BELL - BASE REPAIR
6492-19-001 · let Jan 14, 2026 · Bell, Waco · Routine Maintenance Project
$527,000Low bid: BIG CREEK CONSTRUCTION, LTD.-21.5% vs estimate $671,014
$28,046Left on the table5.3% gap to the second bid
3BiddersSpread 63% low to high
25Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BIG CREEK CONSTRUCTION, LTD. | $527,000 | -21.5% | $28,046 | 4+$18,908 | 0 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $555,046 | +5.3% | -17.3% | $306,545 | 4+$28,277 | 3-$12,491 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $861,591 | +63.5% | 28.4% | 10+$201,066 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
BIG CREEK CONSTRUCTION, LTD. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 344-7019 SP MIXES SP-C PG70-22 | 900 TON | $128.00 | $145.20 | $142.22 | $15,480 |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 800 SY | $36.00 | $53.80 | $35.01 | $14,240 |
| 500-7033 MOBILIZATION (EMERGENCY) | 3 EA | $400.00 | $4,990.00 | $844.81 | $13,770 |
| 7010-7002 MAINTENANCE SPEED LIMIT SIGNING | 25 DAY | $300.00 | $1.00 | $117.34 | -$7,475 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $210.00 | $85.00 | $217.57 | -$6,250 |
| 341-7022 D-GR HMA TY-C PG70-22 | 1,200 TON | $128.00 | $132.30 | $114.77 | $5,160 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,000 SY | $72.00 | $67.90 | $60.19 | -$4,100 |
| 354-7051 PLANE ASPH CONC PAV(2") | 5,000 SY | $3.25 | $3.65 | $1.86 | $2,000 |
| 341-7048 D-GR HMA TY-D PG70-22 | 600 TON | $133.00 | $135.25 | $126.94 | $1,350 |
| 505-7002 TMA (MOBILE OPERATION) | 25 HR | $100.00 | $50.00 | $64.00 | -$1,250 |
| 500-7002 MOBILIZATION (CALLOUT) | 5 EA | $250.00 | $10.00 | $600.85 | -$1,200 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 25 DAY | $105.00 | $62.85 | $87.82 | -$1,054 |
| 341-7082 TACK COAT | 600 GAL | $4.00 | $2.75 | $3.93 | -$750 |
| 668-7103 PREFAB PM TY C (W)(WORD) | 5 EA | $600.00 | $500.00 | $249.54 | -$500 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 500 EA | $1.50 | $0.9500 | $1.03 | -$275 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 500 EA | $1.50 | $0.9500 | $0.5715 | -$275 |
| 672-7004 REFL PAV MRKR TY II-A-A | 500 EA | $7.00 | $6.45 | $3.97 | -$275 |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 5,000 LF | $1.30 | $1.25 | $0.5533 | -$250 |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 5,000 LF | $1.30 | $1.25 | $0.5714 | -$250 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 50 LF | $10.50 | $15.00 | $7.19 | $225 |
Positive: the low bidder was cheaper on that item. These 20 items account for $28,321 of the $28,046 gap.
BIG CREEK CONSTRUCTION, LTD.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 354-7051 PLANE ASPH CONC PAV(2") | 5,000 SY | $3.25 | $1.86 | 1.75x | $6,965 |
| 7010-7002 MAINTENANCE SPEED LIMIT SIGNING | 25 DAY | $300.00 | $117.34 | 2.56x | $4,567 |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 5,000 LF | $1.30 | $0.5533 | 2.35x | $3,734 |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 5,000 LF | $1.30 | $0.5714 | 2.28x | $3,643 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7033 MOBILIZATION (EMERGENCY) | 3 EA | $4,990.00 | $844.81 | 5.91x | $12,436 |
| 354-7051 PLANE ASPH CONC PAV(2") | 5,000 SY | $3.65 | $1.86 | 1.97x | $8,965 |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 5,000 LF | $1.25 | $0.5533 | 2.26x | $3,484 |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 5,000 LF | $1.25 | $0.5714 | 2.19x | $3,393 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $85.00 | $217.57 | 0.39x | -$6,629 |
| 500-7002 MOBILIZATION (CALLOUT) | 5 EA | $10.00 | $600.85 | 0.02x | -$2,954 |
| 7010-7002 MAINTENANCE SPEED LIMIT SIGNING | 25 DAY | $1.00 | $117.34 | 0.01x | -$2,908 |
KNIFE RIVER CORPORATION - SOUTH: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,000 SY | $115.00 | $60.19 | 1.91x | $54,809 |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 800 SY | $101.00 | $35.01 | 2.88x | $52,788 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $720.00 | $217.57 | 3.31x | $25,121 |
| 354-7051 PLANE ASPH CONC PAV(2") | 5,000 SY | $6.70 | $1.86 | 3.61x | $24,215 |
| 500-7002 MOBILIZATION (CALLOUT) | 5 EA | $4,550.00 | $600.85 | 7.57x | $19,746 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 25 DAY | $305.00 | $87.82 | 3.47x | $5,430 |
| 3006-7001 UNDERSEAL COURSE | 1,500 GAL | $6.95 | $3.65 | 1.91x | $4,956 |
| 500-7033 MOBILIZATION (EMERGENCY) | 3 EA | $2,453.03 | $844.81 | 2.90x | $4,825 |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 5,000 LF | $1.48 | $0.5533 | 2.67x | $4,634 |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 5,000 LF | $1.48 | $0.5714 | 2.59x | $4,543 |