Bid Tab X-ray: 6499-12-001

Apr 21, 2026 · Lamb Sign up free
Set your company to personalize scores

FY26 Littlefield LRA

6499-12-001 · let Apr 21, 2026 · Lamb, Lubbock · Material Maintenance Project

$836,930Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+8.0% vs estimate $775,000
$63,410Left on the table7.6% gap to the second bid
2BiddersSpread 8% low to high
10Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $836,9308.0% $63,410 0 0
2MARTIN MARIETTA MATERIALS, INC. $900,340+7.6%16.2% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7107 LRA (TY II GR DS) (DEL) (ST1)500 TON $178.42$191.89$125.06 $6,735
8001-7108 LRA (TY II GR DS) (DEL) (ST2)500 TON $173.47$186.53$141.87 $6,530
8001-7110 LRA (TY II GR DS) (DEL) (ST4)500 TON $167.02$180.06$127.32 $6,520
8001-7109 LRA (TY II GR DS) (DEL) (ST3)500 TON $166.59$179.61$132.08 $6,510
8001-7111 LRA (TY II GR DS) (DEL) (ST5)500 TON $161.43$174.25$127.02 $6,410
8001-7009 LRA (TY I GR AA) (DEL) (ST1)500 TON $174.42$187.09$112.79 $6,335
8001-7010 LRA (TY I GR AA) (DEL) (ST2)500 TON $169.47$181.73$124.75 $6,130
8001-7012 LRA (TY I GR AA) (DEL) (ST4)500 TON $163.02$175.26$124.59 $6,120
8001-7011 LRA (TY I GR AA) (DEL) (ST3)500 TON $162.59$174.81$127.41 $6,110
8001-7013 LRA (TY I GR AA) (DEL) (ST5)500 TON $157.43$169.45$119.67 $6,010

Positive: the low bidder was cheaper on that item. These 10 items account for $63,410 of the $63,410 gap.