Bid Tab X-ray: 6500-78-001

May 6, 2026 · Henderson Sign up free
Set your company to personalize scores

MMC HMA Henderson Co

6500-78-001 · let May 6, 2026 · Henderson, Tyler · Material Maintenance Project

$1,561,000Low bid: BIG CREEK CONSTRUCTION, LTD.-14.5% vs estimate $1,826,000
$193,300Left on the table12.4% gap to the second bid
2BiddersSpread 12% low to high
12Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1BIG CREEK CONSTRUCTION, LTD. $1,561,000-14.5% $193,300 0 0
2TEXAS MATERIALS GROUP, INC. $1,754,300+12.4%-3.9% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

BIG CREEK CONSTRUCTION, LTD. vs TEXAS MATERIALS GROUP, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8017-7019 SP MIXTURES SP-D PG64-22 (PICKUP)5,000 TON $94.00$112.00$96.97 $90,000
8017-7020 SP MIXTURES SP-D PG64-22 (DEL)(SITE 1)3,500 TON $112.00$124.00$115.75 $42,000
8017-7011 SP MIXTURES SP-C PG70-22 (DEL)(SITE 1)3,500 TON $116.00$127.00$122.15 $38,500
8017-7010 SP MIXTURES SP-C PG70-22 (PICKUP)1,000 TON $99.00$115.00$104.70 $16,000
8017-7021 SP MIXTURES SP-D PG64-22 (DEL)(SITE 2)200 TON $119.00$124.00$119.57 $1,000
8017-7022 SP MIXTURES SP-D PG64-22 (DEL)(SITE 3)200 TON $119.00$124.00$121.52 $1,000
8017-7023 SP MIXTURES SP-D PG64-22 (DEL)(SITE 4)200 TON $119.00$124.00$118.56 $1,000
8017-7012 SP MIXTURES SP-C PG70-22 (DEL)(SITE 2)200 TON $123.00$127.00$123.37 $800
8017-7013 SP MIXTURES SP-C PG70-22 (DEL)(SITE 3)200 TON $123.00$127.00$125.42 $800
8017-7014 SP MIXTURES SP-C PG70-22 (DEL)(SITE 4)200 TON $123.00$127.00$122.21 $800
8017-7024 SP MIXTURES SP-D PG64-22 (DEL)(SITE 5)200 TON $120.00$124.00$117.18 $800
8017-7015 SP MIXTURES SP-C PG70-22 (DEL)(SITE 5)200 TON $124.00$127.00$121.18 $600

Positive: the low bidder was cheaper on that item. These 12 items account for $193,300 of the $193,300 gap.