| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$200,000.00 |
$134,739.00 |
$100,000.00 |
$255,155.00 |
$160,000.00 |
$178,349.69 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 58,197 | CY |
$12.00 |
$11.00 |
$5.50 |
$10.50 |
$12.70 |
$22.55 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 300 | CY |
$25.00 |
$55.00 |
$25.00 |
$65.00 |
$55.00 |
$159.72 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$130,000.00 |
$89,947.00 |
$100,000.00 |
$184,975.00 |
$110,000.00 |
$167,787.16 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 8,842 | LF |
$4.00 |
$5.50 |
$3.16 |
$3.16 |
$5.00 |
$4.10 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,435 | LF |
$15.50 |
$16.50 |
$15.94 |
$15.94 |
$22.00 |
$20.72 |
| 70 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 103 | CY |
$100.00 |
$99.00 |
$125.00 |
$125.00 |
$150.00 |
$314.63 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 3 | EA |
$300.00 |
$330.00 |
$215.00 |
$215.00 |
$1,000.00 |
$279.29 |
| 90 | 227 4110 |
(SP)TURF REINFORCEMENT MAT TYPE 2 | 9,500 | SY |
$16.50 |
$8.80 |
$17.75 |
$17.75 |
$21.00 |
$23.06 |
| 100 | 230(A)7200 |
SOLID SLAB SODDING | 98,694 | SY |
$3.50 |
$4.62 |
$3.61 |
$3.61 |
$7.55 |
$4.69 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 20.39 | AC |
$1,500.00 |
$1,320.00 |
$1,000.00 |
$1,625.00 |
$2,000.00 |
$2,110.88 |
| 120 | 241 3100 |
MOWING | 81 | AC |
$300.00 |
$220.00 |
$280.00 |
$280.00 |
$300.00 |
$363.72 |
| 130 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 19,145 | CY |
$65.00 |
$59.57 |
$80.00 |
$56.00 |
$71.00 |
$134.93 |
| 140 | 307(K)4200 |
STABILIZED SUBGRADE | 95,374 | SY |
$9.00 |
$7.68 |
$8.00 |
$6.60 |
$8.30 |
$10.39 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 93,445 | SY |
$2.60 |
$1.07 |
$1.75 |
$1.05 |
$1.40 |
$1.74 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,835 | TON |
$37.00 |
$39.22 |
$75.00 |
$26.00 |
$40.00 |
$56.47 |
| 170 | 407(B)7300 |
TACK COAT | 5,848 | GAL |
$4.00 |
$3.36 |
$3.00 |
$3.10 |
$4.00 |
$4.17 |
| 180 | 408 8100 |
PRIME COAT | 49,410 | GAL |
$3.50 |
$3.95 |
$4.25 |
$3.40 |
$5.50 |
$5.91 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 13,264 | TON |
$110.00 |
$108.51 |
$95.00 |
$129.80 |
$119.00 |
$129.90 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,758 | TON |
$135.00 |
$123.85 |
$100.00 |
$140.26 |
$126.00 |
$138.99 |
| 210 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 26 | CY |
$50.00 |
$33.00 |
$29.00 |
$30.00 |
$32.59 |
$50.85 |
| 220 | 501(G)1810 |
CLSM BACKFILL | 125 | CY |
$220.00 |
$330.00 |
$341.00 |
$300.00 |
$300.00 |
$296.56 |
| 230 | 502 3101 |
TEMPORARY EARTH RETAINAGE | 414 | LF |
$600.00 |
$753.93 |
$190.00 |
$250.00 |
$700.00 |
$890.32 |
| 240 | 506(A)7200 |
STRUCTURAL STEEL | 800 | LB |
$3.25 |
$2.75 |
$9.00 |
$2.50 |
$3.00 |
$4.10 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 271 | CY |
$700.00 |
$715.00 |
$2,010.00 |
$650.00 |
$725.00 |
$1,176.90 |
| 260 | 509(B)0300 |
CLASS A CONCRETE | 127 | CY |
$800.00 |
$715.00 |
$1,450.00 |
$650.00 |
$725.00 |
$1,239.70 |
| 270 | 509(D)0500 |
CLASS C CONCRETE | 2,359 | CY |
$415.00 |
$313.50 |
$390.00 |
$285.00 |
$310.00 |
$573.91 |
| 280 | 511(A)2200 |
REINFORCING STEEL | 53,336 | LB |
$1.60 |
$2.20 |
$1.84 |
$2.00 |
$2.20 |
$1.56 |
| 290 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 815 | TON |
$60.00 |
$81.79 |
$78.79 |
$90.00 |
$98.00 |
$87.52 |
| 300 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 100 | TON |
$60.00 |
$88.87 |
$74.16 |
$90.00 |
$98.00 |
$82.32 |
| 310 | 611(G)9000 |
INLET CDI RCP DES. 1 | 3 | EA |
$4,750.00 |
$3,850.00 |
$3,000.00 |
$4,000.00 |
$3,810.00 |
$5,757.03 |
| 320 | 611(L)1600 |
JUNCTION BOXES | 299 | CF |
$150.00 |
$66.00 |
$200.00 |
$60.00 |
$66.00 |
$70.23 |
| 330 | 613(A)5208 |
18" R.C.PIPE CLASS III | 119 | LF |
$110.00 |
$82.06 |
$75.00 |
$74.60 |
$82.00 |
$95.61 |
| 340 | 613(A)5216 |
24" R.C.PIPE CLASS III | 42 | LF |
$130.00 |
$139.26 |
$95.00 |
$126.60 |
$138.00 |
$231.09 |
| 350 | 613(A)5220 |
30" R.C.PIPE CLASS III | 86 | LF |
$165.00 |
$129.52 |
$108.00 |
$117.75 |
$128.00 |
$168.43 |
| 360 | 613(A)5224 |
36" R.C.PIPE CLASS III | 38 | LF |
$210.00 |
$190.96 |
$185.00 |
$173.60 |
$190.00 |
$203.87 |
| 370 | 613(A)5248 |
72" R.C.PIPE CLASS III | 157 | LF |
$515.00 |
$412.06 |
$528.00 |
$374.60 |
$380.00 |
$662.98 |
| 380 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 244 | LF |
$170.00 |
$116.49 |
$107.00 |
$105.90 |
$116.00 |
$269.87 |
| 390 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 136 | LF |
$55.00 |
$48.40 |
$36.00 |
$44.00 |
$48.00 |
$85.50 |
| 400 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 36 | LF |
$75.00 |
$55.28 |
$48.00 |
$50.25 |
$55.00 |
$128.68 |
| 410 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 88 | LF |
$100.00 |
$68.64 |
$62.00 |
$62.40 |
$68.00 |
$138.47 |
| 420 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 900 | LF |
$60.00 |
$48.95 |
$37.00 |
$44.50 |
$49.00 |
$90.03 |
| 430 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$70.00 |
$61.60 |
$45.00 |
$56.00 |
$61.00 |
$98.87 |
| 440 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,856 | LF |
$30.00 |
$27.50 |
$30.00 |
$31.00 |
$34.00 |
$60.20 |
| 450 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 619 | LF |
$25.00 |
$22.00 |
$30.00 |
$31.00 |
$34.00 |
$60.20 |
| 460 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 48 | EA |
$310.00 |
$213.40 |
$225.00 |
$194.00 |
$211.00 |
$1,175.62 |
| 470 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 12 | EA |
$1,600.00 |
$1,017.50 |
$1,000.00 |
$925.00 |
$1,010.00 |
$1,271.53 |
| 480 | 613(L)6624 |
28" X 20" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,500.00 |
$330.00 |
$275.00 |
$300.00 |
$330.00 |
$1,271.54 |
| 490 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$900.00 |
$253.00 |
$800.00 |
$230.00 |
$250.00 |
$1,196.47 |
| 500 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,200.00 |
$350.90 |
$850.00 |
$319.00 |
$350.00 |
$2,299.30 |
| 510 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,500.00 |
$1,887.60 |
$1,800.00 |
$1,716.00 |
$1,900.00 |
$2,621.60 |
| 520 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,000.00 |
$3,000.25 |
$2,200.00 |
$3,000.00 |
$2,750.00 |
$3,768.62 |
| 530 | 613(L)6752 |
72" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$5,000.00 |
$4,400.00 |
$1,500.00 |
$6,500.00 |
$6,600.00 |
$14,105.87 |
| 540 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$2,600.00 |
$1,650.00 |
$2,085.62 |
$1,500.00 |
$1,650.00 |
$1,956.46 |
| 550 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$75,000.00 |
$81,037.00 |
$100,000.00 |
$126,478.00 |
$90,000.00 |
$60,005.11 |
| 560 | 619(B)6352 |
REMOVAL OF FENCE | 11,016 | LF |
$2.00 |
$0.5500 |
$2.00 |
$1.50 |
$1.70 |
$3.93 |
| 570 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 59,000 | SY |
$6.00 |
$2.89 |
$1.00 |
$6.85 |
$4.30 |
$6.01 |
| 580 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 569 | LF |
$7.50 |
$6.12 |
$7.00 |
$7.00 |
$6.00 |
$7.79 |
| 590 | 619(C)6600 |
SAWING PAVEMENT | 156 | LF |
$5.50 |
$14.12 |
$3.50 |
$3.00 |
$5.00 |
$9.25 |
| 600 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 662.5 | LF |
$35.00 |
$33.00 |
$30.00 |
$30.00 |
$31.00 |
$29.88 |
| 610 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$3,200.00 |
$2,475.00 |
$2,250.00 |
$2,250.00 |
$2,800.00 |
$3,247.52 |
| 620 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 10 | EA |
$3,750.00 |
$3,025.00 |
$2,750.00 |
$2,750.00 |
$4,400.00 |
$4,351.67 |
| 630 | 624(A)3200 |
FENCE-STYLE WWF | 513 | LF |
$14.00 |
$12.02 |
$10.93 |
$10.93 |
$12.00 |
$14.20 |
| 640 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 10,301 | LF |
$10.00 |
$5.91 |
$5.37 |
$5.37 |
$6.00 |
$6.98 |
| 650 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 4,412 | LF |
$10.00 |
$7.27 |
$6.61 |
$6.61 |
$7.50 |
$8.59 |
| 660 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 7 | EA |
$250.00 |
$165.00 |
$150.00 |
$150.00 |
$163.00 |
$2.92 |
| 670 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$75.00 |
$55.00 |
$50.00 |
$100.00 |
$109.00 |
$129.90 |
| 680 | 504(A)5200 |
APPROACH SLAB | 125.2 | SY |
$300.00 |
$275.00 |
$390.00 |
$250.00 |
$425.00 |
$362.53 |
| 690 | 504(B)5300 |
SAW-CUT GROOVING | 115.6 | SY |
$10.00 |
$38.50 |
$17.00 |
$14.00 |
$19.00 |
$18.19 |
| 700 | 504(D)5410 |
CONCRETE RAIL (TR3) | 80 | LF |
$100.00 |
$132.00 |
$230.00 |
$120.00 |
$250.00 |
$159.27 |
| 710 | 511 2100 |
MECHANICAL SPLICES | 42 | EA |
$150.00 |
$33.00 |
$50.00 |
$30.00 |
$55.00 |
$66.16 |
| 720 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$19,800.00 |
$35,000.00 |
$45,000.00 |
$22,000.00 |
$14,117.84 |
| 730 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 230 | CY |
$16.00 |
$27.50 |
$14.00 |
$30.00 |
$30.00 |
$35.68 |
| 740 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 106 | CY |
$50.00 |
$33.00 |
$30.00 |
$40.00 |
$35.00 |
$34.76 |
| 750 | 509(A)0210 |
CLASS AA CONCRETE | 206.6 | CY |
$900.00 |
$715.00 |
$1,100.00 |
$650.00 |
$710.00 |
$877.35 |
| 760 | 511(A)2210 |
REINFORCING STEEL | 31,100 | LB |
$1.50 |
$2.20 |
$1.20 |
$2.00 |
$2.20 |
$2.14 |
| 770 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$19,800.00 |
$35,000.00 |
$45,000.00 |
$36,000.00 |
$21,866.33 |
| 780 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$11,000.00 |
$35,000.00 |
$45,000.00 |
$13,000.00 |
$15,614.99 |
| 790 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$30.00 |
$27.50 |
$25.00 |
$25.00 |
$28.00 |
$36.45 |
| 800 | 501(G)1800 |
CLSM BACKFILL | 48 | CY |
$250.00 |
$346.50 |
$315.00 |
$300.00 |
$345.00 |
$236.40 |
| 810 | 504(A)5200 |
APPROACH SLAB | 115 | SY |
$300.00 |
$429.00 |
$390.00 |
$320.00 |
$425.00 |
$338.08 |
| 820 | 504(B)5300 |
SAW-CUT GROOVING | 334.5 | SY |
$10.00 |
$13.20 |
$12.00 |
$8.00 |
$13.00 |
$10.39 |
| 830 | 504(D)5410 |
CONCRETE RAIL (TR3) | 256.6 | LF |
$100.00 |
$167.20 |
$152.00 |
$115.00 |
$165.00 |
$137.44 |
| 840 | 506(A)7200 |
STRUCTURAL STEEL | 87,680 | LB |
$3.50 |
$3.85 |
$2.30 |
$3.00 |
$3.30 |
$3.47 |
| 850 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$800.00 |
$783.20 |
$712.00 |
$475.00 |
$775.00 |
$471.84 |
| 860 | 509(A)0210 |
CLASS AA CONCRETE | 93.2 | CY |
$800.00 |
$1,155.00 |
$1,020.00 |
$1,070.00 |
$1,140.00 |
$1,320.82 |
| 870 | 509(B)0320 |
CLASS A CONCRETE | 39.2 | CY |
$1,000.00 |
$1,155.00 |
$1,020.00 |
$1,145.00 |
$1,140.00 |
$2,114.43 |
| 880 | 511(A)2210 |
REINFORCING STEEL | 24,320 | LB |
$1.50 |
$1.25 |
$1.14 |
$1.30 |
$1.25 |
$2.12 |
| 890 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 468 | LF |
$75.00 |
$66.00 |
$55.00 |
$55.75 |
$65.00 |
$51.59 |
| 900 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 468 | LF |
$22.00 |
$16.50 |
$15.00 |
$14.00 |
$17.00 |
$58.95 |
| 910 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 920 | 523(A)3200 |
SEALER CRACK PREPARATION | 100 | LF |
$8.00 |
$13.20 |
$12.00 |
$7.00 |
$13.00 |
$9.09 |
| 930 | 523(B)3300 |
SEALER RESIN | 1 | GAL |
$250.00 |
$220.00 |
$200.00 |
$225.00 |
$220.00 |
$292.28 |
| 940 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,300 | TON |
$65.00 |
$74.80 |
$68.00 |
$70.00 |
$73.00 |
$76.27 |
| 950 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 470 | TON |
$55.00 |
$70.40 |
$64.00 |
$43.50 |
$70.00 |
$59.04 |
| 960 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$60.00 |
$36.30 |
$33.00 |
$57.00 |
$36.00 |
$42.61 |
| 970 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 36 | LF |
$60.00 |
$36.30 |
$33.00 |
$67.00 |
$36.00 |
$42.61 |
| 980 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$27,500.00 |
$50,000.00 |
$45,000.00 |
$32,000.00 |
$25,869.96 |
| 990 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 18 | EA |
$125.00 |
$55.00 |
$50.00 |
$50.00 |
$82.00 |
$97.43 |
| 1,000 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$250.00 |
$275.00 |
$250.00 |
$250.00 |
$815.00 |
$129.90 |
| 1,010 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 86 | SF |
$35.00 |
$27.50 |
$25.00 |
$25.00 |
$33.00 |
$67.55 |
| 1,020 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 96 | LF |
$13.00 |
$11.00 |
$10.00 |
$10.00 |
$12.00 |
$15.26 |
| 1,030 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 30 | EA |
$45.00 |
$27.50 |
$25.00 |
$25.00 |
$51.00 |
$64.95 |
| 1,040 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 90,701 | LF |
$0.7000 |
$0.5900 |
$0.5400 |
$0.5400 |
$0.8000 |
$1.27 |
| 1,050 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 33 | LF |
$20.00 |
$27.50 |
$25.00 |
$25.00 |
$27.00 |
$32.48 |
| 1,060 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 104 | SD |
$195.00 |
$313.50 |
$285.00 |
$285.00 |
$195.00 |
$240.32 |
| 1,070 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 90,701 | LF |
$0.2500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.2000 |
$0.3900 |
| 1,080 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 3,234 | LF |
$0.5000 |
$0.5500 |
$0.5000 |
$0.5000 |
$1.10 |
$0.7800 |
| 1,090 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 414 | SD |
$20.00 |
$27.50 |
$25.00 |
$25.00 |
$15.00 |
$23.24 |
| 1,100 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 345 | LF |
$20.00 |
$92.23 |
$45.00 |
$55.00 |
$75.00 |
$37.67 |
| 1,110 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,070 | LF |
$8.00 |
$5.48 |
$25.00 |
$30.00 |
$18.00 |
$12.02 |
| 1,120 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,340 | SD |
$0.7500 |
$1.10 |
$1.00 |
$1.00 |
$3.00 |
$1.30 |
| 1,130 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,125 | SD |
$1.50 |
$1.10 |
$1.00 |
$1.00 |
$1.65 |
$0.6500 |
| 1,140 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$2.00 |
$3.30 |
$3.00 |
$3.00 |
$3.00 |
$2.60 |
| 1,150 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,470 | SD |
$1.50 |
$0.5500 |
$0.5000 |
$0.5000 |
$1.35 |
$0.1300 |
| 1,160 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 20,280 | SD |
$0.7000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.5500 |
$0.1300 |
| 1,170 | 880(F)6700 |
DRUMS | 18,750 | SD |
$0.6000 |
$0.2800 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.0600 |
| 1,180 | 880(G)6805 |
CHANNELIZER CONES | 36,375 | SD |
$0.6500 |
$0.2800 |
$0.2500 |
$0.2500 |
$0.5500 |
$1.30 |
| 1,190 | 880(I)7000 |
FLAGGER | 285 | SD |
$167.00 |
$189.47 |
$10.00 |
$50.00 |
$475.00 |
$149.67 |
| 1,200 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 778 | SD |
$20.00 |
$27.50 |
$25.00 |
$25.00 |
$15.00 |
$21.43 |
| 1,210 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$31,246.32 |
$165,000.00 |
$118,455.00 |
$135,000.00 |
$39,164.16 |
| 1,220 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$30,000.00 |
$12,156.67 |
$150,000.00 |
$30,000.00 |
$30,000.00 |
$3,247.51 |
| 1,230 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$14,500.00 |
$23,400.00 |
$40,000.00 |
$30,000.00 |
$20,000.00 |
$9,729.55 |
| 1,240 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$513,469.73 |
$453,334.67 |
$500,000.00 |
$963,414.01 |
$495,000.00 |
$453,691.60 |