FM 55 FROM NAVARRO COUNTY LINE-145102018
1451-02-018 · let Oct 8, 2025 · Ellis, Dallas · Rehabilitation of Existing Road
$8,523,201Low bid: TEXAS MATERIALS GROUP, INC.-12.4% vs estimate $9,725,831
$159,940Left on the table1.9% gap to the second bid
5BiddersSpread 24% low to high
108Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $8,523,201 | -12.4% | $159,940 | 2+$137,225 | 3-$1,994,551 | |
| 2 | KNIFE RIVER CORPORATION - SOUTH | $8,683,141 | +1.9% | -10.7% | $108,485 | 1+$45,017 | 4-$2,016,852 |
| 3 | BIG CREEK CONSTRUCTION, LTD. | $8,791,626 | +3.1% | -9.6% | $178,833 | 1+$46,029 | 3-$1,927,726 |
| 4 | A. L. HELMCAMP, INC. | $8,970,458 | +5.2% | -7.8% | $1,591,727 | 1+$96,890 | 3-$1,986,470 |
| 5 | GREY SKY CONSTRUCTION LLC | $10,562,186 | +23.9% | 8.6% | 2+$339,116 | 1-$410,600 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs KNIFE RIVER CORPORATION - SOUTH, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 132-7005 EMBANK (FNL)(OC)(TY C) | 11,067.6 CY | $10.00 | $25.00 | $18.71 | $166,014 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $4,100.00 | $12,500.00 | $11,585.04 | $151,200 |
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 72,750 SY | $27.70 | $26.15 | $29.90 | -$112,763 |
| 354-7052 PLANE ASPH CONC PAV(3") | 61,629 SY | $2.75 | $1.25 | $2.92 | -$92,444 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,180.5 CY | $160.00 | $233.00 | $184.74 | $86,177 |
| 105-7053 RMV (2"-8") TRT/UNTRT BASE & ASPH PAV | 3,066 SY | $27.00 | $5.50 | $3.40 | -$65,919 |
| 500-7001 MOBILIZATION | 1 LS | $849,000.00 | $790,000.00 | $523,850.32 | -$59,000 |
| 467-7348 SET (TY II) (30 IN) (RCP) (6: 1) (P) | 24 EA | $3,100.00 | $5,250.00 | $3,539.26 | $51,600 |
| 110-7001 EXCAV (ROADWAY) | 627.8 CY | $115.00 | $34.00 | $11.68 | -$50,852 |
| 112-7001 SUBGR WIDEN (OC) | 231.1 STA | $518.00 | $300.00 | $458.34 | -$50,380 |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 9,438 TON | $134.00 | $130.00 | $130.31 | -$37,752 |
| 247-7209 FL BS (RDWY DEL) (TY D GR 1-2) | 14,848 TON | $34.00 | $36.50 | $51.99 | $37,120 |
| 467-7368 SET (TY II) (36 IN) (RCP) (6: 1) (P) | 16 EA | $7,100.00 | $9,400.00 | $6,359.80 | $36,800 |
| 400-7008 CUT & RESTORE ASPH PAVING | 223 SY | $180.00 | $342.00 | $140.13 | $36,126 |
| 496-7008 REMOV STR (BOX CULVERT) | 164 LF | $30.00 | $250.00 | $85.27 | $36,080 |
| 530-7010 DRIVEWAYS (ACP) | 2,459 SY | $75.00 | $61.00 | $54.96 | -$34,426 |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 32 EA | $1,500.00 | $2,350.00 | $1,883.43 | $27,200 |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 36 EA | $1,190.00 | $1,900.00 | $1,176.76 | $25,560 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $5,600.00 | $18,000.00 | $9,253.78 | $24,800 |
| 104-7005 REMOV CONC (MOWSTRIP) | 2,009 LF | $23.00 | $11.00 | $9.49 | -$24,108 |
Positive: the low bidder was cheaper on that item. These 20 items account for $151,034 of the $159,940 gap.
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 105-7053 RMV (2"-8") TRT/UNTRT BASE & ASPH PAV | 3,066 SY | $27.00 | $3.40 | 7.94x | $72,362 |
| 110-7001 EXCAV (ROADWAY) | 627.8 CY | $115.00 | $11.68 | 9.84x | $64,863 |
| 100-7002 PREPARING ROW | 252.5 STA | $550.00 | $6,072.92 | 0.09x | -$1,394,538 |
| 168-7001 VEGETATIVE WATERING | 55,235 TGL | $0.0100 | $8.43 | 0.00x | -$465,283 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $4,100.00 | $11,585.04 | 0.35x | -$134,731 |
KNIFE RIVER CORPORATION - SOUTH: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 400-7008 CUT & RESTORE ASPH PAVING | 223 SY | $342.00 | $140.13 | 2.44x | $45,017 |
| 100-7002 PREPARING ROW | 252.5 STA | $550.00 | $6,072.92 | 0.09x | -$1,394,538 |
| 168-7001 VEGETATIVE WATERING | 55,235 TGL | $0.0100 | $8.43 | 0.00x | -$465,283 |
| 354-7052 PLANE ASPH CONC PAV(3") | 61,629 SY | $1.25 | $2.92 | 0.43x | -$102,945 |
| 505-7001 TMA (STATIONARY) | 267 DAY | $15.00 | $217.57 | 0.07x | -$54,087 |
BIG CREEK CONSTRUCTION, LTD.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 110-7001 EXCAV (ROADWAY) | 627.8 CY | $85.00 | $11.68 | 7.28x | $46,029 |
| 100-7002 PREPARING ROW | 252.5 STA | $1,000.00 | $6,072.92 | 0.16x | -$1,280,913 |
| 168-7001 VEGETATIVE WATERING | 55,235 TGL | $0.0100 | $8.43 | 0.00x | -$465,283 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $1,500.00 | $11,585.04 | 0.13x | -$181,531 |
A. L. HELMCAMP, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 105-7053 RMV (2"-8") TRT/UNTRT BASE & ASPH PAV | 3,066 SY | $35.00 | $3.40 | 10.30x | $96,890 |
| 100-7002 PREPARING ROW | 252.5 STA | $300.00 | $6,072.92 | 0.05x | -$1,457,663 |
| 168-7001 VEGETATIVE WATERING | 55,235 TGL | $0.1500 | $8.43 | 0.02x | -$457,550 |
| 112-7001 SUBGR WIDEN (OC) | 231.1 STA | $150.00 | $458.34 | 0.33x | -$71,258 |