FY26 Littlefield LRA
6499-12-001 · let Apr 21, 2026 · Lamb, Lubbock · Material Maintenance Project
$836,930Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+8.0% vs estimate $775,000
$63,410Left on the table7.6% gap to the second bid
2BiddersSpread 8% low to high
10Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $836,930 | 8.0% | $63,410 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $900,340 | +7.6% | 16.2% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7107 LRA (TY II GR DS) (DEL) (ST1) | 500 TON | $178.42 | $191.89 | $125.06 | $6,735 |
| 8001-7108 LRA (TY II GR DS) (DEL) (ST2) | 500 TON | $173.47 | $186.53 | $141.87 | $6,530 |
| 8001-7110 LRA (TY II GR DS) (DEL) (ST4) | 500 TON | $167.02 | $180.06 | $127.32 | $6,520 |
| 8001-7109 LRA (TY II GR DS) (DEL) (ST3) | 500 TON | $166.59 | $179.61 | $132.08 | $6,510 |
| 8001-7111 LRA (TY II GR DS) (DEL) (ST5) | 500 TON | $161.43 | $174.25 | $127.02 | $6,410 |
| 8001-7009 LRA (TY I GR AA) (DEL) (ST1) | 500 TON | $174.42 | $187.09 | $112.79 | $6,335 |
| 8001-7010 LRA (TY I GR AA) (DEL) (ST2) | 500 TON | $169.47 | $181.73 | $124.75 | $6,130 |
| 8001-7012 LRA (TY I GR AA) (DEL) (ST4) | 500 TON | $163.02 | $175.26 | $124.59 | $6,120 |
| 8001-7011 LRA (TY I GR AA) (DEL) (ST3) | 500 TON | $162.59 | $174.81 | $127.41 | $6,110 |
| 8001-7013 LRA (TY I GR AA) (DEL) (ST5) | 500 TON | $157.43 | $169.45 | $119.67 | $6,010 |
Positive: the low bidder was cheaper on that item. These 10 items account for $63,410 of the $63,410 gap.