215Let jobs
$809,536,595Total low bids
$845,332,054Total estimates
-4.2%Low bids vs estimates
Jun 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 29, 2021 | 6384-27-001MMC - 638427001 | Shelby Lufkin |
FLEXIBLE BASESH 7 · | $237,660 | $237,660 | EAST TEXAS ASPHALT CO., LTD. | 0.0% | 2 |
| Jun 29, 2021 | 6384-26-001MMC - 638426001 | Shelby Lufkin |
EMULSIONSH 7 · | $120,870 | $125,220 | MARTIN RESOURCE MANAGEMENT CORPORATION | +3.6% | 3 |
| Jun 28, 2021 | 6378-41-001RMC - 637841001 | Gonzales Yoakum |
MILLING IN RUMBLE STRIPSUS 90 · | $293,867 | $205,848 | STRIPE-A-ZONE, INC. | -30.0% | 5 |
| Jun 22, 2021 | 6384-11-001MMC - 638411001 | Midland Odessa |
LIMESTONE ROCK AND ASPHALTIH 20 · | $160,000 | $154,573 | MARTIN MARIETTA MATERIALS, INC. | -3.4% | 2 |
| Jun 22, 2021 | 6383-76-001MMC - 638376001 | Trinity Lufkin |
HYDRAULIC CEMENTFM 1280 · | $134,837 | $132,304 | AKA-MATERIALS | -1.9% | 1 |
| Jun 22, 2021 | 6384-13-001MMC - 638413001 | Ector Odessa |
LIMESTONE ROCK AND ASPHALTSL 338 · | $130,000 | $126,841 | VULCAN CONSTRUCTION MATERIALS, LLC | -2.4% | 2 |
| Jun 22, 2021 | 6384-20-001MMC - 638420001 | Pecos Odessa |
LIMESTONE ROCK AND ASPHALTIH 10 · | $95,000 | $86,439 | VULCAN CONSTRUCTION MATERIALS, LLC | -9.0% | 2 |
| Jun 22, 2021 | 6381-01-001RMC - 638101001 | Menard San Angelo |
TREE TRIMMINGUS 83 · | $102,119 | $82,117 | HX FARMS, INC. | -19.6% | 4 |
| Jun 22, 2021 | 6383-75-001MMC - 638375001 | Trinity Lufkin |
CUTBACKUS 287 · | $60,885 | $47,025 | MARTIN RESOURCE MANAGEMENT CORPORATION | -22.8% | 2 |
| Jun 17, 2021 | 6379-18-001RMC - 637918001 | Lamar Paris |
PICNIC AREA MAINTENANCEUS 271 · | $107,300 | $104,920 | WILLIAM CURTIS SMITH | -2.2% | 1 |
| Jun 17, 2021 | 6379-41-001RMC - 637941001 | Tyler Beaumont |
CRACK SEALUS 69 · | $124,950 | $84,524 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -32.4% | 3 |
| Jun 16, 2021 | 6382-97-001MMC - 638297001 | Comal San Antonio |
LIMESTONE ROCK AND ASPHALTIH 35 · | $282,750 | $312,698 | VULCAN CONSTRUCTION MATERIALS, LLC | +10.6% | 2 |
| Jun 16, 2021 | 6383-04-001MMC - 638304001 | Kendall San Antonio |
LIMESTONE ROCK AND ASPHALTIH 10 · | $282,750 | $296,688 | MARTIN MARIETTA MATERIALS, INC. | +4.9% | 2 |
| Jun 16, 2021 | 6377-93-001MMC - 637793001 | Bexar San Antonio |
LIMESTONE ROCK AND ASPHALTIH 10 · | $282,750 | $293,955 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.0% | 2 |
| Jun 16, 2021 | 6382-87-001RMC - 638287001 | Comal San Antonio |
CRACK SEALFM 3009 · | $273,330 | $288,634 | TALBRAN ENTERPRISES LLC | +5.6% | 4 |
| Jun 16, 2021 | 6378-00-001MMC - 637800001 | Bexar San Antonio |
EMULSIONIH 10 · | $279,600 | $265,140 | ERGON ASPHALT & EMULSIONS, INC. | -5.2% | 2 |
| Jun 16, 2021 | 6382-96-001MMC - 638296001 | Medina San Antonio |
LIMESTONE ROCK AND ASPHALTIH 35 · | $282,750 | $264,953 | MARTIN MARIETTA MATERIALS, INC. | -6.3% | 2 |
| Jun 16, 2021 | 6382-84-001RMC - 638284001 | Bexar San Antonio |
CRACK SEALIH 410 · | $264,510 | $261,303 | TALBRAN ENTERPRISES LLC | -1.2% | 4 |
| Jun 16, 2021 | 6377-99-001MMC - 637799001 | Medina San Antonio |
HOT MIXIH 35 · | $280,750 | $243,700 | CENTURY ASPHALT, LTD. | -13.2% | 4 |
| Jun 16, 2021 | 6383-03-001MMC - 638303001 | Uvalde San Antonio |
LIMESTONE ROCK AND ASPHALTUS 90 · | $282,750 | $237,413 | MARTIN MARIETTA MATERIALS, INC. | -16.0% | 2 |
| Jun 16, 2021 | 6377-98-001MMC - 637798001 | Medina San Antonio |
AGGREGATEIH 35 · | $276,000 | $232,650 | VULCAN CONSTRUCTION MATERIALS, LLC | -15.7% | 3 |
| Jun 16, 2021 | 6377-97-001MMC - 637797001 | Kerr San Antonio |
AGGREGATEIH 10 · | $276,000 | $220,275 | MARTIN MARIETTA MATERIALS, INC. | -20.2% | 4 |
| Jun 16, 2021 | 6378-01-001MMC - 637801001 | Bexar San Antonio |
AGGREGATEIH 10 · | $276,000 | $207,315 | MARTIN MARIETTA MATERIALS, INC. | -24.9% | 4 |
| Jun 16, 2021 | 6382-85-001RMC - 638285001 | Medina San Antonio |
CRACK SEALUS 90 · | $229,380 | $193,451 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -15.7% | 4 |
| Jun 16, 2021 | 6382-86-001RMC - 638286001 | Kerr San Antonio |
CRACK SEALUS 83 · | $164,520 | $186,545 | TALBRAN ENTERPRISES LLC | +13.4% | 4 |
| Jun 16, 2021 | 6377-95-001MMC - 637795001 | Travis Austin |
ASPHALTIH 35 · | $168,000 | $129,850 | LONE STAR PAVING COMPANY | -22.7% | 2 |
| Jun 16, 2021 | 6374-51-001MMC - 637451001 | Wharton Yoakum |
ROCK/RIPRAP (MATERIAL ONLY)US 59 · | $155,000 | $120,000 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | -22.6% | 2 |
| Jun 16, 2021 | 6374-50-001MMC - 637450001 | Fayette Yoakum |
ROCK/RIPRAP (MATERIAL ONLY)IH 10 · | $155,000 | $100,000 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | -35.5% | 3 |
| Jun 16, 2021 | 6373-41-001BPM - 637341001 | Uvalde San Antonio |
REPLACE BEARING SEAT PADSUS 83 · | $221,712 | $76,800 | BLACKSMITH VENTURES LLC | -65.4% | 5 |
| Jun 16, 2021 | 6378-05-001MMC - 637805001 | Travis Austin |
HYDRAULIC CEMENT CONCRETEIH 35 · | $58,277 | $69,200 | DIGG COMMERCIAL, LLC | +18.7% | 1 |
| Jun 15, 2021 | 6381-59-001RMC - 638159001 | Culberson El Paso |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $290,415 | $451,725 | DIGG COMMERCIAL, LLC | +55.5% | 2 |
| Jun 15, 2021 | 6382-04-001MMC - 638204001 | Houston Lufkin |
HOT MIXSH 21 · | $229,441 | $272,596 | VULCAN CONSTRUCTION MATERIALS, LLC | +18.8% | 2 |
| Jun 15, 2021 | 6378-64-001RMC - 637864001 | Harris Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSH 249 · | $280,925 | $271,588 | AIMS COMPANIES | -3.3% | 2 |
| Jun 15, 2021 | 6379-81-001MMC - 637981001 | Smith Tyler |
WINTER WEATHER MATERIALSH 31 · | $258,750 | $246,330 | SOUTHWEST ENVIROTX PARTNERS, LLC | -4.8% | 1 |
| Jun 15, 2021 | 6378-70-001RMC - 637870001 | San Patricio Corpus Christi |
CRACK SEALUS 77 · | $275,426 | $209,584 | D & M CONTRACTORS, LLC | -23.9% | 4 |
| Jun 15, 2021 | 6379-82-001MMC - 637982001 | Smith Tyler |
WINTER WEATHER MATERIALSH 31 · | $100,000 | $139,600 | DIGG COMMERCIAL, LLC | +39.6% | 1 |
| Jun 15, 2021 | 6378-69-001RMC - 637869001 | Bee Corpus Christi |
CRACK SEALUS 181 · | $197,898 | $137,825 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.4% | 4 |
| Jun 15, 2021 | 6378-68-001RMC - 637868001 | Nueces Corpus Christi |
CRACK SEALSH 44 · | $123,692 | $129,524 | D & M CONTRACTORS, LLC | +4.7% | 4 |
| Jun 15, 2021 | 6379-80-001MMC - 637980001 | Smith Tyler |
WINTER WEATHER MATERIALSH 31 · | $63,756 | $115,500 | SOUTHWEST ENVIROTX PARTNERS, LLC | +81.2% | 1 |
| Jun 15, 2021 | 6376-74-001RMC - 637674001 | Montgomery Houston |
CRACK SEALIH 45 · | $117,581 | $107,559 | NATIONAL INDUSTRIAL MAINTENANCE, INC. | -8.5% | 4 |
| Jun 15, 2021 | 6378-67-001RMC - 637867001 | Jim Wells Corpus Christi |
CRACK SEALFM 665 · | $111,978 | $88,041 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -21.4% | 4 |
| Jun 15, 2021 | 6381-02-001MMC - 638102001 | San Jacinto Lufkin |
EMULSIONSH 150 · | $63,270 | $66,120 | MARTIN RESOURCE MANAGEMENT CORPORATION | +4.5% | 2 |
| Jun 15, 2021 | 6383-39-001MMC - 638339001 | Sabine Lufkin |
HYDRAULIC CEMENTFM 83 · | $68,000 | $59,920 | AKA-MATERIALS | -11.9% | 3 |
| Jun 15, 2021 | 6381-04-001MMC - 638104001 | Polk Lufkin |
CUTBACKUS 59 · | $25,650 | $27,450 | CLEVELAND ASPHALT PRODUCTS, INC. | +7.0% | 1 |
| Jun 15, 2021 | 6383-38-001MMC - 638338001 | Sabine Lufkin |
EMULSIONSH 184 · | $28,680 | $24,720 | CLEVELAND ASPHALT PRODUCTS, INC. | -13.8% | 3 |
| Jun 14, 2021 | 6381-87-001MMC - 638187001 | Colorado Yoakum |
HOT-MIX COLD-LAIDIH 10 · | $299,200 | $294,800 | QUALITY HOT MIX, INC. | -1.5% | 4 |
| Jun 14, 2021 | 6382-01-001MMC - 638201001 | Wharton Yoakum |
AGGREGATEUS 59 · | $252,915 | $290,500 | QUALITY HOT MIX, INC. | +14.9% | 5 |
| Jun 14, 2021 | 6381-89-001MMC - 638189001 | Gonzales Yoakum |
HOT-MIX COLD-LAIDIH 10 · | $299,200 | $270,600 | LONE STAR PAVING COMPANY | -9.6% | 5 |
| Jun 14, 2021 | 6381-78-001MMC - 638178001 | Colorado Yoakum |
HOT MIXIH 10 · | $294,000 | $260,400 | QUALITY HOT MIX, INC. | -11.4% | 4 |
| Jun 10, 2021 | 6382-22-001MMC - 638222001 | Hidalgo Pharr |
FLEXIBLE BASESH 495 · | $255,000 | $404,700 | DIGG COMMERCIAL, LLC | +58.7% | 1 |
| Jun 10, 2021 | 6350-32-001MMC - 635032001 | Lavaca Yoakum |
.US 77 · | $292,500 | $265,500 | QUALITY HOT MIX, INC. | -9.2% | 5 |
| Jun 10, 2021 | 6380-48-001MMC - 638048001 | Victoria Yoakum |
HYDRAULIC CEMENTUS 59 · | $236,419 | $239,186 | AKA-MATERIALS | +1.2% | 2 |
| Jun 10, 2021 | 6381-61-001MMC - 638161001 | Hidalgo Pharr |
HYDRAULIC CEMENTSH 495 · | $140,875 | $152,933 | KLP COMMERCIAL, L.L.C. | +8.6% | 3 |
| Jun 10, 2021 | 6381-53-001MMC - 638153001 | Hidalgo Pharr |
MISCELLANEOUS CONCRETE REPAIRSH 495 · | $15,015 | $33,840 | DIGG COMMERCIAL, LLC | +125.4% | 1 |
| Jun 9, 2021 | 6375-09-001EMC - 637509001 | Medina San Antonio |
REPLACE DAMAGED BRIDGE GIRDERSIH 35 · | $1,447,446 | $1,183,845 | GIBSON & ASSOCIATES, INC. | -18.2% | 2 |
| Jun 9, 2021 | 6381-88-001MMC - 638188001 | Jackson Yoakum |
HOT-MIX COLD-LAIDUS 59 · | $299,200 | $316,800 | QUALITY HOT MIX, INC. | +5.9% | 4 |
| Jun 9, 2021 | 6380-85-001MMC - 638085001 | Victoria Yoakum |
EMULSIONUS 59 · | $255,000 | $257,976 | MARTIN RESOURCE MANAGEMENT CORPORATION | +1.2% | 3 |
| Jun 9, 2021 | 6380-64-001MMC - 638064001 | Fayette Yoakum |
HYDRAULIC CEMENTIH 10 · | $236,419 | $234,619 | KLP COMMERCIAL, L.L.C. | -0.8% | 3 |
| Jun 8, 2021 | 6381-96-001MMC - 638196001 | Matagorda Yoakum |
HOT-MIX COLD-LAIDSH 35 · | $294,000 | $302,400 | QUALITY HOT MIX, INC. | +2.9% | 4 |
| Jun 8, 2021 | 6381-95-001MMC - 638195001 | Wharton Yoakum |
HOT-MIX COLD-LAIDUS 59 · | $299,200 | $297,000 | QUALITY HOT MIX, INC. | -0.7% | 4 |
| Jun 8, 2021 | 6381-90-001MMC - 638190001 | Lavaca Yoakum |
HOT-MIX COLD-LAIDUS 77 · | $299,200 | $294,800 | BRAUNTEX MATERIALS, INC. | -1.5% | 5 |
| Jun 8, 2021 | 6381-93-001MMC - 638193001 | Calhoun Yoakum |
HOT-MIX COLD-LAIDSH 35 · | $294,000 | $294,000 | QUALITY HOT MIX, INC. | 0.0% | 4 |
| Jun 8, 2021 | 6381-92-001MMC - 638192001 | Fayette Yoakum |
HOT-MIX COLD-LAIDIH 10 · | $294,800 | $290,400 | QUALITY HOT MIX, INC. | -1.5% | 6 |
| Jun 8, 2021 | 6381-99-001MMC - 638199001 | Victoria Yoakum |
AGGREGATEUS 59 · | $293,500 | $286,500 | QUALITY HOT MIX, INC. | -2.4% | 5 |
| Jun 8, 2021 | 6381-97-001MMC - 638197001 | Austin Yoakum |
HOT-MIX COLD-LAIDIH 10 · | $294,000 | $285,600 | QUALITY HOT MIX, INC. | -2.9% | 4 |
| Jun 8, 2021 | 6381-94-001MMC - 638194001 | Victoria Yoakum |
HOT-MIX COLD-LAIDUS 59 · | $294,000 | $285,600 | QUALITY HOT MIX, INC. | -2.9% | 4 |
| Jun 8, 2021 | 6382-00-001MMC - 638200001 | Fayette Yoakum |
AGGREGATEIH 10 · | $252,915 | $279,000 | CENTURY ASPHALT, LTD. | +10.3% | 5 |
| Jun 8, 2021 | 6381-16-001RMC - 638116001 | El Paso El Paso |
CULVERT & STORM SEWER CLEANINGIH 10 · | $190,030 | $229,550 | DEL MAR CONTRACTING, INC. | +20.8% | 2 |
| Jun 8, 2021 | 6380-68-001RMC - 638068001 | Walker Bryan |
TREE REMOVALSH 75 · | $291,125 | $220,825 | ROY LEE WALKER | -24.1% | 5 |
| Jun 8, 2021 | 6382-63-001RMC - 638263001 | Walker Bryan |
RAISED PAVEMENT MARKERSSH 30 · | $277,945 | $219,668 | BRYDL CONTRACTING, INC. | -21.0% | 2 |
| Jun 8, 2021 | 6378-47-001RMC - 637847001 | Collin Dallas |
SPECIALTY MARKINGSUS 75 · | $289,380 | $219,212 | STRIPE-A-ZONE, INC. | -24.2% | 5 |
| Jun 8, 2021 | 6380-00-001MMC - 638000001 | Walker Bryan |
ROCK/RIPRAPIH 45 · | $268,000 | $218,500 | KNIFE RIVER CORPORATION - SOUTH | -18.5% | 4 |
| Jun 8, 2021 | 6380-67-001RMC - 638067001 | Freestone Bryan |
TREE REMOVALSH 75 · | $291,125 | $212,191 | SERNA CONTRACTORS, LLC | -27.1% | 4 |
| Jun 8, 2021 | 6379-98-001MMC - 637998001 | Washington Bryan |
ROCK/RIPRAPSH 36 · | $201,000 | $176,909 | TEXCON GENERAL CONTRACTORS | -12.0% | 5 |
| Jun 8, 2021 | 6379-99-001MMC - 637999001 | Brazos Bryan |
ROCK/RIPRAPSH 6 · | $201,000 | $170,447 | TEXCON GENERAL CONTRACTORS | -15.2% | 6 |
| Jun 8, 2021 | 6379-27-001RMC - 637927001 | El Paso El Paso |
CULVERT & STORM SEWER CLEANINGIH 10 · | $186,700 | $163,500 | DEL MAR CONTRACTING, INC. | -12.4% | 1 |
| Jun 8, 2021 | 6377-11-001RMC - 637711001 | Collin Dallas |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)US 380 · | $243,841 | $151,898 | STRIPE-A-ZONE, INC. | -37.7% | 5 |
| Jun 8, 2021 | 6382-19-001RMC - 638219001 | Madison Bryan |
TREE TRIMMING AND BRUSH REMOVALSHOSR0 · | $197,810 | $126,401 | TERRY ENTERPRISES | -36.1% | 11 |
| Jun 8, 2021 | 6382-17-001RMC - 638217001 | Freestone Bryan |
TREE TRIMMING AND BRUSH REMOVALFM 80 · | $148,260 | $94,063 | TERRY ENTERPRISES | -36.6% | 9 |
| Jun 7, 2021 | 6380-84-001MMC - 638084001 | Fayette Yoakum |
EMULSIONIH 10 · | $283,000 | $303,240 | CLEVELAND ASPHALT PRODUCTS, INC. | +7.2% | 3 |
| Jun 7, 2021 | 6381-83-001MMC - 638183001 | Victoria Yoakum |
HOT MIXUS 59 · | $297,000 | $301,500 | QUALITY HOT MIX, INC. | +1.5% | 3 |
| Jun 7, 2021 | 6381-80-001MMC - 638180001 | Jackson Yoakum |
HOT MIXUS 59 · | $297,000 | $301,500 | QUALITY HOT MIX, INC. | +1.5% | 3 |
| Jun 7, 2021 | 6381-85-001MMC - 638185001 | Austin Yoakum |
HOT MIXIH 10 · | $294,800 | $285,560 | CENTURY ASPHALT, LTD. | -3.1% | 3 |
| Jun 7, 2021 | 6381-84-001MMC - 638184001 | Matagorda Yoakum |
HOT MIXSH 35 · | $294,000 | $281,400 | QUALITY HOT MIX, INC. | -4.3% | 4 |
| Jun 7, 2021 | 6381-79-001MMC - 638179001 | De Witt Yoakum |
HOT MIXSH 71 · | $288,000 | $265,500 | BRAUNTEX MATERIALS, INC. | -7.8% | 5 |
| Jun 7, 2021 | 6381-81-001MMC - 638181001 | Gonzales Yoakum |
HOT MIXIH 10 · | $276,000 | $253,000 | CENTURY ASPHALT, LTD. | -8.3% | 5 |
| Jun 4, 2021 | 1502-01-029STP 2021(576) | Lubbock Lubbock |
CONVERT NON-FREEWAY TO FREEWAYFM 1585 · | $139,838,833 | $154,873,365 | SACYR CONSTRUCTION USA LLC | +10.8% | 4 |
| Jun 4, 2021 | 1268-01-013C 1268-1-13 | Comal San Antonio |
EXPAND 2 TO 4 LN W/MEDIANS, TRN LNS, SDWK & BK LNSFM 1103 · | $40,975,029 | $39,295,624 | HUNTER INDUSTRIES, LTD. | -4.1% | 6 |
| Jun 4, 2021 | 0353-09-002C 353-9-2 | Denton Dallas |
CONSTRUCT 0 TO 6 LANE GRADE SEPARATION OVER US 377SH 114 · | $46,908,125 | $36,943,838 | WEBBER, LLC | -21.2% | 13 |
| Jun 4, 2021 | 0075-02-026C 75-2-26 | Pecos Odessa |
WIDEN ROAD - ADD LANES AND SHOULDERSUS 67 · | $37,570,691 | $35,754,470 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -4.8% | 7 |
| Jun 4, 2021 | 0914-33-068C 914-33-68 | Hays Austin |
CONSTRUCT NEW ROADCR · | $21,369,599 | $17,724,256 | J3 COMPANY, LLC | -17.1% | 10 |
| Jun 4, 2021 | 6376-28-001RMC - 637628001 | Harris Houston |
FULL DEPTH CONCRETE REPAIRIH 610 · | $15,022,605 | $13,849,067 | ISI CONTRACTING, INC. | -7.8% | 2 |
| Jun 4, 2021 | 0259-05-080F 2021(638) | Johnson Fort Worth |
RESURFACE ROADWAYUS 67 · | $10,125,392 | $8,658,798 | NORTHEASTERN PAVERS, LLC | -14.5% | 5 |
| Jun 4, 2021 | 0160-01-036F 2021(598) | Sutton San Angelo |
ADD PASSING LANESUS 277 · | $8,510,241 | $8,455,479 | ALLEN KELLER COMPANY | -0.6% | 3 |
| Jun 4, 2021 | 0010-10-026BR 2021(581) | Cass Atlanta |
REPLACE BRIDGE AND APPROACHESUS 67 · | $6,412,223 | $6,039,515 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -5.8% | 5 |
| Jun 4, 2021 | 2373-01-022STP 2020(936)HES | La Salle Laredo |
WIDEN SHLDR, SEALCOAT, PROF MRK ON EDGE&CTR LINESFM 624 · | $5,754,069 | $5,569,436 | BRANNAN PAVING CO., LTD. | -3.2% | 10 |
| Jun 4, 2021 | 1133-02-032F 2021(596) | Gonzales Yoakum |
WIDEN ROADWAY AND INSTALL CENTERLINE RUMBLE STRIPFM 794 · | $6,350,418 | $5,212,301 | HUNTER INDUSTRIES, LTD. | -17.9% | 5 |
| Jun 4, 2021 | 3451-01-035STP 2021(624)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYFM 1281 · | $6,441,872 | $5,171,354 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -19.7% | 3 |
| Jun 4, 2021 | 0016-05-120C 16-5-120 | Comal San Antonio |
HIGHWAY IMPROVEMENTIH 35 · | $5,591,576 | $5,145,675 | ANGEL BROTHERS HOLDINGS CORP. | -8.0% | 7 |
| Jun 4, 2021 | 0073-02-080C 73-2-80 | Bexar San Antonio |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 281 · | $5,066,580 | $4,316,413 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -14.8% | 9 |
1–100 of 215Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.