Bid Tab X-ray: 6502-35-001

Jun 9, 2026 · Burleson Sign up free
Set your company to personalize scores

FY26 Burleson Hot Mix - 06

6502-35-001 · let Jun 9, 2026 · Burleson, Bryan · Material Maintenance Project

$212,600Low bid: BIG CREEK CONSTRUCTION, LTD.-5.8% vs estimate $225,600
$4,800Left on the table2.3% gap to the second bid
5BiddersSpread 27% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1BIG CREEK CONSTRUCTION, LTD. $212,600-5.8% $4,800 0 0
2KNIFE RIVER CORPORATION - SOUTH $217,400+2.3%-3.6% $5,550 0 0
3TEXAS MATERIALS GROUP, INC. $222,950+4.9%-1.2% $12,350 0 0
4BRAZOS PAVING, INC. $235,300+10.7%4.3% $34,700 0 0
5AMERICAN MATERIALS, INC. $270,000+27.0%19.7% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

BIG CREEK CONSTRUCTION, LTD. vs KNIFE RIVER CORPORATION - SOUTH, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8011-7146 D-GR HMA TY D PG 70-22 (DEL) SITE 12,000 TON $98.00$100.00$117.96 $4,000
8011-7145 D-GR HMA TY D PG 70-22 (PICKUP)200 TON $83.00$87.00$111.44 $800

Positive: the low bidder was cheaper on that item. These 2 items account for $4,800 of the $4,800 gap.