| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$16,500.00 |
$10,000.00 |
$3,670.36 |
$65,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 10,352 | CY |
$13.00 |
$11.65 |
$7.00 |
$17.95 |
$46.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$16,575.00 |
$10,000.00 |
$14,681.46 |
$98,500.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,336 | LF |
$3.50 |
$2.48 |
$3.00 |
$2.68 |
$4.50 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 203 | LF |
$18.60 |
$16.50 |
$18.00 |
$17.83 |
$20.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 20,320 | SY |
$4.00 |
$3.60 |
$3.50 |
$3.52 |
$4.80 |
| 70 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,461 | CY |
$90.00 |
$80.00 |
$50.00 |
$65.57 |
$68.00 |
| 80 | 325 0100 |
SEPARATOR FABRIC | 5,681 | SY |
$3.00 |
$4.09 |
$2.00 |
$2.59 |
$2.50 |
| 90 | 407(B)7300 |
TACK COAT | 402 | GAL |
$5.30 |
$5.00 |
$4.00 |
$4.17 |
$1.25 |
| 100 | 408 8100 |
PRIME COAT | 1,367 | GAL |
$6.70 |
$6.00 |
$4.50 |
$4.77 |
$5.00 |
| 110 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,197 | TON |
$151.00 |
$112.70 |
$120.00 |
$130.30 |
$131.25 |
| 120 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 600 | TON |
$176.00 |
$142.60 |
$130.00 |
$129.98 |
$143.75 |
| 130 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 0.91 | CY |
$1,430.00 |
$2,650.00 |
$1,200.00 |
$2,540.82 |
$2,500.00 |
| 140 | 511(A)2200 |
REINFORCING STEEL | 61 | LB |
$1.70 |
$3.65 |
$2.00 |
$10.98 |
$5.00 |
| 150 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 165 | TON |
$76.00 |
$57.55 |
$75.00 |
$110.61 |
$150.00 |
| 160 | 611(A)7252 |
PRECAST CONC RND 4' DIA MANHOLE | 1 | EA |
$2,500.00 |
$3,850.00 |
$7,500.00 |
$6,055.26 |
$7,850.00 |
| 170 | 613(A)5204 |
15" R.C.PIPE CLASS III | 16 | LF |
$100.00 |
$125.00 |
$100.00 |
$274.11 |
$185.00 |
| 180 | 613(A)5208 |
18" R.C.PIPE CLASS III | 33 | LF |
$112.00 |
$120.00 |
$110.00 |
$154.58 |
$196.00 |
| 190 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 122 | LF |
$64.00 |
$47.00 |
$100.00 |
$71.82 |
$180.00 |
| 200 | 613(L)6704 |
15" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$363.00 |
$1,413.00 |
$1,200.00 |
$1,513.81 |
$3,950.00 |
| 210 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$826.00 |
$426.00 |
$1,500.00 |
$1,635.45 |
$4,500.00 |
| 220 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 5.83 | CY |
$68.00 |
$180.00 |
$70.00 |
$665.34 |
$105.00 |
| 230 | 613(V)8000 |
TRENCH EXCAVATION | 30 | CY |
$21.00 |
$24.25 |
$35.00 |
$367.04 |
$500.00 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$18,750.00 |
$5,000.00 |
$12,846.27 |
$25,000.00 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,563 | SY |
$9.50 |
$5.97 |
$10.00 |
$12.08 |
$15.00 |
| 260 | 619(C)6600 |
SAWING PAVEMENT | 88 | LF |
$9.00 |
$9.75 |
$7.00 |
$14.27 |
$26.00 |
| 270 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$37.00 |
$22.00 |
$25.00 |
$33.39 |
$70.00 |
| 280 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,156.00 |
$2,100.00 |
$3,100.00 |
$1,788.67 |
$9,500.00 |
| 290 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,932.00 |
$2,500.00 |
$3,300.00 |
$3,577.34 |
$7,800.00 |
| 300 | 626(A)5200 |
MONUMENTS | 1 | EA |
$1,000.00 |
$2,000.00 |
$7,500.00 |
$3,670.36 |
$6,900.00 |
| 310 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$300.00 |
$250.00 |
$500.00 |
$238.49 |
$1,500.00 |
| 320 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$27.50 |
$17.75 |
$10.00 |
$66.73 |
$105.00 |
| 330 | 501(G)1800 |
CLSM BACKFILL | 102 | CY |
$272.00 |
$235.00 |
$350.00 |
$574.48 |
$350.00 |
| 340 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$376.00 |
$350.00 |
$375.00 |
$578.13 |
$495.00 |
| 350 | 504(B)5300 |
SAW-CUT GROOVING | 254.4 | SY |
$12.00 |
$11.00 |
$10.00 |
$10.97 |
$52.00 |
| 360 | 504(D)5410 |
CONCRETE RAIL (TR3) | 281.3 | LF |
$110.00 |
$109.00 |
$120.00 |
$108.62 |
$399.00 |
| 370 | 506(A)7200 |
STRUCTURAL STEEL | 330 | LB |
$6.00 |
$4.00 |
$10.00 |
$24.33 |
$5.90 |
| 380 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,357.00 |
$1,410.00 |
$1,500.00 |
$5,524.89 |
$3,850.00 |
| 390 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,626.00 |
$1,410.00 |
$1,500.00 |
$6,055.26 |
$3,950.00 |
| 400 | 509(A)0210 |
CLASS AA CONCRETE | 81.4 | CY |
$1,338.00 |
$1,030.00 |
$1,000.00 |
$1,360.35 |
$1,250.00 |
| 410 | 509(B)0320 |
CLASS A CONCRETE | 80.3 | CY |
$1,126.00 |
$1,105.00 |
$1,000.00 |
$671.72 |
$1,800.00 |
| 420 | 511(A)2210 |
REINFORCING STEEL | 11,480 | LB |
$1.70 |
$1.36 |
$2.00 |
$6.27 |
$2.60 |
| 430 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 20,980 | LB |
$2.20 |
$1.73 |
$2.00 |
$1.88 |
$3.50 |
| 440 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 86 | LF |
$59.00 |
$80.00 |
$80.00 |
$47.78 |
$85.00 |
| 450 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 210 | LF |
$68.00 |
$96.00 |
$80.00 |
$73.82 |
$91.00 |
| 460 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 86 | LF |
$24.00 |
$20.00 |
$50.00 |
$613.33 |
$55.00 |
| 470 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 210 | LF |
$25.00 |
$24.00 |
$50.00 |
$268.65 |
$60.00 |
| 480 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 490 | 517 9110 |
ELASTOMERIC COATING | 131.2 | SF |
$27.00 |
$26.40 |
$26.00 |
$28.62 |
$25.00 |
| 500 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,270 | TON |
$57.00 |
$55.25 |
$100.00 |
$79.25 |
$115.00 |
| 510 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 570 | TON |
$46.00 |
$43.10 |
$80.00 |
$80.85 |
$150.00 |
| 520 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 2,270 | SY |
$3.60 |
$5.55 |
$3.00 |
$3.94 |
$5.00 |
| 530 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$42.00 |
$60.00 |
$30.00 |
$23.24 |
$45.00 |
| 540 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 110 | LF |
$37.00 |
$58.50 |
$30.00 |
$15.93 |
$45.00 |
| 550 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 20.36 | SF |
$49.00 |
$35.00 |
$85.00 |
$33.39 |
$32.00 |
| 560 | 851(C)2415 |
2" SQUARE TUBE POST | 50 | LF |
$12.00 |
$10.00 |
$10.00 |
$29.81 |
$30.00 |
| 570 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 6,607 | LF |
$1.40 |
$1.00 |
$1.50 |
$2.38 |
$2.90 |
| 580 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 22 | LF |
$20.00 |
$10.00 |
$17.00 |
$29.81 |
$30.00 |
| 590 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,260 | SD |
$0.8500 |
$0.0800 |
$0.0200 |
$2.38 |
$2.90 |
| 600 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 360 | SD |
$1.90 |
$12.00 |
$0.0200 |
$3.58 |
$3.80 |
| 610 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$2.20 |
$0.0800 |
$0.0200 |
$4.77 |
$5.00 |
| 620 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 360 | SD |
$2.00 |
$12.00 |
$4.00 |
$2.38 |
$3.00 |
| 630 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 720 | SD |
$1.20 |
$10.00 |
$1.00 |
$0.6600 |
$1.00 |
| 640 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$14,250.00 |
$15,000.00 |
$17,707.83 |
$25,000.00 |
| 650 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,875.00 |
$3,500.00 |
$3,577.34 |
$18,500.00 |
| 660 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$99,100.00 |
$78,000.00 |
$100,000.00 |
$27,960.85 |
$185,000.00 |