SH 29 - E of PR 4 to W of RM 3509
0150-05-051 · let Feb 4, 2026 · Burnet, Austin · Overlay
$2,897,632Low bid: LONE STAR PAVING COMPANY-9.8% vs estimate $3,213,452
$78,266Left on the table2.7% gap to the second bid
6BiddersSpread 23% low to high
122Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | LONE STAR PAVING COMPANY | $2,897,632 | -9.8% | $78,266 | 0 | 5-$728,676 | |
| 2 | ALLEN KELLER COMPANY | $2,975,898 | +2.7% | -7.4% | $170,711 | 1+$22,466 | 3-$229,634 |
| 3 | TEXAS MATERIALS GROUP, INC. | $3,146,609 | +8.6% | -2.1% | $361,478 | 0 | 1-$473,850 |
| 4 | BIG CREEK CONSTRUCTION, LTD. | $3,508,087 | +21.1% | 9.2% | $56,538 | 2+$104,947 | 2-$383,946 |
| 5 | HUNTER INDUSTRIES, LTD. | $3,564,626 | +23.0% | 10.9% | $8,558 | 0 | 1-$293,661 |
| 6 | CLARK CONSTRUCTION OF TEXAS, INC. | $3,573,183 | +23.3% | 11.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
LONE STAR PAVING COMPANY vs ALLEN KELLER COMPANY, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $11,800.00 | $282,700.00 | $523,850.32 | $270,900 |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 24,910 SY | $25.75 | $20.54 | $35.01 | -$129,781 |
| 347-7002 TOM-C PG76-22 SAC-B | 14,061 TON | $110.50 | $102.80 | $130.62 | -$108,270 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 3,139 SY | $19.15 | $6.78 | $42.62 | -$38,829 |
| 505-7001 TMA (STATIONARY) | 151 DAY | $10.00 | $236.55 | $217.57 | $34,209 |
| 505-7003 TMA (MOBILE OPERATION) | 49 DAY | $10.00 | $688.09 | $229.60 | $33,226 |
| 134-7001 BACKFILL (TY A) | 372 STA | $135.00 | $59.80 | $224.26 | -$27,974 |
| 354-7049 PLANE ASPH CONC PAV (0"- 1" EDGE MILL) | 34,816 SY | $0.1500 | $0.7200 | $1.18 | $19,845 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $760.00 | $3,592.35 | $11,585.04 | $19,826 |
| 354-7045 PLANE ASPH CONC PAV(0" TO 1" MICRO) | 16,828 SY | $1.65 | $0.7200 | $1.20 | -$15,650 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 5,826 EA | $0.5000 | $3.04 | $1.03 | $14,798 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,736 EA | $0.5000 | $3.07 | $0.5715 | $12,172 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 132 DAY | $10.00 | $96.93 | $87.82 | $11,475 |
| 3007-7001 BONDING COURSE | 24,593 GAL | $3.00 | $3.46 | $3.32 | $11,313 |
| 666-7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL) | 82,514 LF | $0.7700 | $0.6900 | $0.6629 | -$6,601 |
| 666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) | 70,154 LF | $0.7700 | $0.6900 | $0.6515 | -$5,612 |
| 668-7137 PRFB RUMBLE STRIP (BLK)(1')(EDGELINE) | 13,651 LF | $4.00 | $3.59 | $2.68 | -$5,597 |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 1,697 TON | $94.50 | $96.96 | $115.04 | $4,175 |
| 668-7002 PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE) | 6,442 LF | $4.00 | $3.59 | $2.80 | -$2,641 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 500 LF | $8.00 | $4.02 | $5.23 | -$1,990 |
Positive: the low bidder was cheaper on that item. These 20 items account for $88,993 of the $78,266 gap.
LONE STAR PAVING COMPANY: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $11,800.00 | $523,850.32 | 0.02x | -$512,050 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $760.00 | $11,585.04 | 0.07x | -$75,775 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 3,139 SY | $19.15 | $42.62 | 0.45x | -$73,675 |
| 354-7049 PLANE ASPH CONC PAV (0"- 1" EDGE MILL) | 34,816 SY | $0.1500 | $1.18 | 0.13x | -$35,833 |
| 505-7001 TMA (STATIONARY) | 151 DAY | $10.00 | $217.57 | 0.05x | -$31,343 |
ALLEN KELLER COMPANY: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7003 TMA (MOBILE OPERATION) | 49 DAY | $688.09 | $229.60 | 3.00x | $22,466 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 3,139 SY | $6.78 | $42.62 | 0.16x | -$112,504 |
| 134-7001 BACKFILL (TY A) | 372 STA | $59.80 | $224.26 | 0.27x | -$61,181 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $3,592.35 | $11,585.04 | 0.31x | -$55,949 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
BIG CREEK CONSTRUCTION, LTD.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 354-7049 PLANE ASPH CONC PAV (0"- 1" EDGE MILL) | 34,816 SY | $3.25 | $1.18 | 2.76x | $72,097 |
| 505-7003 TMA (MOBILE OPERATION) | 49 DAY | $900.00 | $229.60 | 3.92x | $32,850 |
| 500-7001 MOBILIZATION | 1 LS | $200,000.00 | $523,850.32 | 0.38x | -$323,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $3,000.00 | $11,585.04 | 0.26x | -$60,095 |
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $230,189.53 | $523,850.32 | 0.44x | -$293,661 |