| 1 | 100-6002 |
PREPARING ROW | 5.8 | STA |
$5,000.00 |
$1,500.00 |
$4,800.00 |
$5,500.00 |
|
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 564 | CY |
$8.00 |
$10.55 |
$35.00 |
$42.00 |
|
| 3 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 628 | CY |
$15.00 |
$20.00 |
$40.00 |
$96.00 |
|
| 4 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 810 | SY |
$0.1000 |
$1.00 |
$3.00 |
$2.00 |
|
| 5 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 810 | SY |
$0.1000 |
$1.00 |
$3.00 |
$2.00 |
|
| 6 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 1,620 | SY |
$0.3000 |
$1.26 |
$3.00 |
$2.00 |
|
| 7 | 168-6001 |
VEGETATIVE WATERING | 13.7 | MG |
$15.00 |
$57.00 |
$3.00 |
$1,000.00 |
|
| 8 | 169-6004 |
SOIL RETENTION BLANKETS (CL 1) (TY D) | 910 | SY |
$1.00 |
$3.00 |
$6.50 |
$3.00 |
|
| 9 | 247-6231 |
FL BS (CMP IN PLACE)(TY A GR 1-2)(10") | 276 | SY |
$60.00 |
$147.57 |
$48.00 |
$95.00 |
|
| 10 | 400-6005 |
CEM STABIL BKFL | 47 | CY |
$75.00 |
$150.00 |
$295.00 |
$85.00 |
|
| 11 | 403-6001 |
TEMPORARY SPL SHORING | 345 | SF |
$30.00 |
$33.00 |
$45.00 |
$44.00 |
|
| 12 | 407-6004 |
SHEET PILING (PZ - 35) | 4,731 | SF |
$45.00 |
$60.44 |
$76.00 |
$71.00 |
|
| 13 | 416-6003 |
DRILL SHAFT (30 IN) | 432 | LF |
$180.00 |
$501.00 |
$455.00 |
$700.00 |
|
| 14 | 416-6004 |
DRILL SHAFT (36 IN) | 480 | LF |
$180.00 |
$681.00 |
$640.00 |
$1,170.00 |
|
| 15 | 420-6013 |
CL C CONC (ABUT) | 33 | CY |
$1,200.00 |
$1,000.00 |
$1,220.00 |
$1,700.00 |
|
| 16 | 420-6029 |
CL C CONC (CAP) | 16.2 | CY |
$1,700.00 |
$1,700.00 |
$1,795.00 |
$4,800.00 |
|
| 17 | 420-6037 |
CL C CONC (COLUMN) | 37.6 | CY |
$1,500.00 |
$900.00 |
$2,650.00 |
$1,980.00 |
|
| 18 | 420-6064 |
CL C CONC (COPING) | 16.2 | CY |
$800.00 |
$400.00 |
$985.00 |
$1,850.00 |
|
| 19 | 422-6001 |
REINF CONC SLAB | 3,338 | SF |
$25.00 |
$20.00 |
$28.00 |
$45.00 |
|
| 20 | 425-6011 |
PRESTR CONC SLAB BEAM (4SB15) | 450 | LF |
$225.00 |
$192.14 |
$375.00 |
$230.00 |
|
| 21 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 300 | LF |
$225.00 |
$207.58 |
$375.00 |
$260.00 |
|
| 22 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 203 | CY |
$105.00 |
$180.84 |
$165.00 |
$275.00 |
|
| 23 | 432-6044 |
RIPRAP (CONC)(FLUME) | 2 | CY |
$350.00 |
$1,136.00 |
$1,000.00 |
$800.00 |
|
| 24 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 22 | CY |
$400.00 |
$500.00 |
$525.00 |
$1,300.00 |
|
| 25 | 450-6006 |
RAIL (TY T223) | 324 | LF |
$90.00 |
$109.78 |
$135.00 |
$350.00 |
|
| 26 | 454-6004 |
ARMOR JOINT (SEALED) | 44.5 | LF |
$95.00 |
$139.00 |
$95.00 |
$100.00 |
|
| 27 | 464-6001 |
RC PIPE (CL III)(12 IN) | 28 | LF |
$75.00 |
$171.00 |
$65.00 |
$100.00 |
|
| 28 | 467-6326 |
SET (TY II) (12 IN) (RCP) (6: 1) (P) | 2 | EA |
$750.00 |
$3,600.00 |
$1,000.00 |
$1,400.00 |
|
| 29 | 496-6007 |
REMOV STR (PIPE) | 50 | LF |
$15.00 |
$29.00 |
$40.00 |
$23.00 |
|
| 30 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$100,000.00 |
$100,000.00 |
$36,000.00 |
$60,000.00 |
|
| 31 | 500-6001 |
MOBILIZATION | 1 | LS |
$90,000.00 |
$180,000.00 |
$220,000.00 |
$75,000.00 |
|
| 32 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$2,000.00 |
$1,000.00 |
$2,700.00 |
$3,300.00 |
|
| 33 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 80 | LF |
$25.00 |
$15.00 |
$35.00 |
$58.00 |
|
| 34 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 60 | LF |
$8.00 |
$10.00 |
$10.00 |
$30.00 |
|
| 35 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 870 | LF |
$3.00 |
$3.00 |
$3.00 |
$25.00 |
|
| 36 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 870 | LF |
$1.00 |
$1.00 |
$1.00 |
$3.00 |
|
| 37 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 100 | LF |
$5.00 |
$7.82 |
$6.00 |
$25.00 |
|
| 38 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$1.00 |
$1.00 |
$2.00 |
$4.00 |
|
| 39 | 512-6005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 150 | LF |
$45.00 |
$142.77 |
$85.00 |
$250.00 |
|
| 40 | 512-6009 |
PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 140 | LF |
$60.00 |
$156.22 |
$75.00 |
$100.00 |
|
| 41 | 512-6010 |
PORT CTB (FUR & INST)(LOW PROF)(TY 2) | 80 | LF |
$60.00 |
$201.70 |
$75.00 |
$100.00 |
|
| 42 | 512-6033 |
PORT CTB (MOVE)(LOW PROF)(TY 1) | 120 | LF |
$10.00 |
$50.00 |
$12.00 |
$10.00 |
|
| 43 | 512-6034 |
PORT CTB (MOVE)(LOW PROF)(TY 2) | 40 | LF |
$10.00 |
$100.00 |
$12.00 |
$10.00 |
|
| 44 | 512-6053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 150 | LF |
$45.00 |
$100.00 |
$22.00 |
$23.00 |
|
| 45 | 512-6057 |
PORT CTB (REMOVE)(LOW PROF)(TY 1) | 140 | LF |
$10.00 |
$24.00 |
$22.00 |
$23.00 |
|
| 46 | 512-6058 |
PORT CTB (REMOVE)(LOW PROF)(TY 2) | 80 | LF |
$10.00 |
$25.00 |
$22.00 |
$23.00 |
|
| 47 | 512-6099 |
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T | 20 | LF |
$60.00 |
$564.10 |
$100.00 |
$117.00 |
|
| 48 | 512-6103 |
PORT CTB(REMOVE)(F-SHAPE)(TY T) | 20 | LF |
$10.00 |
$25.00 |
$22.00 |
$20.00 |
|
| 49 | 530-6016 |
DRIVEWAYS (BASE) | 63 | SY |
$33.00 |
$46.76 |
$45.00 |
$30.00 |
|
| 50 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 312.5 | LF |
$22.00 |
$21.76 |
$25.00 |
$30.00 |
|
| 51 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,000.00 |
$1,895.49 |
$2,000.00 |
$1,900.00 |
|
| 52 | 540-6014 |
SHORT RADIUS | 10 | LF |
$30.00 |
$176.74 |
$70.00 |
$100.00 |
|
| 53 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$980.00 |
$3,328.85 |
$1,400.00 |
$1,600.00 |
|
| 54 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 3 | EA |
$2,500.00 |
$3,049.41 |
$3,000.00 |
$3,000.00 |
|
| 55 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$450.00 |
$583.42 |
$1,000.00 |
$500.00 |
|
| 56 | 644-6076 |
REMOVE SM RD SN SUP&AM | 6 | EA |
$75.00 |
$65.13 |
$300.00 |
$300.00 |
|
| 57 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$22.00 |
$5.05 |
$30.00 |
$450.00 |
|
| 58 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$30.00 |
$11.37 |
$30.00 |
$450.00 |
|
| 59 | 752-6016 |
TREE TRIMMING | 1 | AC |
$5,000.00 |
$10,000.00 |
$4,500.00 |
$7,500.00 |
|
| 60 | 4027-6001 |
TEMP CONSTRUCTION ACCESS | 1 | LS |
$100,000.00 |
$6,500.00 |
$400,000.00 |
$190,000.00 |
|
| 61 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 1 | EA |
$10,000.00 |
$18,000.00 |
$20,000.00 |
$25,000.00 |
|