| 1 | 100-6002 |
PREPARING ROW | 229 | STA |
$2,000.00 |
$10.00 |
$800.00 |
$2,000.00 |
|
| 2 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 343 | SY |
$12.00 |
$10.00 |
$30.00 |
$20.00 |
|
| 3 | 104-6021 |
REMOVING CONC (CURB) | 68 | LF |
$10.00 |
$10.00 |
$20.00 |
$5.00 |
|
| 4 | 104-6045 |
REMOVE CONC (MISC) | 1 | EA |
$400.00 |
$700.00 |
$800.00 |
$3,000.00 |
|
| 5 | 105-6011 |
REMOVING STAB BASE AND ASPH PAV (2"-6") | 3,062 | SY |
$4.00 |
$2.75 |
$7.00 |
$4.00 |
|
| 6 | 105-6033 |
REMOVING STB BASE AND ASPH PAV(10-14") | 20,227 | SY |
$2.30 |
$1.00 |
$7.00 |
$6.00 |
|
| 7 | 110-6001 |
EXCAVATION (ROADWAY) | 37,130 | CY |
$12.00 |
$10.00 |
$9.00 |
$8.00 |
|
| 8 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 9,981 | CY |
$14.00 |
$10.00 |
$7.00 |
$15.00 |
|
| 9 | 134-6001 |
BACKFILL (TY A) | 458 | STA |
$200.00 |
$10.00 |
$150.00 |
$100.00 |
|
| 10 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 112,596 | SY |
$1.00 |
$1.30 |
$0.5000 |
$1.00 |
|
| 11 | 164-6054 |
BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 112,596 | SY |
$0.8000 |
$1.15 |
$0.6800 |
$0.7500 |
|
| 12 | 164-6055 |
BONDED FBR MTRX SEED (TEMP)(WARM) | 56,299 | SY |
$0.7000 |
$1.10 |
$0.6800 |
$0.6000 |
|
| 13 | 164-6056 |
BONDED FBR MTRX SEED (TEMP)(COOL) | 56,297 | SY |
$0.7000 |
$1.10 |
$0.6800 |
$0.6000 |
|
| 14 | 168-6001 |
VEGETATIVE WATERING | 2,477 | MG |
$8.00 |
$5.00 |
$10.00 |
$8.00 |
|
| 15 | 247-6230 |
FL BS (CMP IN PLACE)(TY A GR 1-2)(8") | 61,184 | SY |
$8.00 |
$15.00 |
$16.00 |
$14.00 |
|
| 16 | 275-6001 |
CEMENT | 1,010 | TON |
$150.00 |
$140.00 |
$160.00 |
$150.00 |
|
| 17 | 275-6010 |
CEMENT TREAT (SUBGRADE) (8") | 61,184 | SY |
$3.00 |
$4.00 |
$3.80 |
$2.25 |
|
| 18 | 310-6009 |
PRIME COAT (MC-30) | 9,178 | GAL |
$4.00 |
$5.00 |
$4.00 |
$5.00 |
|
| 19 | 314-6012 |
EMULS ASPH (EROSN CONT)(CSS-1) | 2,989 | GAL |
$4.25 |
$3.50 |
$4.20 |
$5.00 |
|
| 20 | 316-6406 |
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) | 164,694 | GAL |
$3.25 |
$3.05 |
$3.20 |
$2.95 |
|
| 21 | 316-6407 |
AGGR (TY-PD GR-3 OR TY-PL GR-3) | 3,397 | CY |
$125.00 |
$130.00 |
$110.00 |
$100.00 |
|
| 22 | 316-6408 |
AGGR(TY-PD GR-4 OR TY-PL GR-4) | 510 | CY |
$125.00 |
$130.00 |
$120.00 |
$100.00 |
|
| 23 | 340-6034 |
D-GR HMA(SQ) TY-C PG64-22 | 406 | TON |
$150.00 |
$106.00 |
$150.00 |
$100.00 |
|
| 24 | 344-6047 |
SUPERPAVE MIXTURES SP-C SAC-A PG70-22 | 43,188 | TON |
$110.00 |
$110.00 |
$95.00 |
$105.00 |
|
| 25 | 354-6045 |
PLANE ASPH CONC PAV (2") | 293,615 | SY |
$3.00 |
$1.25 |
$1.75 |
$1.50 |
|
| 26 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 25 | LF |
$10.00 |
$1.00 |
$18.00 |
$100.00 |
|
| 27 | 403-6001 |
TEMPORARY SPL SHORING | 856 | SF |
$27.00 |
$33.00 |
$40.00 |
$45.00 |
|
| 28 | 420-6010 |
CL A CONC (PLUG) | 1 | EA |
$950.00 |
$1,500.00 |
$2,000.00 |
$5,000.00 |
|
| 29 | 432-6002 |
RIPRAP (CONC)(5 IN) | 16 | CY |
$600.00 |
$655.00 |
$550.00 |
$450.00 |
|
| 30 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 2,814 | CY |
$110.00 |
$125.00 |
$120.00 |
$125.00 |
|
| 31 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 52 | CY |
$490.00 |
$670.00 |
$550.00 |
$450.00 |
|
| 32 | 462-6045 |
CONC BOX CULV (3 FT X 2 FT)(EXTEND) | 17 | LF |
$500.00 |
$330.00 |
$800.00 |
$600.00 |
|
| 33 | 462-6048 |
CONC BOX CULV (4 FT X 3 FT)(EXTEND) | 42 | LF |
$480.00 |
$390.00 |
$800.00 |
$600.00 |
|
| 34 | 462-6052 |
CONC BOX CULV (5 FT X 4 FT)(EXTEND) | 7 | LF |
$600.00 |
$670.00 |
$800.00 |
$800.00 |
|
| 35 | 462-6067 |
CONC BOX CULV (8 FT X 8 FT)(EXTEND) | 44 | LF |
$960.00 |
$750.00 |
$1,000.00 |
$900.00 |
|
| 36 | 462-6078 |
CONC BOX CULV (10 FT X 10 FT)(EXTEND) | 45 | LF |
$800.00 |
$870.00 |
$1,200.00 |
$1,000.00 |
|
| 37 | 462-6093 |
CONC BOX CULV (5 FT X 6 FT) (EXTEND) | 25 | LF |
$750.00 |
$625.00 |
$900.00 |
$800.00 |
|
| 38 | 462-6133 |
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND) | 25 | LF |
$800.00 |
$650.00 |
$900.00 |
$1,000.00 |
|
| 39 | 464-6003 |
RC PIPE (CL III)(18 IN) | 2,444 | LF |
$50.00 |
$43.00 |
$55.00 |
$40.00 |
|
| 40 | 464-6005 |
RC PIPE (CL III)(24 IN) | 16 | LF |
$80.00 |
$67.00 |
$130.00 |
$100.00 |
|
| 41 | 466-6144 |
WINGWALL (FW - 0) (HW=12 FT) | 1 | EA |
$30,900.00 |
$26,000.00 |
$25,000.00 |
$18,000.00 |
|
| 42 | 466-6150 |
WINGWALL (FW - 0) (HW=3 FT) | 1 | EA |
$6,200.00 |
$6,000.00 |
$4,000.00 |
$2,000.00 |
|
| 43 | 466-6171 |
WINGWALL (PW - 1) (HW=10 FT) | 2 | EA |
$29,000.00 |
$26,000.00 |
$38,000.00 |
$15,000.00 |
|
| 44 | 466-6180 |
WINGWALL (PW - 1) (HW=5 FT) | 2 | EA |
$11,500.00 |
$10,000.00 |
$9,000.00 |
$6,000.00 |
|
| 45 | 466-6183 |
WINGWALL (PW - 1) (HW=8 FT) | 2 | EA |
$14,500.00 |
$20,000.00 |
$20,000.00 |
$15,000.00 |
|
| 46 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 116 | EA |
$750.00 |
$720.00 |
$700.00 |
$550.00 |
|
| 47 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 1 | EA |
$1,000.00 |
$1,000.00 |
$900.00 |
$900.00 |
|
| 48 | 480-6001 |
CLEAN EXIST CULVERTS | 15 | EA |
$2,500.00 |
$2,900.00 |
$1,600.00 |
$1,000.00 |
|
| 49 | 496-6004 |
REMOV STR (SET) | 9 | EA |
$375.00 |
$225.00 |
$200.00 |
$500.00 |
|
| 50 | 496-6005 |
REMOV STR (WINGWALL) | 8 | EA |
$2,500.00 |
$800.00 |
$1,200.00 |
$1,000.00 |
|
| 51 | 496-6006 |
REMOV STR (HEADWALL) | 1 | EA |
$1,000.00 |
$800.00 |
$1,200.00 |
$1,000.00 |
|
| 52 | 496-6050 |
REMOV STR (DRIVEWAY CULVERT) | 30 | EA |
$300.00 |
$400.00 |
$450.00 |
$500.00 |
|
| 53 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,142,314.00 |
$705,500.00 |
$1,000,000.00 |
$900,000.00 |
|
| 54 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 17 | MO |
$5,000.00 |
$2,000.00 |
$11,000.00 |
$5,000.00 |
|
| 55 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 750 | LF |
$30.00 |
$29.00 |
$30.00 |
$33.00 |
|
| 56 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 50 | LF |
$31.00 |
$42.00 |
$40.00 |
$45.00 |
|
| 57 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 800 | LF |
$8.00 |
$15.00 |
$3.00 |
$15.00 |
|
| 58 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 780 | SY |
$20.00 |
$15.00 |
$15.00 |
$20.00 |
|
| 59 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 780 | SY |
$10.00 |
$12.00 |
$3.00 |
$12.00 |
|
| 60 | 506-6029 |
EARTHWORK (EROSN & SEDMT CONT, IN VEH) | 500 | CY |
$19.00 |
$10.00 |
$20.00 |
$30.00 |
|
| 61 | 506-6030 |
BACKHOE WORK (EROSION & SEDMT CONT) | 75 | HR |
$90.00 |
$55.00 |
$66.00 |
$125.00 |
|
| 62 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 672 | LF |
$2.70 |
$2.50 |
$3.50 |
$5.00 |
|
| 63 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 672 | LF |
$0.8000 |
$2.00 |
$0.9000 |
$1.00 |
|
| 64 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 960 | LF |
$4.30 |
$4.00 |
$5.00 |
$6.00 |
|
| 65 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 960 | LF |
$1.20 |
$2.00 |
$0.6000 |
$1.00 |
|
| 66 | 506-6046 |
TRACKHOE WORK (EROSION & SEDMT CONT) | 75 | HR |
$120.00 |
$90.00 |
$90.00 |
$225.00 |
|
| 67 | 512-6005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 270 | LF |
$80.00 |
$105.00 |
$87.00 |
$90.00 |
|
| 68 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,080 | LF |
$17.00 |
$18.00 |
$25.00 |
$5.00 |
|
| 69 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 270 | LF |
$25.00 |
$25.00 |
$30.00 |
$20.00 |
|
| 70 | 530-6005 |
DRIVEWAYS (ACP) | 10,528 | SY |
$28.00 |
$29.00 |
$27.00 |
$33.00 |
|
| 71 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 405 | SY |
$99.00 |
$100.00 |
$110.00 |
$85.00 |
|
| 72 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 71,620 | LF |
$0.1900 |
$0.1700 |
$0.1400 |
$0.2500 |
|
| 73 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 775 | LF |
$30.00 |
$27.50 |
$26.00 |
$26.00 |
|
| 74 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 3 | EA |
$1,100.00 |
$1,315.00 |
$1,200.00 |
$1,300.00 |
|
| 75 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,700.00 |
$3,000.00 |
$2,600.00 |
$2,800.00 |
|
| 76 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 4 | EA |
$2,100.00 |
$2,500.00 |
$1,000.00 |
$3,000.00 |
|
| 77 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 1 | EA |
$950.00 |
$915.00 |
$800.00 |
$1,000.00 |
|
| 78 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$11,700.00 |
$11,000.00 |
$9,500.00 |
$10,000.00 |
|
| 79 | 560-6004 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 38 | EA |
$260.00 |
$315.00 |
$230.00 |
$230.00 |
|
| 80 | 560-6005 |
MAILBOX INSTALL-D (TWG-POST) TY 2 | 2 | EA |
$340.00 |
$355.00 |
$270.00 |
$270.00 |
|
| 81 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 38 | EA |
$565.00 |
$650.00 |
$400.00 |
$400.00 |
|
| 82 | 644-6002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 22 | EA |
$610.00 |
$855.00 |
$500.00 |
$500.00 |
|
| 83 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 4 | EA |
$700.00 |
$715.00 |
$480.00 |
$500.00 |
|
| 84 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 1 | EA |
$650.00 |
$860.00 |
$570.00 |
$600.00 |
|
| 85 | 644-6017 |
IN SM RD SN SUP&AM TY10BWG(2)SA(P) | 2 | EA |
$1,000.00 |
$1,135.00 |
$900.00 |
$900.00 |
|
| 86 | 644-6028 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 5 | EA |
$850.00 |
$1,035.00 |
$450.00 |
$500.00 |
|
| 87 | 644-6076 |
REMOVE SM RD SN SUP&AM | 59 | EA |
$105.00 |
$135.00 |
$60.00 |
$60.00 |
|
| 88 | 658-6036 |
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND | 21 | EA |
$40.00 |
$50.00 |
$55.00 |
$50.00 |
|
| 89 | 658-6041 |
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND | 24 | EA |
$50.00 |
$50.00 |
$55.00 |
$50.00 |
|
| 90 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 4 | EA |
$50.00 |
$50.00 |
$60.00 |
$50.00 |
|
| 91 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 10 | EA |
$30.00 |
$28.00 |
$30.00 |
$50.00 |
|
| 92 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 45,744 | LF |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
|
| 93 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 114,350 | LF |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
|
| 94 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 91,480 | LF |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
|
| 95 | 662-6060 |
WK ZN PAV MRK REMOV (W)4"(BRK) | 22,872 | LF |
$1.00 |
$0.1100 |
$0.1100 |
$0.1100 |
|
| 96 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 71,088 | LF |
$0.6000 |
$0.9500 |
$0.8800 |
$0.9000 |
|
| 97 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 71,638 | LF |
$0.6000 |
$0.9500 |
$0.8800 |
$0.9000 |
|
| 98 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 13,720 | EA |
$1.00 |
$1.00 |
$0.7000 |
$2.00 |
|
| 99 | 666-6006 |
REFL PAV MRK TY I (W)4"(DOT)(100MIL) | 174 | LF |
$1.00 |
$1.10 |
$1.10 |
$1.10 |
|
| 100 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 8,434 | LF |
$0.7000 |
$0.9500 |
$0.9000 |
$0.9000 |
|
| 101 | 666-6042 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 300 | LF |
$2.70 |
$3.75 |
$3.70 |
$4.00 |
|
| 102 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 288 | LF |
$5.00 |
$6.00 |
$5.80 |
$6.00 |
|
| 103 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 11,199 | LF |
$0.3500 |
$0.5000 |
$0.5000 |
$0.5200 |
|
| 104 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 45,690 | LF |
$0.3000 |
$0.5000 |
$0.4800 |
$0.5000 |
|
| 105 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 45,150 | LF |
$0.3000 |
$0.5000 |
$0.4800 |
$0.5000 |
|
| 106 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 40 | EA |
$150.00 |
$210.00 |
$200.00 |
$200.00 |
|
| 107 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 38 | EA |
$190.00 |
$250.00 |
$240.00 |
$250.00 |
|
| 108 | 668-6092 |
PREFAB PAV MRK TY C (W) (36")(YLD TRI) | 214 | EA |
$28.00 |
$40.00 |
$38.00 |
$40.00 |
|
| 109 | 672-6009 |
REFL PAV MRKR TY II-A-A | 28 | EA |
$4.00 |
$4.00 |
$3.70 |
$4.00 |
|
| 110 | 672-6010 |
REFL PAV MRKR TY II-C-R | 1,401 | EA |
$4.00 |
$4.00 |
$3.70 |
$4.00 |
|
| 111 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 114,165 | LF |
$0.4000 |
$0.1800 |
$0.5000 |
$1.00 |
|
| 112 | 3000-6001 |
CAM (ASPHALT) PG(70-22) | 504 | TON |
$150.00 |
$150.00 |
$135.00 |
$150.00 |
|
| 113 | 3000-6004 |
CAM (AGGREGATE) | 6,205 | TON |
$150.00 |
$150.00 |
$135.00 |
$150.00 |
|
| 114 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$15,000.00 |
$6,000.00 |
$8,000.00 |
$15,000.00 |
|
| 115 | 6185-6002 |
TMA (STATIONARY) | 256 | DAY |
$162.00 |
$70.00 |
$220.00 |
$300.00 |
|
| 116 | 6185-6005 |
TMA (MOBILE OPERATION) | 273 | DAY |
$180.00 |
$22.00 |
$10.00 |
$300.00 |
|