132Let jobs
$394,177,156Total low bids
$401,692,348Total estimates
-1.9%Low bids vs estimates
Feb 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2019 | 6341-86-001RMC - 634186001 | Angelina Lufkin |
INSTALLATION OF WATERBASE STRIPINGUS 59 · | $291,250 | $262,750 | STRIPING TECHNOLOGY, L.P. | -9.8% | 3 |
| Feb 27, 2019 | 6330-13-001RMC - 633013001 | Houston Lufkin |
TREE TRIMMING AND TREE AND BRUSH REMOVALUS 287 · | $269,800 | $247,007 | L & M MOWING CONTRACTORS, LLC | -8.4% | 2 |
| Feb 27, 2019 | 6341-93-001RMC - 634193001 | San Augustine Lufkin |
MOWING RIGHT OF WAY AND LITTER REMOVALUS 96 · | $184,549 | $181,463 | P-VILLE, INCORPORATED | -1.7% | 2 |
| Feb 26, 2019 | 6339-63-001RMC - 633963001 | Travis Austin |
CULVERT REPLACEMENTRM 2244 · | $276,572 | $318,874 | CHAMPION INFRASTRUCTURE, LLC | +15.3% | 1 |
| Feb 26, 2019 | 6333-82-001RMC - 633382001 | Austin Yoakum |
STRUCTURAL AND EROSION REPAIRSSH 36 · | $277,284 | $312,421 | CHAMPION INFRASTRUCTURE, LLC | +12.7% | 3 |
| Feb 20, 2019 | 6342-78-001RMC - 634278001 | Crockett San Angelo |
BRIDGE AND RAIL REPAIRIH 10 · | $268,378 | $223,179 | RELMCO, INC. | -16.8% | 6 |
| Feb 20, 2019 | 6327-24-001RMC - 632724001 | Wharton Yoakum |
WHARTON AO/MAINTENANCE OFFICE JANITORIAL SERVICESFM 102 · | $20,880 | $17,220 | MAXPRO ENTERPRISE LLC | -17.5% | 3 |
| Feb 14, 2019 | 6323-20-001RMC - 632320001 | Wichita Wichita Falls |
CULVERT MAINTENANCE & MODIFICATIONSH 25 · | $259,402 | $278,371 | EARTH BUILDERS, L.P. | +7.3% | 3 |
| Feb 14, 2019 | 6341-46-001RMC - 634146001 | Hunt Paris |
CONCRETE CURB AND FLUMEFM 1903 · | $209,155 | $196,128 | J.R. POPE COMPANY, INC. | -6.2% | 8 |
| Feb 14, 2019 | 6342-77-001RMC - 634277001 | Lamar Paris |
JANITORIAL MAINTENANCEBU 271B · | $60,000 | $30,011 | KLEEN SWEEP SERVICES | -50.0% | 6 |
| Feb 13, 2019 | 6340-52-001RMC - 634052001 | Polk Lufkin |
MOWING OF RIGHT-OF-WAY AND LITTER REMVALUS 59 · | $278,424 | $259,659 | ROY LEE WALKER | -6.7% | 3 |
| Feb 13, 2019 | 6340-51-001RMC - 634051001 | Houston Lufkin |
MOWING OF RIGHT-OF-WAY AND LITTER REMOVALUS 287 · | $192,700 | $164,760 | SOUTHERN EDGE CONTRACTORS LLC | -14.5% | 4 |
| Feb 13, 2019 | 6340-53-001RMC - 634053001 | San Jacinto Lufkin |
MOWING OF RIGHT-OF-WAY AND LITTER REMVALUS 59 · | $160,956 | $139,906 | ROY LEE WALKER | -13.1% | 2 |
| Feb 13, 2019 | 6341-52-001RMC - 634152001 | Bexar San Antonio |
CONCRETE RAIL REPAIRIH 10 · | $127,599 | $117,027 | Curran Contracting Company | -8.3% | 5 |
| Feb 13, 2019 | 6335-01-001BPM - 633501001 | Comal San Antonio |
RIPRAP REPAIRFM 306 · | $117,154 | $106,177 | DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC. | -9.4% | 7 |
| Feb 13, 2019 | 6335-03-001BPM - 633503001 | Medina San Antonio |
BRIDGE PREVENTIVE MAINTENANCESH 173 · | $22,714 | $29,550 | SHANNON-MONK, INC. | +30.1% | 3 |
| Feb 12, 2019 | 6341-02-001RMC - 634102001 | La Salle Laredo |
INSTALLATION OF TRAFFIC SIGNALSIH 35 · | $299,969 | $303,621 | TRIPLE H FIELD SERVICES, LLC | +1.2% | 4 |
| Feb 12, 2019 | 6341-03-001RMC - 634103001 | Kinney Laredo |
INSTALL TRAFFIC SIGNALS AND FLASH BEACONUS 277 · | $291,409 | $302,620 | TRIPLE H FIELD SERVICES, LLC | +3.8% | 2 |
| Feb 12, 2019 | 6341-12-001RMC - 634112001 | Van Zandt Tyler |
GUARDRAILSH 110 · | $289,497 | $265,678 | R & G CONSTRUCTION, LLC | -8.2% | 6 |
| Feb 12, 2019 | 6337-16-001RMC - 633716001 | Montgomery Houston |
ASPHALT PAVEMENT REPAIRIH 45 · | $265,600 | $257,100 | MAIN LANE INDUSTRIES LTD. | -3.2% | 2 |
| Feb 12, 2019 | 6333-09-001BPM - 633309001 | Navarro Dallas |
BPM - BRIDGE REPAIRIH 45 · | $262,728 | $249,287 | CHAMPION INFRASTRUCTURE, LLC | -5.1% | 3 |
| Feb 12, 2019 | 6339-40-001RMC - 633940001 | Goliad Corpus Christi |
MOWINGUS 59 · | $292,700 | $246,500 | HAMMOND LAND DEVELOPMENT, LLC | -15.8% | 3 |
| Feb 12, 2019 | 6340-50-001RMC - 634050001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)IH 69 · | $259,988 | $242,946 | PMI PAVEMENT MARKING, LLC | -6.6% | 4 |
| Feb 12, 2019 | 6340-76-001RMC - 634076001 | Harris Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSL 8 · | $289,833 | $239,994 | AIMS COMPANIES | -17.2% | 2 |
| Feb 12, 2019 | 6334-39-001RMC - 633439001 | Erath Fort Worth |
REFLECTORIZED PAV MRKINGS AND MRKSUS 377 · | $213,868 | $221,553 | REPUBLIC TRAFFIC SAFETY, INC. | +3.6% | 6 |
| Feb 12, 2019 | 6333-06-001BPM - 633306001 | Ellis Dallas |
BPM - BRIDGE REPAIRUS 287 · | $178,443 | $198,227 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | +11.1% | 4 |
| Feb 12, 2019 | 6341-34-001RMC - 634134001 | Ector Odessa |
BRUSH REMOVAL/DRAINAGE EASEMENT CLEANINGIH 20 · | $196,320 | $167,765 | BK FIELD OPERATIONS LLC | -14.5% | 3 |
| Feb 12, 2019 | 6327-81-001RMC - 632781001 | Parker Fort Worth |
ASBESTOS ABATEMENTIH 20 · | $120,533 | $156,286 | CHAMPION INFRASTRUCTURE, LLC | +29.7% | 2 |
| Feb 12, 2019 | 6341-62-001RMC - 634162001 | Ector Odessa |
CULVERT CLEANINGIH 20 · | $80,000 | $97,500 | E.V.G. ENTERPRISE | +21.9% | 2 |
| Feb 6, 2019 | 0016-05-119NH 2019(507) | Comal San Antonio |
GRADING, STRUCTURES, BASE & SURFACEIH 35 · | $28,477,165 | $25,398,551 | BRIDGES AND ROADS, LLC | -10.8% | 7 |
| Feb 6, 2019 | 2451-02-012STP 2019(065) | Culberson El Paso |
FULL DEPTH REHABRM 652 · | $22,909,056 | $22,480,669 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | -1.9% | 4 |
| Feb 6, 2019 | 0158-01-082NH 2019(396) | Runnels San Angelo |
ACP OVERLAYUS 67 · | $14,638,666 | $16,352,620 | KIEWIT INFRASTRUCTURE SOUTH CO. | +11.7% | 3 |
| Feb 6, 2019 | 0169-05-041NH 2013(613) | Carson Amarillo |
REHAB EXISITNG ROADWAYUS 60 · | $15,490,402 | $16,325,738 | RK HALL, LLC | +5.4% | 3 |
| Feb 6, 2019 | 0783-01-098C 783-1-98 | Lubbock Lubbock |
MILL,INLAY,FABRIC,SMA,& STRIPINGSL 289 · | $12,274,262 | $13,802,666 | ALLEN BUTLER CONSTRUCTION, INC. | +12.5% | 3 |
| Feb 6, 2019 | 0180-02-040STP 2019(579)HES | Refugio Corpus Christi |
SAFETY TRT FIXED OBJECTS, INSTALL PASSING LANESSH 35 · | $12,352,440 | $12,619,232 | HUNTER INDUSTRIES, LTD. | +2.2% | 3 |
| Feb 6, 2019 | 0200-04-024NH 2019(629) | Jasper Beaumont |
OVERLAY EXISTING ROADWAYUS 69 · | $11,758,396 | $10,120,117 | HERITAGE ASPHALT COMPANY LLC | -13.9% | 5 |
| Feb 6, 2019 | 0367-03-037C 367-3-37 | Galveston Houston |
BASE REPAIR,MILL & O/LSH 87 · | $7,024,267 | $7,833,851 | ANGEL BROTHERS HOLDINGS CORP. | +11.5% | 2 |
| Feb 6, 2019 | 0382-02-036STP 2019(441) | Falls Waco |
MILL/OVLYSH 7 · | $7,215,206 | $6,187,425 | BIG CREEK CONSTRUCTION, LTD. | -14.2% | 4 |
| Feb 6, 2019 | 0257-06-027C 257-6-27 | Erath Fort Worth |
GR, DR, STR, BS, HMAC, PAV MARKSH 6 · | $5,268,158 | $5,364,691 | JAY MILLS CONTRACTING, INCORPORATED | +1.8% | 3 |
| Feb 6, 2019 | 2136-01-015BR 2019(313) | Bell Waco |
REPL BR & APPRSFM 2268 · | $4,194,503 | $5,238,854 | CAPITAL EXCAVATION COMPANY | +24.9% | 3 |
| Feb 6, 2019 | 0041-07-106BR 2019(457) | Potter Amarillo |
BRIDGE REPLACEMENT AND APPROACHESUS 87 · | $4,987,164 | $4,976,890 | STATELINE CONSTRUCTION, LLC | -0.2% | 4 |
| Feb 6, 2019 | 0710-02-068C 710-2-68 | Orange Beaumont |
MILL, ACP, JOINT SEALFM 105 · | $7,686,177 | $4,885,039 | HERITAGE ASPHALT COMPANY LLC | -36.4% | 3 |
| Feb 6, 2019 | 0042-07-066NH 2019(592) | Donley Childress |
ASPHALTIC CONCRETE OVERLAYUS 287 · | $4,779,818 | $4,527,707 | J. LEE MILLIGAN, INC. | -5.3% | 3 |
| Feb 6, 2019 | 0905-00-092C 905-00-92 | Lubbock Lubbock |
PAVEMENT MARKERSVA · | $4,028,195 | $4,451,653 | L&L COMPANY | +10.5% | 4 |
| Feb 6, 2019 | 2815-01-008C 2815-1-8 | Kaufman Dallas |
REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERSFM 2757 · | $4,142,849 | $3,946,271 | LONGVIEW BRIDGE AND ROAD, LTD. | -4.7% | 7 |
| Feb 6, 2019 | 0867-07-013STP 2019(478)HES | San Saba Brownwood |
UPGRADE GUARDRAILRM 501 · | $2,432,790 | $3,876,626 | BIG CREEK CONSTRUCTION, LTD. | +59.3% | 1 |
| Feb 6, 2019 | 3173-01-004C 3173-1-4 | Wharton Yoakum |
RESTORE EXISTING ROADWAYFM 3086 · | $3,444,828 | $3,597,289 | ANGEL BROTHERS HOLDINGS CORP. | +4.4% | 6 |
| Feb 6, 2019 | 0521-03-060C 521-3-60 | Bexar San Antonio |
BSE RPR, MILL, SC, SURF & PAV'T MRKSL 13 · | $3,385,793 | $3,075,679 | ANGEL BROTHERS HOLDINGS CORP. | -9.2% | 6 |
| Feb 6, 2019 | 0009-06-051STP 2019(512)HES | Hunt Paris |
SAFETY RELATED PROJECTSSH 66 · | $2,288,838 | $2,841,098 | SAMMY GIST ENTERPRISES, INC. | +24.1% | 7 |
| Feb 6, 2019 | 6338-71-001RMC - 633871001 | Atascosa San Antonio |
PAVEMENT REPAIRUS 281 · | $3,011,641 | $2,675,424 | TEXAS MATERIALS GROUP, INC. | -11.2% | 6 |
| Feb 6, 2019 | 1357-01-026SSW 1357-1-26 | Cooke Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 2896 · | $2,682,062 | $2,595,534 | JAGOE-PUBLIC COMPANY | -3.2% | 5 |
| Feb 6, 2019 | 0291-10-110NH 2019(511) | Bexar San Antonio |
RECONSTRUCT EXISTING CULVERTSH 16 · | $2,116,136 | $2,107,962 | DAN WILLIAMS COMPANY | -0.4% | 6 |
| Feb 6, 2019 | 0047-07-230STP 2019(498)HES | Dallas Dallas |
INSTALLATION OF TRAFFIC SIGNALSUS 75 · | $1,484,220 | $1,655,509 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +11.5% | 4 |
| Feb 6, 2019 | 0057-03-041STP 2019(496)HES | Freestone Bryan |
PROFILE EDGELINE MARKINGSUS 84 · | $2,053,056 | $1,651,842 | STRIPING TECHNOLOGY, L.P. | -19.5% | 6 |
| Feb 6, 2019 | 2560-01-083C 2560-1-83 | Nacogdoches Lufkin |
RESURFACE WITH THIN OVERLAY MIXTURESL 224 · | $1,590,357 | $1,560,111 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -1.9% | 4 |
| Feb 6, 2019 | 0915-00-191C 915-00-191 | Bexar San Antonio |
DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALSVA · | $1,493,471 | $1,540,868 | THE LEVY COMPANY, INC. | +3.2% | 2 |
| Feb 6, 2019 | 6341-05-001RMC - 634105001 | Grayson Paris |
SITE SPECIFIC TY I STRIPINGUS 75 · | $1,485,577 | $1,414,475 | STRIPING TECHNOLOGY, L.P. | -4.8% | 5 |
| Feb 6, 2019 | 0271-15-090C 271-15-90 | Harris Houston |
UGRADE STORM SEWERSIH 610 · | $1,093,630 | $1,159,847 | ANGEL BROTHERS HOLDINGS CORP. | +6.1% | 7 |
| Feb 6, 2019 | 0009-04-071C 9-4-71 | Rockwall Dallas |
FULL DEPTH CONCRETE PAVEMENT REPAIRSH 66 · | $1,094,108 | $1,154,288 | ROY JORGENSEN ASSOCIATES, INC. | +5.5% | 3 |
| Feb 6, 2019 | 0195-02-077C 195-2-77 | Denton Dallas |
FULL DEPTH CONCRETE REPAIRIH 35 · | $1,089,738 | $1,062,400 | SILVER CREEK CONSTRUCTION, INC. | -2.5% | 5 |
| Feb 6, 2019 | 0923-00-060C 923-00-60 | Brown Brownwood |
THERMOPLASTIC STRIPINGVA · | $888,556 | $978,221 | L&L COMPANY | +10.1% | 8 |
| Feb 6, 2019 | 6338-52-001RMC - 633852001 | Jefferson Beaumont |
DISTRICTWIDE SWEEPINGUS 69 · | $1,198,164 | $977,222 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -18.4% | 3 |
| Feb 6, 2019 | 0400-02-053NH 2019(503) | Hopkins Paris |
INTERSECTION & OPERATIONAL IMPROVMNSH 19 · | $764,387 | $837,426 | SAMMY GIST ENTERPRISES, INC. | +9.6% | 7 |
| Feb 6, 2019 | 6337-66-001RMC - 633766001 | Dallas Dallas |
RETROREFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 30 · | $876,075 | $759,054 | PMI PAVEMENT MARKING, LLC | -13.4% | 4 |
| Feb 6, 2019 | 6341-00-001RMC - 634100001 | El Paso El Paso |
ROADWAY SPALL & FULL DEPTH REPAIRIH 10 · | $649,470 | $689,827 | SYNERGY PROJECT CONTRACTORS, INC. | +6.2% | 3 |
| Feb 6, 2019 | 6342-05-001RMC - 634205001 | Lubbock Lubbock |
CALL OUT TRAFFIC CONTROLIH 27 · | $539,000 | $650,350 | BARRICADES UNLIMITED | +20.7% | 3 |
| Feb 6, 2019 | 1601-01-033CM 2019(500) | Parker Fort Worth |
SIGNAL & INTERSECTION IMPROVEMENTSFM 730 · | $482,911 | $552,724 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +14.5% | 3 |
| Feb 6, 2019 | 6341-01-001RMC - 634101001 | El Paso El Paso |
ROADWAY SPALL & FULL DEPTH REPAIRIH 10 · | $536,950 | $542,137 | SYNERGY PROJECT CONTRACTORS, INC. | +1.0% | 3 |
| Feb 6, 2019 | 6342-07-001RMC - 634207001 | Lamb Lubbock |
CALL OUT TRAFFIC CONTROLUS 84 · | $387,000 | $539,150 | BARRICADES UNLIMITED | +39.3% | 3 |
| Feb 6, 2019 | 6339-67-001RMC - 633967001 | Brazoria Houston |
MOWING HIGHWAY ROW (NORTH)SH 288 · | $450,316 | $446,201 | C-CO HOLDINGS LIMITED LIABILITY COMPANY | -0.9% | 5 |
| Feb 6, 2019 | 6342-08-001RMC - 634208001 | Terry Lubbock |
CALL OUT TRAFFIC CONTROL SERVICESUS 62 · | $296,500 | $418,850 | BARRICADES UNLIMITED | +41.3% | 3 |
| Feb 6, 2019 | 6342-06-001RMC - 634206001 | Hale Lubbock |
CALL OUT TRAFFIC CONTROL SERVICESIH 27 · | $296,500 | $390,850 | BARRICADES UNLIMITED | +31.8% | 3 |
| Feb 6, 2019 | 0200-08-056STP 2019(509)HES | Tyler Beaumont |
SAFETY TREAT FIXED OBJECTSUS 69 · | $328,925 | $348,025 | ODUM SERVICES, LLC | +5.8% | 8 |
| Feb 6, 2019 | 2211-02-030CC 2211-2-30 | Williamson Austin |
INSTALL MEDIAN BREAK AND LEFT TURN LANEFM 1460 · | $188,338 | $251,066 | ANGEL BROTHERS HOLDINGS CORP. | +33.3% | 3 |
| Feb 5, 2019 | 0508-02-120STP 2018(953)MM | Chambers Beaumont |
CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGEIH 10 · | $34,921,671 | $35,023,919 | COPASA, INC. | +0.3% | 6 |
| Feb 5, 2019 | 2452-04-016STP 2019(510) | Bexar San Antonio |
EXPAND FROM 2 LANES TO 4 LANE DIVIDEDSL 1604 · | $23,174,045 | $20,172,902 | MARIO SINACOLA & SONS EXCAVATING, INC. | -13.0% | 14 |
| Feb 5, 2019 | 0880-04-032STP 2013(649) | Lubbock Lubbock |
GRADE, BASE, ACPFM 179 · | $19,047,325 | $18,836,295 | ALLEN BUTLER CONSTRUCTION, INC. | -1.1% | 4 |
| Feb 5, 2019 | 0066-03-041NH 2019(458) | Sherman Amarillo |
OVERLAYUS 287 · | $14,893,378 | $14,540,199 | RK HALL, LLC | -2.4% | 2 |
| Feb 5, 2019 | 0440-01-042STP 2019(506) | Williamson Austin |
ADD SHOULDERS AND REHABILITATE ROADWAYSH 138 · | $6,825,458 | $7,208,328 | TTG UTILITIES, LP | +5.6% | 6 |
| Feb 5, 2019 | 0024-09-024C 24-9-24 | Bexar San Antonio |
SURFACE & PAVEMENT MARKINGSSS 371 · | $6,016,898 | $6,242,921 | ANGEL BROTHERS HOLDINGS CORP. | +3.8% | 5 |
| Feb 5, 2019 | 0027-13-212NH 2019(365) | Harris Houston |
HIGH MAST AND UNDERPASS LIGHTING UPGRADESIH 69 · | $5,280,884 | $4,728,768 | SICE, INC. | -10.5% | 5 |
| Feb 5, 2019 | 6327-15-001RMC - 632715001 | Travis Austin |
REPAIR, REPLACE, AND UPGRADE MBGFFM 734 · | $4,053,070 | $4,550,444 | K-BAR SERVICES, INC. | +12.3% | 1 |
| Feb 5, 2019 | 0200-07-054NH 2019(676) | Tyler Beaumont |
MILL AND OVERLAYUS 69 · | $5,852,881 | $4,390,336 | TEXAS MATERIALS GROUP, INC. | -25.0% | 4 |
| Feb 5, 2019 | 2590-02-010STP 2019(446) | Nacogdoches Lufkin |
RECONSTRUCT AND WIDEN PAVEMENTFM 2609 · | $3,995,249 | $3,823,596 | PINTO CONSTRUCTION CO., INC. | -4.3% | 7 |
| Feb 5, 2019 | 0520-05-050C 520-5-50 | Upshur Atlanta |
PLANING, ACP & PAV MRKSSH 155 · | $4,133,448 | $3,772,059 | MADDEN CONTRACTING COMPANY, LLC. | -8.7% | 2 |
| Feb 5, 2019 | 6340-24-001RMC - 634024001 | Gonzales Yoakum |
ON CALL PAVEMENT REPAIRSUA 90 · | $3,817,537 | $3,598,022 | BRANNAN PAVING CO., LTD. | -5.8% | 4 |
| Feb 5, 2019 | 1069-01-035STP 2019(572)HES | Nueces Corpus Christi |
IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALSSH 357 · | $3,585,320 | $3,511,807 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -2.1% | 4 |
| Feb 5, 2019 | 0092-14-092C 92-14-92 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADSIH 345 · | $3,132,829 | $3,472,553 | NEW WORLD CONTRACTING, LLC | +10.8% | 6 |
| Feb 5, 2019 | 6341-13-001RMC - 634113001 | Smith Tyler |
MILL & INLAYSH 64 · | $3,143,855 | $3,363,242 | LONGVIEW BRIDGE AND ROAD, LTD. | +7.0% | 7 |
| Feb 5, 2019 | 0039-17-201NH 2019(694) | Hidalgo Pharr |
PAVEMENT REHABILITATION OF FRONTAGE ROADSIH 2 · | $2,366,368 | $2,966,778 | FOREMOST PAVING, INC. | +25.4% | 2 |
| Feb 5, 2019 | 0051-09-120C 51-9-120 | Galveston Houston |
BASE REP, MILL, SC, O/L, STRIPINGFM 3005 · | $3,283,657 | $2,837,928 | ANGEL BROTHERS HOLDINGS CORP. | -13.6% | 2 |
| Feb 5, 2019 | 0952-01-060C 952-1-60 | Liberty Beaumont |
WIDEN/TWO-COURSE SURFACE TREATMENTFM 1008 · | $2,879,633 | $2,730,449 | ANGEL BROTHERS HOLDINGS CORP. | -5.2% | 4 |
| Feb 5, 2019 | 1158-01-009C 1158-1-9 | Culberson El Paso |
ROADWAY REHABILITATIONFM 2185 · | $2,597,422 | $2,339,707 | DAN WILLIAMS COMPANY | -9.9% | 4 |
| Feb 5, 2019 | 0137-10-022STP 2019(504)HES | Clay Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 174 · | $2,104,517 | $2,328,204 | BLYTHE CONSTRUCTION, INC. | +10.6% | 6 |
| Feb 5, 2019 | 0465-02-026C 465-2-26 | Bexar San Antonio |
SURFACE & PAVEMENT MARKINGSFM 1518 · | $2,621,772 | $2,220,997 | ANGEL BROTHERS HOLDINGS CORP. | -15.3% | 5 |
| Feb 5, 2019 | 0924-00-100STP 2019(575) | El Paso El Paso |
FY 2019 STRIPING PROJECTVA · | $2,057,697 | $1,965,160 | MIJELUM | -4.5% | 4 |
| Feb 5, 2019 | 0049-14-012STP 2019(497) | Robertson Bryan |
GRDG, WDN, STRCS, BASE, SURF, SGNS, MRKGSFM 46 · | $2,034,389 | $1,723,097 | KNIFE RIVER CORPORATION - SOUTH | -15.3% | 6 |
| Feb 5, 2019 | 0908-00-088NH 2019(516) | Taylor Abilene |
FY 2019 TRAFFIC CONTROL DEVICESVA · | $2,552,057 | $1,682,111 | FLAT LINE, INC. | -34.1% | 6 |
| Feb 5, 2019 | 0092-05-051STP 2019(499)MM | Ellis Dallas |
CONSTRUCT INTERSECTION IMPROVEMENTSIH 45 · | $1,213,647 | $1,593,213 | ACCELERATED CRITICAL PATH, INC. | +31.3% | 4 |
| Feb 5, 2019 | 0009-11-243C 9-11-243 | Dallas Dallas |
FULL DEPTH CONC. PAV REPAIR & PAV MARK ON EB FR RDIH 30 · | $1,070,904 | $1,381,126 | HIGHWAY 19 CONSTRUCTION LLC | +29.0% | 6 |
1–100 of 132Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.