CRACK SEALUS 377 · | $179,629 | $143,064 | D & M CONTRACTORS, LLC | -20.4% | 6 |
| Aug 19, 2021 | 6379-22-001RMC - 637922001 | Kinney Laredo |
MOWING HIGHWAY RIGHT OF WAYUS 90 · | $153,668 | $114,234 | R&M INCORPORATED | -25.7% | 3 |
| Aug 19, 2021 | 6378-95-001RMC - 637895001 | Parker Fort Worth |
CRACK SEALIH 20 · | $99,869 | $78,789 | D & M CONTRACTORS, LLC | -21.1% | 6 |
| Aug 19, 2021 | 6384-37-001MMC - 638437001 | Rains Paris |
LIMEUS 69 · | $74,032 | $44,275 | TEXAS LIME COMPANY | -40.2% | 2 |
| Aug 19, 2021 | 6387-81-001RMC - 638781001 | Fannin Paris |
JANITORIAL MAINTENANCESH 78 · | $18,000 | $13,200 | RWCS JANITORIAL LLC | -26.7% | 3 |
| Aug 17, 2021 | 6386-20-001MMC - 638620001 | San Patricio Corpus Christi |
HOT MIXUS 77 · | $294,640 | $313,200 | HAC MATERIALS, LTD. | +6.3% | 2 |
| Aug 17, 2021 | 6386-18-001MMC - 638618001 | Nueces Corpus Christi |
HOT MIXIH 37 · | $293,980 | $299,720 | HAC MATERIALS, LTD. | +2.0% | 2 |
| Aug 17, 2021 | 6387-50-001MMC - 638750001 | Bee Corpus Christi |
HOT MIXUS 59 · | $294,640 | $289,296 | COLORADO MATERIALS, LTD. | -1.8% | 2 |
| Aug 17, 2021 | 6386-53-001MMC - 638653001 | Navarro Dallas |
ASPHALTIC PATCHING MATERIALSH 31 · | $273,000 | $285,100 | TEXAS MATERIALS GROUP, INC. | +4.4% | 1 |
| Aug 17, 2021 | 6382-36-001MMC - 638236001 | Randall Amarillo |
HOT MIXIH 27 · | $278,800 | $274,300 | RK HALL, LLC | -1.6% | 3 |
| Aug 17, 2021 | 6382-37-001MMC - 638237001 | Oldham Amarillo |
HOT MIXIH 40 · | $266,000 | $274,300 | RK HALL, LLC | +3.1% | 3 |
| Aug 17, 2021 | 6382-38-001MMC - 638238001 | Armstrong Amarillo |
HOT MIXFM 1151 · | $266,000 | $274,300 | RK HALL, LLC | +3.1% | 3 |
| Aug 17, 2021 | 6386-21-001MMC - 638621001 | Refugio Corpus Christi |
HOT MIXFM 774 · | $257,100 | $261,226 | COLORADO MATERIALS, LTD. | +1.6% | 2 |
| Aug 17, 2021 | 6383-72-001BPM - 638372001 | San Patricio Corpus Christi |
BRIDGE PREVENTATIVE MAINTENANCEUS 181 · | $180,054 | $248,951 | DBI SERVICES, LLC | +38.3% | 3 |
| Aug 17, 2021 | 6386-43-001MMC - 638643001 | Navarro Dallas |
LIMESTONE ROCK AND ASPHALTSH 31 · | $215,600 | $233,194 | VULCAN CONSTRUCTION MATERIALS, LLC | +8.2% | 1 |
| Aug 17, 2021 | 6386-08-001MMC - 638608001 | Ellis Dallas |
HOT MIXFM 876 · | $249,000 | $210,500 | TEXAS MATERIALS GROUP, INC. | -15.5% | 1 |
| Aug 17, 2021 | 6387-49-001MMC - 638749001 | Aransas Corpus Christi |
HOT MIXSH 35 · | $165,800 | $175,834 | COLORADO MATERIALS, LTD. | +6.1% | 2 |
| Aug 17, 2021 | 6387-59-001MMC - 638759001 | Sabine Lufkin |
AGGREGATEFM 83 · | $171,311 | $168,000 | ARCOSA LWS, LLC | -1.9% | 1 |
| Aug 17, 2021 | 6386-52-001MMC - 638652001 | Navarro Dallas |
AGGREGATESH 31 · | $177,000 | $156,000 | ARCOSA LWS, LLC | -11.9% | 1 |
| Aug 17, 2021 | 6386-88-001MMC - 638688001 | Kaufman Dallas |
LIMESTONE ROCK AND ASPHALTFM 2728 · | $130,200 | $141,006 | VULCAN CONSTRUCTION MATERIALS, LLC | +8.3% | 1 |
| Aug 17, 2021 | 6387-60-001MMC - 638760001 | Trinity Lufkin |
AGGREGATEUS 287 · | $125,874 | $119,900 | ARCOSA LWS, LLC | -4.7% | 1 |
| Aug 17, 2021 | 6386-45-001MMC - 638645001 | Navarro Dallas |
ASPHALTSH 31 · | $79,200 | $82,200 | CLEVELAND ASPHALT PRODUCTS, INC. | +3.8% | 2 |
| Aug 17, 2021 | 6382-33-001MMC - 638233001 | Hutchinson Amarillo |
HYDRAULIC CEMENTSH 136 · | $67,809 | $76,244 | AKA-MATERIALS | +12.4% | 3 |
| Aug 17, 2021 | 6382-32-001MMC - 638232001 | Armstrong Amarillo |
HYDRAULIC CEMENTUS 287 · | $66,539 | $74,819 | AKA-MATERIALS | +12.4% | 3 |
| Aug 17, 2021 | 6382-34-001MMC - 638234001 | Hemphill Amarillo |
HYDRAULIC CEMENTUS 83 · | $55,561 | $63,724 | AKA-MATERIALS | +14.7% | 2 |
| Aug 17, 2021 | 6385-16-001MMC - 638516001 | Collin Dallas |
EMULSIONSH 5 · | $54,960 | $61,920 | MARTIN RESOURCE MANAGEMENT CORPORATION | +12.7% | 3 |
| Aug 17, 2021 | 6381-15-001RMC - 638115001 | Collin Dallas |
TREE TRIMMING AND BRUSH REMOVALFM 547 · | $52,433 | $52,577 | BUSHWACKERS CONTRACTING, LLC | +0.3% | 6 |
| Aug 17, 2021 | 6387-38-001MMC - 638738001 | Kaufman Dallas |
ASPHALTIC PATCHING MATERIALFM 2728 · | $49,600 | $48,650 | ZACK BURKETT CO. | -1.9% | 1 |
| Aug 17, 2021 | 6386-55-001MMC - 638655001 | Navarro Dallas |
ROCK/RIPRAPSH 31 · | $64,800 | $46,800 | KNIFE RIVER CORPORATION - SOUTH | -27.8% | 4 |
| Aug 17, 2021 | 6386-07-001MMC - 638607001 | Ellis Dallas |
ASPHALTFM 876 · | $40,600 | $44,960 | CLEVELAND ASPHALT PRODUCTS, INC. | +10.7% | 2 |
| Aug 17, 2021 | 6386-44-001MMC - 638644001 | Navarro Dallas |
HYDRAULIC CEMENTSH 31 · | $42,400 | $43,960 | AKA-MATERIALS | +3.7% | 3 |
| Aug 17, 2021 | 6387-58-001MMC - 638758001 | Trinity Lufkin |
FLEXIBLE BASEUS 287 · | $32,230 | $31,000 | EAST TEXAS ASPHALT CO., LTD. | -3.8% | 4 |
| Aug 17, 2021 | 6386-10-001MMC - 638610001 | Ellis Dallas |
HYDRAULIC CEMENTFM 876 · | $22,050 | $23,079 | AKA-MATERIALS | +4.7% | 3 |
| Aug 11, 2021 | 6383-86-001RMC - 638386001 | Angelina Lufkin |
INSTALLATION OF WATERBASE STRIPINGUS 59 · | $269,400 | $225,560 | STRIPING TECHNOLOGY, L.P. | -16.3% | 6 |
| Aug 11, 2021 | 6383-85-001RMC - 638385001 | Angelina Lufkin |
INST OF SPOT PAINT AND BEAD STRIPINGUS 59 · | $268,980 | $216,550 | PMI PAVEMENT MARKING, LLC | -19.5% | 6 |
| Aug 10, 2021 | 6379-51-001RMC - 637951001 | Jasper Beaumont |
CULVERT REPAIRUS 96 · | $244,342 | $390,515 | DIGG COMMERCIAL, LLC | +59.8% | 2 |
| Aug 10, 2021 | 6385-14-001RMC - 638514001 | Midland Odessa |
CABLE BARRIER REPAIRIH 20 · | $282,450 | $322,150 | ELITE CASTLE RESOURCES LLC | +14.1% | 3 |
| Aug 10, 2021 | 6385-35-001MMC - 638535001 | Pecos Odessa |
WINTER WEATHER MATERIALIH 10 · | $286,500 | $267,100 | NSG LOGISTICS, LLC | -6.8% | 2 |
| Aug 10, 2021 | 6385-44-001MMC - 638544001 | Midland Odessa |
WINTER WEATHER MATERIALIH 20 · | $279,075 | $257,988 | NSG LOGISTICS, LLC | -7.6% | 2 |
| Aug 10, 2021 | 6369-21-001RMC - 636921001 | Blanco Austin |
MOWING HIGHWAY RIGHT OF WAYUS 281 · | $220,736 | $251,301 | P-VILLE, INCORPORATED | +13.8% | 1 |
| Aug 10, 2021 | 6383-84-001RMC - 638384001 | Navarro Dallas |
REMOVAL AND DISPOSAL OF DRIFTWOODFM 3041 · | $290,726 | $250,945 | FOWLER CONSTRUCTION | -13.7% | 2 |
| Aug 10, 2021 | 6384-14-001MMC - 638414001 | Angelina Lufkin |
EMULSIONS CRS2PFM 1194 · | $216,100 | $214,760 | MARTIN RESOURCE MANAGEMENT CORPORATION | -0.6% | 3 |
| Aug 10, 2021 | 6383-54-001RMC - 638354001 | Rusk Tyler |
CRACK SEALSH 315 · | $232,712 | $209,154 | D & M CONTRACTORS, LLC | -10.1% | 4 |
| Aug 10, 2021 | 6369-16-001RMC - 636916001 | Williamson Austin |
CRACK SEALUS 79 · | $232,922 | $204,487 | CRACKSEAL OF TEXAS, LLC | -12.2% | 2 |
| Aug 10, 2021 | 6383-33-001RMC - 638333001 | Kaufman Dallas |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 20 · | $222,400 | $183,350 | PMI PAVEMENT MARKING, LLC | -17.6% | 5 |
| Aug 10, 2021 | 6382-06-001MMC - 638206001 | Lamb Lubbock |
HOT-MIX COLD-LAIDUS 84 · | $140,000 | $169,260 | ZACK BURKETT CO. | +20.9% | 2 |
| Aug 10, 2021 | 6384-78-001RMC - 638478001 | Orange Beaumont |
CULVERT CLEANINGIH 10 · | $223,540 | $168,500 | TALBRAN ENTERPRISES LLC | -24.6% | 3 |
| Aug 10, 2021 | 6382-88-001RMC - 638288001 | Ellis Dallas |
RAISED PAVEMENT MARKERSIH 45 · | $196,344 | $166,553 | BRYDL CONTRACTING, INC. | -15.2% | 3 |
| Aug 10, 2021 | 6385-46-001MMC - 638546001 | Ector Odessa |
WINTER WEATHER MATERIALSL 338 · | $180,613 | $162,913 | NSG LOGISTICS, LLC | -9.8% | 3 |
| Aug 10, 2021 | 6381-34-001RMC - 638134001 | Ellis Dallas |
CRACK SEALFM 813 · | $163,251 | $149,680 | D & M CONTRACTORS, LLC | -8.3% | 5 |
| Aug 10, 2021 | 6385-03-001RMC - 638503001 | Pecos Odessa |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)IH 10 · | $194,500 | $142,050 | L&L COMPANY | -27.0% | 5 |
| Aug 10, 2021 | 6382-65-001RMC - 638265001 | Liberty Beaumont |
BRIDGE SCOUR REPAIRFM 2090 · | $109,335 | $136,602 | B & MS CONSTRUCTION, INC. | +24.9% | 2 |
| Aug 10, 2021 | 6384-96-001RMC - 638496001 | Brazos Bryan |
TREE REMOVALSH 21 · | $262,750 | $134,400 | RUFUS TREE, INC. | -48.8% | 5 |
| Aug 10, 2021 | 6379-12-001BPM - 637912001 | Madison Bryan |
BRIDGE REPAIRFM 1372 · | $134,990 | $132,492 | 12TWELVE ROAD AND BRIDGE LLC | -1.9% | 2 |
| Aug 10, 2021 | 6382-16-001RMC - 638216001 | Collin Dallas |
CLEANING AND SEALING CRACKSFM 75 · | $152,113 | $126,239 | TALBRAN ENTERPRISES LLC | -17.0% | 4 |
| Aug 10, 2021 | 6382-64-001RMC - 638264001 | Chambers Beaumont |
BRIDGE SCOUR REPAIRSH 65 · | $68,993 | $109,595 | FNH CONSTRUCTION, LLC | +58.8% | 1 |
| Aug 10, 2021 | 6369-19-001RMC - 636919001 | Travis Austin |
CRACK SEALUS 183 · | $121,789 | $108,528 | TALBRAN ENTERPRISES LLC | -10.9% | 2 |
| Aug 10, 2021 | 6369-18-001RMC - 636918001 | Burnet Austin |
CRACK SEALSH 29 · | $90,650 | $106,304 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | +17.3% | 4 |
| Aug 10, 2021 | 6369-17-001RMC - 636917001 | Bastrop Austin |
CRACK SEALUS 290 · | $107,154 | $106,009 | D & M CONTRACTORS, LLC | -1.1% | 4 |
| Aug 10, 2021 | 6380-69-001RMC - 638069001 | Navarro Dallas |
CRACK SEALSH 22 · | $92,177 | $81,912 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -11.1% | 5 |
| Aug 10, 2021 | 6377-09-001RMC - 637709001 | Chambers Beaumont |
CRACK SEALSH 61 · | $115,595 | $80,205 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.6% | 4 |
| Aug 10, 2021 | 6385-33-001MMC - 638533001 | Pecos Odessa |
ASPHALTIC PATCHING MATERIALIH 10 · | $77,200 | $80,135 | ZACK BURKETT CO. | +3.8% | 1 |
| Aug 10, 2021 | 6382-05-001RMC - 638205001 | Kaufman Dallas |
CRACK SEALUS 80 · | $98,446 | $79,570 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -19.2% | 3 |
| Aug 10, 2021 | 6385-24-001MMC - 638524001 | Walker Bryan |
AGGREGATEIH 45 · | $70,699 | $76,759 | COLORADO MATERIALS, LTD. | +8.6% | 3 |
| Aug 10, 2021 | 6385-23-001MMC - 638523001 | Brazos Bryan |
AGGREGATESH 6 · | $67,926 | $61,948 | COLORADO MATERIALS, LTD. | -8.8% | 4 |
| Aug 10, 2021 | 6385-45-001MMC - 638545001 | Midland Odessa |
ASPHALTIC PATCHING MATERIALIH 20 · | $60,000 | $57,675 | ZACK BURKETT CO. | -3.9% | 1 |
| Aug 10, 2021 | 6385-10-001MMC - 638510001 | Brazos Bryan |
SNOW AND ICE CONTROLSH 21 · | $58,500 | $53,244 | THE BARGAIN SOURCE | -9.0% | 3 |
| Aug 10, 2021 | 6385-26-001MMC - 638526001 | Ector Odessa |
ASPHALTIC PATCHING MATERIALIH 20 · | $52,500 | $52,505 | ZACK BURKETT CO. | +0.0% | 1 |
| Aug 10, 2021 | 6385-22-001MMC - 638522001 | Washington Bryan |
AGGREGATESH 36 · | $55,450 | $47,424 | COLORADO MATERIALS, LTD. | -14.5% | 3 |
| Aug 10, 2021 | 6385-71-001MMC - 638571001 | Leon Bryan |
WINTER WEATHER MATERIALIH 45 · | $17,550 | $17,460 | THE BARGAIN SOURCE | -0.5% | 3 |
| Aug 5, 2021 | 0389-05-087C 389-5-87 | Harris Houston |
RECONSTRUCT AND WIDEN FREEWAY FACILITYSH 146 · | $123,933,207 | $110,766,238 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | -10.6% | 2 |
| Aug 5, 2021 | 0258-09-142F 2021(943) | McLennan Waco |
CONSTRUCT RAMPSSH 6 · | $61,351,329 | $62,594,543 | WEBBER, LLC | +2.0% | 2 |
| Aug 5, 2021 | 1062-02-009F 2021(840) | Harris Houston |
WIDEN ROAD - ADD LANESFM 2100 · | $53,244,882 | $54,799,230 | WEBBER, LLC | +2.9% | 6 |
| Aug 5, 2021 | 0523-09-009C 523-9-9 | Montgomery Houston |
WIDEN ROAD - ADD LANESFM 1488 · | $48,732,194 | $48,285,564 | JAMES CONSTRUCTION GROUP, LLC | -0.9% | 2 |
| Aug 5, 2021 | 3538-01-055F 2021(547) | Montgomery Houston |
WIDEN ROAD - ADD LANESSH 242 · | $31,303,598 | $30,991,508 | JAMES CONSTRUCTION GROUP, LLC | -1.0% | 4 |
| Aug 5, 2021 | 2502-01-021F 2021(093) | Bell Waco |
WIDEN ROAD - ADD LANESSL 121 · | $29,978,534 | $29,180,209 | JAMES CONSTRUCTION GROUP, LLC | -2.7% | 4 |
| Aug 5, 2021 | 0587-01-060BR 2013(874) | Brazoria Houston |
BRIDGE REPLACEMENTFM 1495 · | $24,916,222 | $28,742,987 | RAGLE CONSTRUCTION, INC. | +15.4% | 6 |
| Aug 5, 2021 | 0213-04-050F 2021(826) | Polk Lufkin |
INTERSECTION IMPROVEMENTS W/RIGHT &/OR LEFT TURN LUS 190 · | $28,372,220 | $27,556,812 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -2.9% | 3 |
| Aug 5, 2021 | 0028-03-107STP 2021(525)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYUS 90 · | $22,677,882 | $24,884,247 | JAMES CONSTRUCTION GROUP, LLC | +9.7% | 9 |
| Aug 5, 2021 | 0236-04-029C 236-4-29 | Frio San Antonio |
REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERSFM 117 · | $25,996,381 | $23,587,273 | HUNTER INDUSTRIES, LTD. | -9.3% | 4 |
| Aug 5, 2021 | 0068-01-074C 68-1-74 | Lubbock Lubbock |
CONSTRUCT BRIDGEUS 87 · | $22,111,420 | $21,657,409 | ALLEN BUTLER CONSTRUCTION, INC. | -2.1% | 5 |
| Aug 5, 2021 | 0088-05-098C 88-5-98 | Victoria Yoakum |
CONSTRUCT ONE WAY FRONTAGE ROADSUS 59 · | $11,687,239 | $13,531,313 | HUNTER INDUSTRIES, LTD. | +15.8% | 1 |
| Aug 5, 2021 | 0108-02-033F 2021(821) | Van Zandt Tyler |
HIGHWAY IMPROVEMENTSH 19 · | $13,424,556 | $12,108,566 | BIG CREEK CONSTRUCTION, LTD. | -9.8% | 6 |
1–100 of 261Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.