180Let jobs
$410,612,345Total low bids
$416,911,280Total estimates
-1.5%Low bids vs estimates
Mar 2020 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Mar 31, 2020 | 6358-04-001MMC - 635804001 | Haskell Abilene |
MATERIALS ONLY: LIMESTONE ROCK ASPHALTUS 380 · | $240,784 | $249,530 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.6% | 1 |
| Mar 31, 2020 | 6358-00-001MMC - 635800001 | Haskell Abilene |
MATERIALS ONLY: EMULSIONUS 380 · | $174,840 | $155,580 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -11.0% | 2 |
| Mar 31, 2020 | 6358-06-001MMC - 635806001 | Taylor Abilene |
MATERIALS ONLY: EMULSIONIH 20 · | $24,720 | $26,640 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +7.8% | 2 |
| Mar 31, 2020 | 6358-02-001MMC - 635802001 | Haskell Abilene |
MATERIALS ONLY: FLEXIBLE BASEUS 380 · | $3,818 | $4,800 | ZACK BURKETT CO. | +25.7% | 2 |
| Mar 26, 2020 | 6356-95-001RMC - 635695001 | Jefferson Beaumont |
SUMP PUMP CLEANINGSH 347 · | $78,875 | $82,752 | AIMS COMPANIES | +4.9% | 1 |
| Mar 25, 2020 | 6356-55-001MMC - 635655001 | Gonzales Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $292,500 | $292,500 | BRAUNTEX MATERIALS, INC. | 0.0% | 5 |
| Mar 25, 2020 | 6356-53-001MMC - 635653001 | De Witt Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 87 · | $298,200 | $289,800 | BRAUNTEX MATERIALS, INC. | -2.8% | 5 |
| Mar 25, 2020 | 6356-57-001MMC - 635657001 | Fayette Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $294,800 | $286,000 | QUALITY HOT MIX, INC. | -3.0% | 5 |
| Mar 25, 2020 | 6356-60-001MMC - 635660001 | Wharton Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 59 · | $292,500 | $279,000 | QUALITY HOT MIX, INC. | -4.6% | 4 |
| Mar 25, 2020 | 6356-56-001MMC - 635656001 | Lavaca Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 77 · | $299,200 | $277,200 | QUALITY HOT MIX, INC. | -7.4% | 4 |
| Mar 25, 2020 | 6356-19-001MMC - 635619001 | Victoria Yoakum |
AGGREGATES FOR SURFACE TREATMENTS (MATERIAL ONLY)US 59 · | $298,050 | $272,915 | QUALITY HOT MIX, INC. | -8.4% | 3 |
| Mar 25, 2020 | 6356-62-001MMC - 635662001 | Austin Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $296,700 | $270,900 | QUALITY HOT MIX, INC. | -8.7% | 4 |
| Mar 25, 2020 | 6349-88-001RMC - 634988001 | Culberson El Paso |
METAL BEAM GUARDRAIL REPAIRIH 10 · | $213,835 | $266,840 | SYNERGY PROJECT CONTRACTORS, INC. | +24.8% | 3 |
| Mar 25, 2020 | 6356-52-001MMC - 635652001 | Colorado Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $299,200 | $264,000 | QUALITY HOT MIX, INC. | -11.8% | 4 |
| Mar 25, 2020 | 6356-20-001MMC - 635620001 | Fayette Yoakum |
AGGREGATES FOR SURFACE TREATMENTS (MATERIAL ONLY)IH 10 · | $294,000 | $252,915 | COLORADO MATERIALS, LTD. | -14.0% | 3 |
| Mar 25, 2020 | 6349-85-001RMC - 634985001 | Culberson El Paso |
BARRICADES, SIGNS, TRAFFIC CONTROLIH 10 · | $213,305 | $240,350 | APACHE BARRICADE & SIGN | +12.7% | 3 |
| Mar 25, 2020 | 6353-43-001RMC - 635343001 | Nacogdoches Lufkin |
FOG SEALUS 59 · | $202,249 | $220,849 | CLARK CONSTRUCTION OF TEXAS, INC. | +9.2% | 4 |
| Mar 25, 2020 | 6356-21-001MMC - 635621001 | Wharton Yoakum |
AGGREGATES FOR SURFACE TREATMENTS (MATERIAL ONLY)US 59 · | $231,900 | $198,000 | QUALITY HOT MIX, INC. | -14.6% | 3 |
| Mar 25, 2020 | 6353-44-001RMC - 635344001 | Angelina Lufkin |
DITCH AND CULVERT CLEANINGUS 59 · | $244,785 | $189,358 | TEXAS DRAINAGE INC. | -22.6% | 3 |
| Mar 25, 2020 | 6356-61-001MMC - 635661001 | Matagorda Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)SH 35 · | $149,600 | $145,200 | QUALITY HOT MIX, INC. | -2.9% | 4 |
| Mar 25, 2020 | 6356-58-001MMC - 635658001 | Calhoun Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)SH 35 · | $147,400 | $138,600 | QUALITY HOT MIX, INC. | -6.0% | 4 |
| Mar 25, 2020 | 6356-54-001MMC - 635654001 | Jackson Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 59 · | $149,600 | $136,400 | QUALITY HOT MIX, INC. | -8.8% | 4 |
| Mar 25, 2020 | 6356-59-001MMC - 635659001 | Victoria Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 59 · | $140,000 | $120,000 | QUALITY HOT MIX, INC. | -14.3% | 4 |
| Mar 25, 2020 | 6356-18-001MMC - 635618001 | De Witt Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)US 87 · | $60,000 | $40,500 | QUALITY HOT MIX, INC. | -32.5% | 5 |
| Mar 25, 2020 | 6357-64-001MMC - 635764001 | Wharton Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)US 59 · | $36,000 | $21,060 | QUALITY HOT MIX, INC. | -41.5% | 4 |
| Mar 25, 2020 | 6356-33-001MMC - 635633001 | Gonzales Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)IH 10 · | $40,000 | $20,680 | COLORADO MATERIALS, LTD. | -48.3% | 5 |
| Mar 25, 2020 | 6357-66-001MMC - 635766001 | Austin Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)IH 10 · | $31,200 | $19,440 | QUALITY HOT MIX, INC. | -37.7% | 3 |
| Mar 25, 2020 | 6356-32-001MMC - 635632001 | Jackson Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)US 59 · | $22,500 | $15,500 | QUALITY HOT MIX, INC. | -31.1% | 3 |
| Mar 25, 2020 | 6357-65-001MMC - 635765001 | Matagorda Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)SH 35 · | $18,000 | $12,105 | QUALITY HOT MIX, INC. | -32.8% | 4 |
| Mar 25, 2020 | 6357-63-001MMC - 635763001 | Victoria Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)US 59 · | $12,500 | $8,000 | QUALITY HOT MIX, INC. | -36.0% | 4 |
| Mar 25, 2020 | 6356-17-001MMC - 635617001 | Colorado Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)IH 10 · | $10,500 | $7,425 | QUALITY HOT MIX, INC. | -29.3% | 3 |
| Mar 25, 2020 | 6356-34-001MMC - 635634001 | Lavaca Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)US 77 · | $10,000 | $7,075 | QUALITY HOT MIX, INC. | -29.3% | 4 |
| Mar 25, 2020 | 6357-62-001MMC - 635762001 | Fayette Yoakum |
FLEXIBLE BASE (MATERIAL ONLY)IH 10 · | $10,000 | $7,068 | COLORADO MATERIALS, LTD. | -29.3% | 4 |
| Mar 23, 2020 | 6355-18-001MMC - 635518001 | Potter Amarillo |
DE-ICER/ANTI-ICING (MATERIALS ONLY)IH 40 · | $297,000 | $366,085 | UNITED SALT CORPORATION | +23.3% | 1 |
| Mar 23, 2020 | 6357-05-001MMC - 635705001 | Moore Amarillo |
LIMESTONE ROCK ASPHALT (MATERIALS ONLY)US 87 · | $284,750 | $272,448 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.3% | 1 |
| Mar 23, 2020 | 6356-10-001MMC - 635610001 | Dallam Amarillo |
DENSE-GRADED HOT-MIX ASPHALT (MATERIALS ONLY)US 54 · | $255,000 | $261,000 | L A FULLER & SONS CONSTRUCTION, LTD. | +2.4% | 2 |
| Mar 23, 2020 | 6356-06-001MMC - 635606001 | Moore Amarillo |
DENSE-GRADED HOT MIX ASPHALT (MATERIALS ONLY)US 87 · | $255,000 | $255,000 | L A FULLER & SONS CONSTRUCTION, LTD. | 0.0% | 3 |
| Mar 23, 2020 | 6358-24-001MMC - 635824001 | Armstrong Amarillo |
DENSE-GRADE HOT-MIX ASPHALT(MATERIALS ONLY)US 287 · | $255,000 | $212,250 | RK HALL, LLC | -16.8% | 4 |
| Mar 23, 2020 | 6357-06-001MMC - 635706001 | Gray Amarillo |
LIMESTONE ROCK ASPHALT (MATERIALS ONLY)US 60 · | $172,125 | $169,415 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.6% | 1 |
| Mar 23, 2020 | 6358-27-001MMC - 635827001 | Hartley Amarillo |
FLEXIBLE BASE (MATERIALS ONLY)FM 2577 · | $133,750 | $149,750 | J. LEE MILLIGAN, INC. | +12.0% | 3 |
| Mar 23, 2020 | 6357-04-001MMC - 635704001 | Potter Amarillo |
LIMESTONE ROCK ASPHALT (MATERIALS ONLY)IH 40 · | $132,000 | $134,428 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.8% | 1 |
| Mar 23, 2020 | 6357-18-001RMC - 635718001 | Brewster El Paso |
PICNIC AREA AND LANDSCAPE MAINTENANCEUS 90 · | $84,490 | $94,320 | MIJELUM, L.L.C. | +11.6% | 1 |
| Mar 23, 2020 | 6357-25-001RMC - 635725001 | Presidio El Paso |
PICNIC AREA & LITTER BARREL MAINTENANCEUS 90 · | $72,900 | $65,901 | CM COMPANY | -9.6% | 2 |
| Mar 23, 2020 | 6357-26-001RMC - 635726001 | Jeff Davis El Paso |
PICNIC AREA & LITTER BARREL MAINTENANCESH 118 · | $46,900 | $38,801 | CM COMPANY | -17.3% | 2 |
| Mar 20, 2020 | 6355-95-001MMC - 635595001 | Lubbock Lubbock |
PURCHASE OF MATERIAL CUTBACK ASPHALTSIH 27 · | $295,500 | $223,250 | MARTIN RESOURCE MANAGEMENT CORPORATION | -24.5% | 2 |
| Mar 20, 2020 | 6345-88-001RMC - 634588001 | Hale Lubbock |
DRAINAGE STRUCTUREFM 789 · | $157,888 | $209,325 | NELMS SERVICES, INC. | +32.6% | 3 |
| Mar 19, 2020 | 6355-56-001MMC - 635556001 | Delta Paris |
DENSE GRADE HOT MIX - MATERIALS ONLYSH 24 · | $245,000 | $262,500 | RK HALL, LLC | +7.1% | 1 |
| Mar 19, 2020 | 6357-07-001RMC - 635707001 | Hopkins Paris |
ON CALL DITCH AND CULVERT CLEANINGSH 19 · | $276,825 | $255,510 | ANCHOR CONTRACTING, LLC | -7.7% | 3 |
| Mar 19, 2020 | 6357-27-001RMC - 635727001 | Hunt Paris |
ON CALL TREE TRIMMINGSH 34 · | $245,800 | $230,541 | NATIVE ECOLOGY SEEDING & TURF LLC | -6.2% | 5 |
| Mar 19, 2020 | 6355-51-001MMC - 635551001 | Red River Paris |
DENSE GRADE HOT MIX - MATERIALS ONLYUS 82 · | $245,000 | $211,750 | RK HALL, LLC | -13.6% | 2 |
| Mar 19, 2020 | 6355-54-001MMC - 635554001 | Lamar Paris |
DENSE GRADE HOT MIX - MATERIALS ONLYBU 271B · | $245,000 | $211,750 | RK HALL, LLC | -13.6% | 3 |
| Mar 19, 2020 | 6355-55-001MMC - 635555001 | Grayson Paris |
DENSE GRADE HOT MIX - MATERIALS ONLYUS 75 · | $252,000 | $210,000 | RK HALL, LLC | -16.7% | 2 |
| Mar 19, 2020 | 6353-27-001BPM - 635327001 | Hopkins Paris |
BPM-CONCRETE BEAM AND STRUCTURE REPAIRIH 30 · | $261,622 | $182,140 | GIBSON & ASSOCIATES, INC. | -30.4% | 9 |
| Mar 19, 2020 | 6347-62-001BPM - 634762001 | Lamar Paris |
RIPRAP/EROSION REPAIRFM 137 · | $177,717 | $167,089 | LELAND & BRADLEE CONSTRUCTION, INC. | -6.0% | 6 |
| Mar 18, 2020 | 6357-38-001MMC - 635738001 | Tom Green San Angelo |
PURCHASE OF EMULSION FOR DISTRICTSH 208 · | $256,101 | $265,050 | ERGON ASPHALT & EMULSIONS, INC. | +3.5% | 1 |
| Mar 17, 2020 | 6352-81-001RMC - 635281001 | Bexar San Antonio |
RETAINING WALL RAIL RETROFITFM 1560 · | $284,489 | $370,997 | DAN WILLIAMS COMPANY | +30.4% | 2 |
| Mar 17, 2020 | 6356-77-001RMC - 635677001 | Bexar San Antonio |
PREVENTIVE MAINT OF TRAFFIC SIGNALSIH 35 · | $273,527 | $280,140 | E-Z BEL CONSTRUCTION, LLC | +2.4% | 1 |
| Mar 17, 2020 | 6352-36-001RMC - 635236001 | San Patricio Corpus Christi |
DITCH CLEANING & DRAINAGE IMPROVEMENTSUS 181 · | $291,409 | $262,989 | TIERRA LEASE SERVICE, LLC | -9.8% | 5 |
| Mar 17, 2020 | 6359-83-001RMC - 635983001 | Nueces Corpus Christi |
ILLUMINATION MAINTENANCESH 286 · | $258,758 | $221,160 | VACA UNDERGROUND UTILITIES INC | -14.5% | 4 |
| Mar 17, 2020 | 6357-93-001RMC - 635793001 | Medina San Antonio |
REPLACE CULVERTFM 2676 · | $206,474 | $169,840 | TIERRA LEASE SERVICE, LLC | -17.7% | 7 |
| Mar 16, 2020 | 6357-96-001MMC - 635796001 | Guadalupe San Antonio |
PURCHASE AND DELIVERY OF LRAIH 10 · | $217,775 | $220,940 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.5% | 1 |
| Mar 16, 2020 | 6354-98-001MMC - 635498001 | Medina San Antonio |
MATERIAL ONLY EMULSIONUS 90 · | $120,000 | $128,640 | MARTIN RESOURCE MANAGEMENT CORPORATION | +7.2% | 3 |
| Mar 13, 2020 | 6355-25-001RMC - 635525001 | Harris Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSL 8 · | $263,913 | $257,660 | E.V.G. ENTERPRISE | -2.4% | 2 |
| Mar 13, 2020 | 6353-70-001RMC - 635370001 | Waller Houston |
MOWING HIGHWAY RIGHT OF WAYUS 290 · | $248,340 | $198,088 | MLR SERVICES, LLC | -20.2% | 6 |
| Mar 13, 2020 | 6352-78-001RMC - 635278001 | Montgomery Houston |
BRIDGE REPAIRSH 105 · | $200,428 | $177,150 | ARANDA BROTHERS CONSTRUCTION CO., INC. | -11.6% | 6 |
| Mar 13, 2020 | 6356-82-001RMC - 635682001 | Harris Houston |
REPAIR STEEL BRIDGE MEMBERSIH 10 · | $185,942 | $174,426 | GIBSON & ASSOCIATES, INC. | -6.2% | 5 |
| Mar 11, 2020 | 6353-79-001MMC - 635379001 | Sabine Lufkin |
MATERIAL ONLY, HOTMIXUS 96 · | $252,000 | $269,500 | EAST TEXAS ASPHALT CO., LTD. | +6.9% | 1 |
| Mar 11, 2020 | 6357-24-001MMC - 635724001 | Wichita Wichita Falls |
DE-ICING ANTI-ICING_(MATERIALS ONLY)US 287 · | $166,750 | $132,380 | GMCO COMMODITIES CORPORATION | -20.6% | 1 |
| Mar 10, 2020 | 6354-89-001RMC - 635489001 | Collin Dallas |
CULVERT CLEANING & DITCH MAINTENANCEUS 380 · | $276,757 | $290,942 | SHALOM SERVICES CORPORATION | +5.1% | 4 |
| Mar 10, 2020 | 6353-92-001RMC - 635392001 | Collin Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 380 · | $117,891 | $166,515 | IBCTX, LLC | +41.2% | 3 |
| Mar 10, 2020 | 6354-60-001RMC - 635460001 | Navarro Dallas |
SPECIALTY MARKINGSSH 31 · | $92,233 | $89,547 | TOTAL HIGHWAY MAINTENANCE, LLC | -2.9% | 2 |
| Mar 10, 2020 | 6355-92-001MMC - 635592001 | Midland Odessa |
EMULSION MATERIAL ONLYIH 20 · | $96,000 | $87,000 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -9.4% | 2 |
| Mar 10, 2020 | 6355-94-001MMC - 635594001 | Pecos Odessa |
EMULSION MATERIALS ONLYIH 10 · | $75,000 | $70,500 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -6.0% | 2 |
| Mar 10, 2020 | 6355-93-001MMC - 635593001 | Ector Odessa |
EMULSION MATERIALS ONLYSL 338 · | $60,000 | $56,400 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -6.0% | 2 |
| Mar 10, 2020 | 6357-42-001MMC - 635742001 | Kimble San Angelo |
PURCHASE OF MC800 MEDIUM CURE ASPHALTUS 377 · | $45,828 | $47,880 | MARTIN RESOURCE MANAGEMENT CORPORATION | +4.5% | 2 |
| Mar 10, 2020 | 6357-12-001MMC - 635712001 | Tom Green San Angelo |
PURCHASE OF FLEXIBLE BASE (MATERIAL ONLY)SH 208 · | $46,155 | $35,250 | ALLEN KELLER COMPANY | -23.6% | 1 |
| Mar 5, 2020 | 0229-03-037NH 2019(822) | Crane Odessa |
WIDEN TO 4-LANEUS 385 · | $32,697,334 | $36,634,908 | DELHUR INDUSTRIES, INC. | +12.0% | 2 |
| Mar 5, 2020 | 0228-06-081NH 2020(649) | Ector Odessa |
CONSTRUCT NEW INTERCHANGEUS 385 · | $19,310,814 | $25,331,612 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +31.2% | 2 |
| Mar 5, 2020 | 0471-02-070NH 1902(251) | Hays Austin |
PROVIDE SUPER 2 PASSING LANESSH 21 · | $17,722,518 | $17,392,024 | HUNTER INDUSTRIES, LTD. | -1.9% | 4 |
| Mar 5, 2020 | 0030-05-069BR 2020(634) | Hemphill Amarillo |
REPLACE EXISTING BRIDGESUS 83 · | $16,798,303 | $16,941,870 | WEBBER, LLC | +0.9% | 5 |
| Mar 5, 2020 | 2410-01-011STP 2020(653) | Tom Green San Angelo |
REHABILITATION OF EXISTING ROADWAYFM 2105 · | $18,364,640 | $16,563,814 | REECE ALBERT, INC. | -9.8% | 2 |
| Mar 5, 2020 | 0246-02-050STP 2020(497) | Panola Atlanta |
WIDENING, CMT TREAT SUBGRADE, ACP SURFACE AND PMUS 79 · | $14,992,432 | $13,343,182 | A. L. HELMCAMP, INC. | -11.0% | 4 |
| Mar 5, 2020 | 0366-05-048NH 2020(616) | Wilson San Antonio |
CONSTR NB PASSING LNS; BASE REPAIR, SC & OVERLAYSH 123 · | $13,266,755 | $12,527,098 | ANGEL BROTHERS HOLDINGS CORP. | -5.6% | 5 |
| Mar 5, 2020 | 0314-01-085NH 2020(825) | Parker Fort Worth |
CENTER CABLE BARRIERIH 20 · | $8,764,943 | $7,498,891 | GRATIOT CONSTRUCTION, LTD. | -14.4% | 4 |
| Mar 5, 2020 | 0200-14-089NH 2020(592) | Jefferson Beaumont |
OV - OVERLAYUS 69 · | $5,330,697 | $6,712,910 | TEXAS MATERIALS GROUP, INC. | +25.9% | 3 |
| Mar 5, 2020 | 0081-13-066NH 2020(808) | Denton Dallas |
MILL & OVERLAY, PAVEMENT REPAIR AND MARKINGSIH 35W · | $5,811,602 | $5,910,402 | TEXAS MATERIALS GROUP, INC. | +1.7% | 2 |
| Mar 5, 2020 | 1124-03-012STP 2020(617)HESG | Cherokee Tyler |
SUBGRADE WDN, ACP BS, OCST, ACP SURF, STRS, MBGF,FM 241 · | $5,620,911 | $5,515,688 | A. L. HELMCAMP, INC. | -1.9% | 6 |
| Mar 5, 2020 | 0024-08-135NH 2020(676) | Bexar San Antonio |
BASE REPAIR, MILL, INLAY & PV MRKS ON FRONTAGE RDSUS 90 · | $5,061,247 | $4,775,401 | ANGEL BROTHERS HOLDINGS CORP. | -5.6% | 5 |
| Mar 5, 2020 | 0492-03-036STP 2020(615) | Wood Tyler |
REPAIR & RESURFACE ROADWAYFM 14 · | $4,674,054 | $4,511,806 | EAST TEXAS BRIDGE, INC. | -3.5% | 4 |
| Mar 5, 2020 | 6353-17-001RMC - 635317001 | Travis Austin |
ASPHALTIC PAVEMENT REPAIRSIH 35 · | $2,824,700 | $3,486,391 | AUSTIN MATERIALS, LLC | +23.4% | 4 |
| Mar 5, 2020 | 1352-01-021STP 2020(632) | Montague Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 677 · | $2,901,997 | $3,163,722 | JAGOE-PUBLIC COMPANY | +9.0% | 6 |
| Mar 5, 2020 | 6355-29-001RMC - 635529001 | Andrews Odessa |
MILL AND INLAYSH 115 · | $1,995,857 | $3,006,934 | FNH CONSTRUCTION, LLC | +50.7% | 3 |
| Mar 5, 2020 | 0912-72-348BR 2018(113) | Harris Houston |
REPLACE BRIDGES AND APPROACHESCS · | $2,902,453 | $2,898,014 | ARANDA BROTHERS CONSTRUCTION CO., INC. | -0.2% | 5 |
| Mar 5, 2020 | 0747-03-081NH 2020(662) | Tarrant Fort Worth |
RESURFACE ROADWAYFM 157 · | $3,152,325 | $2,691,549 | PEACHTREE CONSTRUCTION, LTD. | -14.6% | 5 |
| Mar 5, 2020 | 0500-03-640NH 2020(663) | Harris Houston |
REHABILITATION OF EXISTING ROADIH 45 · | $4,028,131 | $2,587,343 | MAIN LANE INDUSTRIES LTD. | -35.8% | 3 |
| Mar 5, 2020 | 0908-00-096STP 2020(585) | Taylor Abilene |
STRIPING RETRACE PROJECTVA · | $2,508,260 | $1,998,097 | L&L COMPANY | -20.3% | 8 |
| Mar 5, 2020 | 1350-01-024C 1350-1-24 | Clay Wichita Falls |
PAVEMENT REPAIR AND OVERLAYFM 1197 · | $2,126,308 | $1,945,127 | JAGOE-PUBLIC COMPANY | -8.5% | 7 |
| Mar 5, 2020 | 0914-18-114BR 2020(714) | Bastrop Austin |
BRIDGE REPLACEMENTCS · | $1,032,269 | $1,454,554 | CHASCO CONSTRUCTORS | +40.9% | 4 |
| Mar 5, 2020 | 1206-01-019BR 2020(673) | Live Oak Corpus Christi |
REPLACE BRIDGES AND APPROACHESFM 1358 · | $1,371,638 | $1,425,038 | LISKA CONSTRUCTION COMPANY, INC. | +3.9% | 8 |
| Mar 5, 2020 | 6354-42-001RMC - 635442001 | Galveston Houston |
MILL,OVERLAY,PAVEMENT MARKINGS,STRIPINGFM 518 · | $859,438 | $1,249,935 | ANGEL BROTHERS HOLDINGS CORP. | +45.4% | 2 |
1–100 of 180Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.