87Let jobs
$564,310,453Total low bids
$603,792,881Total estimates
-6.5%Low bids vs estimates
Sep 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Sep 6, 2019 | 0047-02-150NH 2020(008) | Grayson Paris |
RECONSTRUCT AND WIDENING FROM 4-LN TO 6-LNUS 75 · | $177,015,847 | $162,975,177 | ZACHRY CONSTRUCTION CORPORATION | -7.9% | 6 |
| Sep 6, 2019 | 0188-02-029NH 1902(002) | Fort Bend Houston |
WIDEN NON-FREEWAY FROM TWO TO FOUR LANESSH 36 · | $87,914,194 | $81,760,171 | PULICE CONSTRUCTION, INC. | -7.0% | 5 |
| Sep 6, 2019 | 0188-02-036STP 2020(056)MM | Fort Bend Houston |
WIDEN NON FREEWAY FROM TWO TO FOUR LANESSH 36 · | $49,337,048 | $42,315,989 | PULICE CONSTRUCTION, INC. | -14.2% | 5 |
| Sep 6, 2019 | 1258-04-065STP 2017(976)TP | Harris Houston |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREFM 1093 · | $12,182,875 | $12,691,073 | HARPER BROTHERS CONSTRUCTION LLC | +4.2% | 3 |
| Sep 6, 2019 | 0126-01-039STP 2020(029) | Shackelford Abilene |
MILL, OVERLAY AND SAFETYSH 6 · | $16,543,962 | $12,663,688 | A. L. HELMCAMP, INC. | -23.5% | 5 |
| Sep 6, 2019 | 0198-01-031NH 2020(009) | Henderson Tyler |
SHLDR WIDEN, GRADING, PVT, DRNG, SIGNS, PV MKUS 175 · | $13,306,824 | $12,138,163 | REYNOLDS & KAY, LTD. | -8.8% | 4 |
| Sep 6, 2019 | 0003-06-094NH 2020(014) | Reeves Odessa |
SEAL COAT FRONTAGE ROADSIH 20 · | $9,999,485 | $7,919,243 | RONALD R. WAGNER & CO., LP | -20.8% | 2 |
| Sep 6, 2019 | 0004-01-034STP 2020(015) | Ward Odessa |
CRUMB RUBBER SEALBI 20-B · | $7,273,408 | $6,651,324 | BRANNAN PAVING CO., LTD. | -8.6% | 3 |
| Sep 6, 2019 | 0089-19-011NH 2020(043) | Victoria Yoakum |
MILL AND INLAYBU 59-T · | $3,570,485 | $3,807,959 | HUNTER INDUSTRIES, LTD. | +6.7% | 2 |
| Sep 6, 2019 | 3097-02-016NH 2020(077) | Hidalgo Pharr |
SEAL COATFM 396 · | $4,489,096 | $3,726,802 | BRANNAN PAVING CO., LTD. | -17.0% | 3 |
| Sep 6, 2019 | 0517-10-019STP 2020(075) | Jim Hogg Pharr |
SEAL COATSH 16 · | $4,777,994 | $3,674,000 | BRANNAN PAVING CO., LTD. | -23.1% | 3 |
| Sep 6, 2019 | 0271-09-024STP 2020(024) | Waller Houston |
BASE REPAIR, PLANING, SEAL COAT & 1.5" ACP OVERLAYUS 90 · | $3,560,621 | $3,290,507 | DURWOOD GREENE CONSTRUCTION CO. | -7.6% | 3 |
| Sep 6, 2019 | 2717-02-010NH 2020(176) | Cameron Pharr |
SEALCOATS AND PAVEMENT MARKINGSFM 3248 · | $4,496,063 | $3,226,291 | BRANNAN PAVING CO., LTD. | -28.2% | 2 |
| Sep 6, 2019 | 6343-35-001RMC - 634335001 | Cameron Pharr |
DISTRICT WIDE SEAL COATFM 800 · | $3,238,213 | $3,124,059 | BRANNAN PAVING CO., LTD. | -3.5% | 3 |
| Sep 6, 2019 | 0115-04-054STP 2020(045) | Bastrop Austin |
SEAL COATFM 20 · | $2,878,541 | $2,735,017 | ANGEL BROTHERS HOLDINGS CORP. | -5.0% | 5 |
| Sep 6, 2019 | 0027-04-041STP 1902(164)HES | Wharton Yoakum |
SAFETY TREAT FIXED OBJECTSUA 90 · | $1,726,963 | $2,611,509 | HUNTER INDUSTRIES, LTD. | +51.2% | 1 |
| Sep 6, 2019 | 0373-02-001BR 2020(037) | Nueces Corpus Christi |
BRIDGE MAINTENANCESH 44 · | $2,748,720 | $2,419,992 | OLYMPUS PAINTING CONTRACTORS, INC. | -12.0% | 4 |
| Sep 6, 2019 | 1009-02-018BR 2020(031) | Wilson San Antonio |
BRIDGE REPLACEMENTFM 537 · | $1,805,142 | $2,029,110 | ANGEL BROTHERS HOLDINGS CORP. | +12.4% | 6 |
| Sep 6, 2019 | 0914-33-078STP 2019(348)TAPS | Hays Austin |
GRADING, CONCRETE PAVING & STRUCTURESVA · | $2,114,435 | $1,519,610 | SB CONTRACTORS LLC | -28.1% | 4 |
| Sep 6, 2019 | 6348-31-001RMC - 634831001 | Frio San Antonio |
CALL OUT TRAFFIC CONTROLIH 35 · | $1,349,625 | $1,298,048 | ELITE CASTLE RESOURCES LLC | -3.8% | 5 |
| Sep 6, 2019 | 6349-12-001RMC - 634912001 | Nacogdoches Lufkin |
ON-CALL TRAFFIC CONTROL SERVICESUS 59 · | $1,414,100 | $1,293,555 | AREA WIDE PROTECTIVE, INC. | -8.5% | 3 |
| Sep 6, 2019 | 6345-66-001RMC - 634566001 | Jefferson Beaumont |
FULL DEPTH CONCRETE PAVEMENT REPAIRIH 10 · | $1,087,592 | $1,175,200 | TALBRAN ENTERPRISES LLC | +8.1% | 3 |
| Sep 6, 2019 | 1087-01-014STP 2020(040)HES | Jim Wells Corpus Christi |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 738 · | $1,022,958 | $1,150,495 | J. CARROLL WEAVER, INC. | +12.5% | 5 |
| Sep 6, 2019 | 0913-00-106STP 2020(044) | De Witt Yoakum |
PAVEMENT MARKINGSVA · | $1,254,370 | $1,107,842 | TRP CONSTRUCTION GROUP, LLC | -11.7% | 3 |
| Sep 6, 2019 | 0901-19-193STP 2019(786)TAPS | Grayson Paris |
BICYCLE INFRASTRUCTURE IMPROVEMENTSVA · | $900,680 | $1,074,743 | HIGHWAY 19 CONSTRUCTION LLC | +19.3% | 4 |
| Sep 6, 2019 | 6348-16-001RMC - 634816001 | Hidalgo Pharr |
HOT POUR CRACK SEALIH 2 · | $847,975 | $949,553 | CHAMPION INFRASTRUCTURE, LLC | +12.0% | 2 |
| Sep 6, 2019 | 6344-01-001RMC - 634401001 | Tyler Beaumont |
MILL & OVERLAYFM 92 · | $888,254 | $921,180 | TEXAS MATERIALS GROUP, INC. | +3.7% | 2 |
| Sep 6, 2019 | 6346-82-001RMC - 634682001 | Dallas Dallas |
POTHOLE REPAIRUS 80 · | $714,050 | $836,500 | DBI SERVICES, LLC | +17.1% | 2 |
| Sep 6, 2019 | 0543-03-076STP 2020(026) | Fort Bend Houston |
BASE REPAIR, PLANING AND 2" ACP OVERLAYFM 762 · | $759,186 | $791,784 | ANGEL BROTHERS HOLDINGS CORP. | +4.3% | 3 |
| Sep 6, 2019 | 6346-09-001RMC - 634609001 | Fort Bend Houston |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)US 59 · | $667,923 | $789,329 | PROFESSIONAL TRAFFIC CONTROL LLC | +18.2% | 4 |
| Sep 6, 2019 | 6337-05-001BPM - 633705001 | San Augustine Lufkin |
BRIDGE PREVENTATIVE MAINTENANCEUS 96 · | $678,285 | $718,542 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | +5.9% | 6 |
| Sep 6, 2019 | 6345-33-001RMC - 634533001 | Orange Beaumont |
CLEAN/SEAL EXISTING RIGID CONC PVMT JTS & CRACKSSH 87 · | $402,626 | $612,412 | SCR CIVIL CONSTRUCTION, LLC | +52.1% | 1 |
| Sep 6, 2019 | 6344-64-001RMC - 634464001 | Hardin Beaumont |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 69 · | $688,261 | $607,253 | TEXAS MATERIALS GROUP, INC. | -11.8% | 3 |
| Sep 6, 2019 | 6349-10-001RMC - 634910001 | Kimble San Angelo |
METAL BEAM GUARDFENCE REPAIR/UPGRADEIH 10 · | $575,200 | $578,510 | T&L CLEANING SERVICES LLC | +0.6% | 4 |
| Sep 6, 2019 | 6344-77-001RMC - 634477001 | Dallas Dallas |
ON-CALL TRAFFIC CONTROL SERVICESIH 20 · | $478,189 | $577,271 | TOTAL HIGHWAY MAINTENANCE, LLC | +20.7% | 5 |
| Sep 6, 2019 | 6348-26-001RMC - 634826001 | Harrison Atlanta |
TREE & STUMP REMOVAL (S)US 59 · | $454,500 | $554,654 | CROSS PLUS CONSTRUCTION, LLC | +22.0% | 3 |
| Sep 6, 2019 | 6349-13-001RMC - 634913001 | Polk Lufkin |
ON-CALL TRAFFIC CONTROL SERVICESUS 59 · | $558,130 | $520,270 | AREA WIDE PROTECTIVE, INC. | -6.8% | 3 |
| Sep 6, 2019 | 6348-27-001RMC - 634827001 | Upshur Atlanta |
TREE AND STUMP REMOVAL (W)US 259 · | $547,500 | $482,054 | CATOCON, INC. | -12.0% | 4 |
| Sep 6, 2019 | 6330-15-001RMC - 633015001 | Panola Atlanta |
CULVERT REPLACEMENT - DISTRICTWIDEFM 31 · | $412,476 | $472,593 | SJ&J CONSTRUCTION, LLC | +14.6% | 4 |
| Sep 6, 2019 | 6342-32-001RMC - 634232001 | El Paso El Paso |
CRACK SEALSL 375 · | $583,310 | $469,664 | CHAMPION INFRASTRUCTURE, LLC | -19.5% | 4 |
| Sep 6, 2019 | 6348-12-001RMC - 634812001 | Medina San Antonio |
CRACK SEALINGUS 90 · | $361,000 | $401,120 | CHAMPION INFRASTRUCTURE, LLC | +11.1% | 5 |
| Sep 6, 2019 | 6343-30-001RMC - 634330001 | Culberson El Paso |
CRACK SEALIH 10 · | $352,650 | $344,856 | D & M CONTRACTORS, LLC | -2.2% | 3 |
| Sep 6, 2019 | 0911-38-071STP 2019(183) | Angelina Lufkin |
LANDSCAPING_IN VARIOUS LOCATIONSVA · | $159,261 | $324,634 | COX CONCRETE CONTRACTORS, INCORPORATED | +103.8% | 1 |
| Sep 6, 2019 | 6348-25-001RMC - 634825001 | Bowie Atlanta |
TREE & STUMP REMOVAL (N)IH 30 · | $305,500 | $316,004 | CATOCON, INC. | +3.4% | 3 |
| Sep 6, 2019 | 1068-01-215NH 1902(231) | Tarrant Fort Worth |
REHAB OF EXISTING ROADWAYIH 30 · | $339,716 | $314,035 | SELECT STRIPING LLC | -7.6% | 6 |
| Sep 6, 2019 | 6345-12-001RMC - 634512001 | Webb Laredo |
CLEANING AND CRACK SEALING OF HIGHWAYSIH 35 · | $356,113 | $274,230 | D & M CONTRACTORS, LLC | -23.0% | 2 |
| Sep 6, 2019 | 6345-13-001RMC - 634513001 | Val Verde Laredo |
CLEANING AND CRACK SEALING OF HIGHWAYSUS 277 · | $316,724 | $274,180 | D & M CONTRACTORS, LLC | -13.4% | 2 |
| Sep 5, 2019 | 0188-03-019STP 2020(057)MM | Brazoria Houston |
WIDEN NON-FREEWAY FROM TWO TO FOUR LANESSH 36 · | $81,323,903 | $75,955,686 | PULICE CONSTRUCTION, INC. | -6.6% | 5 |
| Sep 5, 2019 | 0213-06-044STP 2020(020) | Tyler Beaumont |
SEAL COATUS 190 · | $11,079,889 | $12,309,357 | CLARK CONSTRUCTION OF TEXAS, INC. | +11.1% | 1 |
| Sep 5, 2019 | 0867-02-019STP 2020(005) | Coryell Waco |
PREVENTATIVE MAINTENANCEFM 932 · | $9,377,107 | $8,847,137 | F. N. PLOCH CONSTRUCTION COMPANY, INC. | -5.7% | 4 |
| Sep 5, 2019 | 0138-05-057NH 2020(002) | Rusk Tyler |
PLANING, BS RPR, ACP BS, OCST, PFC SUR, MBGF,PV MKUS 259 · | $7,461,518 | $7,308,695 | MADDEN CONTRACTING COMPANY, LLC. | -2.0% | 3 |
| Sep 5, 2019 | 1912-01-021BR 2020(027) | Montgomery Houston |
BRIDGE REPLACEMENTFM 2090 · | $5,436,269 | $6,264,644 | JAMES CONSTRUCTION GROUP, L.L.C. | +15.2% | 6 |
| Sep 5, 2019 | 6344-81-001RMC - 634481001 | Dallas Dallas |
GUARD FENCE & CABLE REPAIRUS 67 · | $6,512,605 | $5,695,050 | FIREMAN EXCAVATING, INC. | -12.6% | 3 |
| Sep 5, 2019 | 0007-01-062BR 2019(388) | Callahan Abilene |
BRIDGE MAINTENANCEIH 20 · | $3,639,411 | $5,575,722 | STATELINE CONSTRUCTION, LLC | +53.2% | 1 |
| Sep 5, 2019 | 0037-05-054NH 2020(067) | Dimmit Laredo |
SURF TREAT,PAV MARKSUS 83 · | $5,035,455 | $5,065,083 | RONALD R. WAGNER & CO., LP | +0.6% | 3 |
| Sep 5, 2019 | 0508-01-359NH 2020(025) | Harris Houston |
CONSTRUCT RAMPSIH 10 · | $4,114,790 | $4,637,319 | JAMES CONSTRUCTION GROUP, L.L.C. | +12.7% | 7 |
| Sep 5, 2019 | 6345-15-001RMC - 634515001 | Zavala Laredo |
SEAL COATUS 83 · | $4,283,618 | $4,077,239 | RONALD R. WAGNER & CO., LP | -4.8% | 3 |
| Sep 5, 2019 | 0027-03-073STP 2020(052) | Colorado Yoakum |
MILL AND INLAYFM 102 · | $4,807,776 | $3,987,941 | ANGEL BROTHERS HOLDINGS CORP. | -17.1% | 4 |
| Sep 5, 2019 | 0166-04-043STP 1902(154) | Leon Bryan |
CULVERT AND STORM DRAINAGE WORKSH 75 · | $2,780,999 | $3,722,169 | A. L. HELMCAMP, INC. | +33.8% | 4 |
| Sep 5, 2019 | 0920-00-125NH 2020(023) | Jefferson Beaumont |
TRAFFIC CONTROL DEVICESVA · | $2,202,704 | $2,849,217 | STRIPE-A-ZONE, INC. | +29.4% | 3 |
| Sep 5, 2019 | 0064-04-040STP 2020(032)HES | San Augustine Lufkin |
HIGHWAY IMPROVEMENTSH 21 · | $2,553,928 | $2,366,232 | STRIPE-A-ZONE, INC. | -7.3% | 5 |
| Sep 5, 2019 | 0911-00-077C 911-00-77 | Angelina Lufkin |
HIGHWAY IMPROVEMENTVA · | $2,709,823 | $2,351,740 | STRIPE-A-ZONE, INC. | -13.2% | 6 |
| Sep 5, 2019 | 6343-62-001RMC - 634362001 | Brown Brownwood |
PAVEMENT MARKING (WILL CALL AS NEEDED)US 377 · | $2,603,741 | $2,205,110 | TRP CONSTRUCTION GROUP, LLC | -15.3% | 5 |
| Sep 5, 2019 | 0006-03-133BR 2020(028) | Nolan Abilene |
REPLACE DECK AND APPROACHESIH 20 · | $1,324,105 | $1,863,849 | DCI CONTRACTING, INC. | +40.8% | 5 |
| Sep 5, 2019 | 0920-02-094BR 2019(760) | Liberty Beaumont |
BRIDGE REPLACEMENTCR · | $1,304,354 | $1,811,810 | TREVWAY, INC. | +38.9% | 4 |
| Sep 5, 2019 | 6347-55-001RMC - 634755001 | McLennan Waco |
SEAL COATFM 1858 · | $2,096,287 | $1,537,363 | F. N. PLOCH CONSTRUCTION COMPANY, INC. | -26.7% | 4 |
| Sep 5, 2019 | 6348-30-001RMC - 634830001 | Bexar San Antonio |
CALL OUT TRAFFIC CONTROLIH 10 · | $1,392,500 | $1,386,976 | AREA WIDE PROTECTIVE, INC. | -0.4% | 4 |
| Sep 5, 2019 | 2767-02-004BR 2020(012) | Garza Maintenance Division |
BRIDGE MAINTENANCE AND IMPROVEMENTFM 3519 · | $1,306,086 | $1,306,629 | BLACKSTONE CONCRETE VENTURES, LLC | +0.0% | 6 |
| Sep 5, 2019 | 6343-04-001RMC - 634304001 | Erath Fort Worth |
ROADSIDE MOWING AND HERBICIDEUS 377 · | $1,082,055 | $1,181,529 | CROSS PLUS CONSTRUCTION, LLC | +9.2% | 3 |
| Sep 5, 2019 | 0904-00-173STP 2020(047) | Potter Amarillo |
CRACK SEALVA · | $1,428,385 | $1,169,941 | D & M CONTRACTORS, LLC | -18.1% | 2 |
| Sep 5, 2019 | 0738-01-001BR 2020(039) | Refugio Corpus Christi |
BRIDGE MAINTENANCEFM 136 · | $1,149,023 | $1,136,958 | CHAMPION INFRASTRUCTURE, LLC | -1.1% | 4 |
| Sep 5, 2019 | 6345-83-001RMC - 634583001 | Harris Houston |
GUARDRAIL REPAIRIH 10 · | $1,014,424 | $1,108,705 | ROY JORGENSEN ASSOCIATES, INC. | +9.3% | 2 |
| Sep 5, 2019 | 6348-21-001RMC - 634821001 | Floyd |
DISTRICT WIDE PAVEMENT MARKINGSFM 3111 · | $1,002,335 | $1,068,136 | BARRICADES UNLIMITED | +6.6% | 7 |
| Sep 5, 2019 | 6347-52-001RMC - 634752001 | Harris Houston |
SWEEPING AND DEBRIS REMOVALIH 10 · | $1,002,015 | $859,671 | CEN-TEX IRRIGATION SYSTEMS, INC. | -14.2% | 4 |
| Sep 5, 2019 | 6340-55-001RMC - 634055001 | Lee Austin |
REPAIR DRAINAGE PIPESSH 21 · | $564,929 | $830,148 | SJ&J CONSTRUCTION, LLC | +46.9% | 4 |
| Sep 5, 2019 | 1603-03-037NH 1902(368) | Tarrant Fort Worth |
TRAFFIC CONTROL DEVICESFM 1709 · | $872,682 | $753,806 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | -13.6% | 4 |
| Sep 5, 2019 | 6346-95-001RMC - 634695001 | Grayson Paris |
ON CALL METAL BEAM GUARD FENCE REPAIRUS 82 · | $676,875 | $613,137 | MARCOM'S MOWING SERVICE, LLC | -9.4% | 3 |
| Sep 5, 2019 | 6349-11-001RMC - 634911001 | Guadalupe San Antonio |
DEBRIS REMOVALIH 10 · | $696,720 | $584,032 | K-BAR SERVICES, INC. | -16.2% | 3 |
| Sep 5, 2019 | 6344-76-001RMC - 634476001 | Dallas Dallas |
ON-CALL TRAFFIC CONTROL SERVICESIH 30 · | $486,677 | $524,251 | TOTAL HIGHWAY MAINTENANCE, LLC | +7.7% | 4 |
| Sep 5, 2019 | 6347-69-001RMC - 634769001 | Wichita Wichita Falls |
CRACK SEALING - HOT POURUS 281 · | $605,819 | $507,017 | D & M CONTRACTORS, LLC | -16.3% | 4 |
| Sep 5, 2019 | 6348-67-001RMC - 634867001 | Bexar San Antonio |
CLEANING AND SEALING CRACKSIH 35 · | $357,220 | $398,260 | CRACKSEAL OF TEXAS, LLC | +11.5% | 4 |
| Sep 5, 2019 | 6348-33-001RMC - 634833001 | Parmer Lubbock |
SMALL SIGN INSTALLATIONSH 214 · | $435,600 | $373,870 | TEXAS BLACKTOPS LLC | -14.2% | 10 |
| Sep 5, 2019 | 6345-44-001RMC - 634544001 | Navarro Dallas |
CLEANING AND RESHAPING DITCHESFM 85 · | $468,911 | $369,140 | TEXAS DRAINAGE INC. | -21.3% | 2 |
| Sep 5, 2019 | 0045-12-084STP 2020(006)HES | Red River Paris |
SFT - SAFETY IMPROVEMENT PROJECTSUS 82 · | $227,942 | $348,774 | STRIPING TECHNOLOGY, L.P. | +53.0% | 2 |
| Sep 5, 2019 | 6343-05-001RMC - 634305001 | Erath Fort Worth |
TREE TRIMMING AND BRUSH AND TREE REMOVALUS 377 · | $319,863 | $309,400 | CEN-TEX IRRIGATION SYSTEMS, INC. | -3.3% | 2 |
| Sep 5, 2019 | 6348-32-001RMC - 634832001 | Floyd |
SMALL SIGN INSTALLATIONFM 97 · | $330,600 | $280,850 | TEXAS BLACKTOPS LLC | -15.0% | 12 |
| Sep 4, 2019 | 6338-40-001BPM - 633840001 | Tarrant Fort Worth |
BPMUS 377 · | $267,870 | $257,667 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -3.8% | 3 |
1–87 of 87
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.