SH 29 - FM 1660 to SH 95
0337-02-054 · let Apr 7, 2026 · Williamson, Austin · Overlay
$2,388,456Low bid: LONE STAR PAVING COMPANY-6.9% vs estimate $2,566,159
$281,839Left on the table11.8% gap to the second bid
4BiddersSpread 45% low to high
46Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | LONE STAR PAVING COMPANY | $2,388,456 | -6.9% | $281,839 | 1+$22,931 | 5-$717,310 | |
| 2 | HUNTER INDUSTRIES, LTD. | $2,670,296 | +11.8% | 4.1% | $19,194 | 1+$16,324 | 2-$390,135 |
| 3 | TEXAS MATERIALS GROUP, INC. | $2,689,490 | +12.6% | 4.8% | $780,431 | 0 | 2-$590,985 |
| 4 | KNIFE RIVER CORPORATION - SOUTH | $3,469,920 | +45.3% | 35.2% | 2+$74,945 | 3-$475,219 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
LONE STAR PAVING COMPANY vs HUNTER INDUSTRIES, LTD., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $29,500.00 | $162,350.93 | $523,850.32 | $132,851 |
| 354-7051 PLANE ASPH CONC PAV(2") | 57,449 SY | $0.9900 | $2.20 | $1.86 | $69,513 |
| 341-7056 D-GR HMA TY-D PG76-22 | 6,313 TON | $109.00 | $104.50 | $123.11 | -$28,409 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 5,813 SY | $17.75 | $22.00 | $42.62 | $24,705 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 346 DAY | $5.00 | $73.86 | $87.82 | $23,826 |
| 505-7001 TMA (STATIONARY) | 84 DAY | $10.00 | $142.05 | $217.57 | $11,092 |
| 347-7002 TOM-C PG76-22 SAC-B | 6,556 TON | $128.00 | $129.41 | $130.62 | $9,244 |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 1,833 SY | $46.50 | $50.47 | $49.06 | $7,277 |
| 3007-7001 BONDING COURSE | 20,886 GAL | $3.20 | $3.52 | $3.32 | $6,684 |
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 1 EA | $36,000.00 | $29,393.23 | $13,068.91 | -$6,607 |
| 505-7003 TMA (MOBILE OPERATION) | 17 DAY | $5.00 | $255.68 | $229.60 | $4,262 |
| 134-7002 BACKFILL (TY B) | 350.5 STA | $120.00 | $132.01 | $206.94 | $4,210 |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 537.5 LF | $32.00 | $25.19 | $25.60 | -$3,660 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $820.00 | $2,039.97 | $11,585.04 | $3,660 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 3,324 EA | $1.00 | $1.72 | $0.5715 | $2,393 |
| 454-7010 JOINT SEALANT | 120 LF | $24.00 | $42.52 | $19.36 | $2,222 |
| 668-7137 PRFB RUMBLE STRIP (BLK)(1')(EDGELINE) | 13,786 LF | $3.25 | $3.41 | $2.68 | $2,206 |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 75 TON | $115.00 | $144.10 | $115.04 | $2,183 |
| 104-7006 REMOV CONC (RIPRAP) | 45 SY | $25.00 | $72.60 | $14.32 | $2,142 |
| 666-7265 RE PROFILE PM TY I(W)6"(SLD)(090MIL) | 68,928 LF | $0.7200 | $0.7500 | $0.5887 | $2,068 |
Positive: the low bidder was cheaper on that item. These 20 items account for $271,861 of the $281,839 gap.
LONE STAR PAVING COMPANY: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 1 EA | $36,000.00 | $13,068.91 | 2.75x | $22,931 |
| 500-7001 MOBILIZATION | 1 LS | $29,500.00 | $523,850.32 | 0.06x | -$494,350 |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 5,813 SY | $17.75 | $42.62 | 0.42x | -$144,573 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $820.00 | $11,585.04 | 0.07x | -$32,295 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 346 DAY | $5.00 | $87.82 | 0.06x | -$28,655 |
| 505-7001 TMA (STATIONARY) | 84 DAY | $10.00 | $217.57 | 0.05x | -$17,436 |
HUNTER INDUSTRIES, LTD.: unbalanced items
Placed 2TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 3KNIFE RIVER CORPORATION - SOUTH: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 84 DAY | $895.00 | $217.57 | 4.11x | $56,904 |
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 1 EA | $31,110.00 | $13,068.91 | 2.38x | $18,041 |
| 500-7001 MOBILIZATION | 1 LS | $139,132.00 | $523,850.32 | 0.27x | -$384,718 |
| 3007-7001 BONDING COURSE | 20,886 GAL | $0.2500 | $3.32 | 0.08x | -$64,145 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $2,800.00 | $11,585.04 | 0.24x | -$26,355 |