| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,500.00 |
$8,500.00 |
$10,000.00 |
$35,950.00 |
$8,850.00 |
$9,378.36 |
$12,875.00 |
$22,000.00 |
$30,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 196 | CY |
$25.00 |
$12.00 |
$20.00 |
$37.00 |
$85.00 |
$29.14 |
$39.40 |
$15.00 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 50 | CY |
$36.00 |
$60.00 |
$50.00 |
$70.00 |
$10.00 |
$96.34 |
$61.80 |
$35.00 |
$30.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$1,250.00 |
$8,500.00 |
$6,454.00 |
$6,500.00 |
$3,835.63 |
$7,725.00 |
$10,000.00 |
$30,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 570 | LF |
$5.00 |
$2.00 |
$2.00 |
$2.60 |
$5.00 |
$3.07 |
$5.09 |
$5.00 |
$4.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 35 | LF |
$22.00 |
$8.00 |
$5.00 |
$8.25 |
$30.00 |
$9.82 |
$60.77 |
$10.00 |
$20.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 480 | SY |
$8.00 |
$10.00 |
$2.90 |
$4.65 |
$20.00 |
$5.52 |
$25.75 |
$7.00 |
$6.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.38 | AC |
$2,170.00 |
$2,500.00 |
$500.00 |
$1,240.00 |
$200.00 |
$1,472.82 |
$15,347.00 |
$500.00 |
$2,000.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 249 | CY |
$91.00 |
$70.00 |
$75.00 |
$143.50 |
$78.85 |
$71.28 |
$73.13 |
$86.00 |
$70.00 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 1,160 | SY |
$4.00 |
$1.50 |
$2.00 |
$3.90 |
$4.70 |
$1.51 |
$2.06 |
$3.00 |
$4.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 44 | TON |
$56.00 |
$35.00 |
$60.00 |
$73.70 |
$44.90 |
$65.42 |
$71.63 |
$60.00 |
$55.00 |
| 120 | 407(B)7300 |
TACK COAT | 65 | GAL |
$7.00 |
$6.00 |
$5.00 |
$15.50 |
$6.50 |
$6.52 |
$6.69 |
$25.00 |
$7.00 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 248 | TON |
$178.00 |
$160.00 |
$140.00 |
$165.50 |
$188.00 |
$137.83 |
$166.86 |
$215.00 |
$230.00 |
| 140 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 122 | TON |
$215.00 |
$190.00 |
$150.00 |
$165.50 |
$273.00 |
$160.43 |
$245.14 |
$265.65 |
$325.00 |
| 150 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$540.00 |
$600.00 |
$850.00 |
$325.00 |
$325.00 |
$507.99 |
$732.92 |
$375.00 |
$750.00 |
| 160 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$8,000.00 |
$17,145.00 |
$5,850.00 |
$5,833.76 |
$5,150.00 |
$10,000.00 |
$5,000.00 |
| 170 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 673 | SY |
$14.00 |
$2.50 |
$5.00 |
$9.85 |
$6.75 |
$20.38 |
$4.37 |
$15.00 |
$30.00 |
| 180 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 330 | LF |
$12.00 |
$7.00 |
$8.50 |
$7.75 |
$11.85 |
$9.21 |
$8.24 |
$18.00 |
$12.00 |
| 190 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 337 | LF |
$15.00 |
$8.00 |
$10.00 |
$7.75 |
$12.95 |
$9.21 |
$9.78 |
$19.00 |
$12.00 |
| 200 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$27.00 |
$35.00 |
$20.00 |
$16.10 |
$14.00 |
$18.91 |
$30.90 |
$25.00 |
$30.00 |
| 210 | 501(G)1800 |
CLSM BACKFILL | 110 | CY |
$266.00 |
$250.00 |
$220.00 |
$202.00 |
$278.00 |
$282.71 |
$331.77 |
$315.00 |
$375.00 |
| 220 | 503(A)4200 |
PRESTRESSED CONCRETE BEAMS | 280 | LF |
$400.00 |
$392.00 |
$333.20 |
$418.00 |
$443.50 |
$381.19 |
$309.79 |
$485.00 |
$475.00 |
| 230 | 504(B)5300 |
SAW-CUT GROOVING | 124.22 | SY |
$14.00 |
$14.00 |
$18.00 |
$14.50 |
$14.00 |
$17.18 |
$15.45 |
$17.00 |
$24.00 |
| 240 | 504(D)5420 |
CONCRETE RAIL (TR4) | 112 | LF |
$157.00 |
$120.00 |
$142.00 |
$170.50 |
$126.75 |
$117.39 |
$160.82 |
$160.00 |
$120.00 |
| 250 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 28 | EA |
$352.00 |
$150.00 |
$255.00 |
$161.50 |
$225.00 |
$279.79 |
$325.57 |
$250.00 |
$750.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 25.42 | CY |
$1,524.00 |
$900.00 |
$1,385.00 |
$1,007.00 |
$1,218.00 |
$1,221.63 |
$1,263.56 |
$1,400.00 |
$1,500.00 |
| 270 | 509(B)0320 |
CLASS A CONCRETE | 51.68 | CY |
$1,243.00 |
$1,000.00 |
$1,200.00 |
$850.00 |
$1,155.00 |
$1,378.66 |
$1,263.56 |
$1,200.00 |
$1,000.00 |
| 280 | 511(A)2210 |
REINFORCING STEEL | 10,780 | LB |
$2.00 |
$1.25 |
$1.85 |
$1.65 |
$1.74 |
$1.80 |
$2.39 |
$2.00 |
$2.20 |
| 290 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 230 | LF |
$55.00 |
$46.00 |
$45.00 |
$65.50 |
$83.00 |
$55.71 |
$63.05 |
$65.00 |
$65.00 |
| 300 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 10 | LF |
$24.00 |
$20.00 |
$100.00 |
$457.50 |
$10.00 |
$948.74 |
$20.60 |
$15.00 |
$200.00 |
| 310 | 514(K)6200 |
(PL)PILOT HOLES | 190 | LF |
$240.00 |
$250.00 |
$250.00 |
$179.50 |
$305.00 |
$290.83 |
$269.55 |
$328.00 |
$280.00 |
| 320 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 60.7 | SY |
$8.00 |
$8.20 |
$9.50 |
$8.50 |
$8.20 |
$10.06 |
$9.47 |
$7.30 |
$6.00 |
| 330 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 350 | TON |
$70.00 |
$45.00 |
$55.00 |
$52.00 |
$57.00 |
$48.37 |
$76.22 |
$71.00 |
$80.00 |
| 340 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 50 | TON |
$60.00 |
$35.00 |
$35.00 |
$38.00 |
$45.95 |
$34.64 |
$88.58 |
$65.00 |
$60.00 |
| 350 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$8,500.00 |
$8,801.00 |
$10,450.00 |
$59,000.00 |
$19,570.00 |
$20,000.00 |
$5,000.00 |
| 360 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 4 | EA |
$1,814.00 |
$1,500.00 |
$1,750.00 |
$1,550.00 |
$1,500.00 |
$1,841.03 |
$1,545.00 |
$1,800.00 |
$2,000.00 |
| 370 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,460.00 |
$3,200.00 |
$3,400.00 |
$2,584.00 |
$3,200.00 |
$3,927.54 |
$3,296.00 |
$3,500.00 |
$3,700.00 |
| 380 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$500.00 |
$550.00 |
$103.50 |
$500.00 |
$613.68 |
$515.00 |
$520.00 |
$650.00 |
| 390 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 12 | SF |
$48.00 |
$50.00 |
$55.00 |
$25.80 |
$50.00 |
$61.37 |
$51.50 |
$60.00 |
$65.00 |
| 400 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 40 | LF |
$15.00 |
$10.00 |
$12.00 |
$20.70 |
$10.00 |
$12.27 |
$10.30 |
$15.00 |
$15.00 |
| 410 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$25.00 |
$25.00 |
$28.50 |
$25.80 |
$25.00 |
$30.68 |
$25.75 |
$35.00 |
$30.00 |
| 420 | 855(A)7201 |
(SP) TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,304 | LF |
$4.00 |
$2.25 |
$2.50 |
$2.05 |
$2.25 |
$2.76 |
$2.31 |
$3.00 |
$4.00 |
| 430 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,800 | SD |
$1.00 |
$0.5000 |
$0.6000 |
$0.8800 |
$0.5000 |
$0.6100 |
$0.5100 |
$0.5000 |
$0.5000 |
| 440 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,920 | SD |
$2.00 |
$0.7500 |
$0.9000 |
$1.55 |
$0.7500 |
$0.9200 |
$0.7700 |
$0.7500 |
$0.7500 |
| 450 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$3.00 |
$1.25 |
$1.40 |
$3.10 |
$1.25 |
$1.53 |
$1.28 |
$1.50 |
$1.25 |
| 460 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$2.00 |
$1.00 |
$1.10 |
$2.05 |
$1.00 |
$1.23 |
$1.03 |
$1.70 |
$1.00 |
| 470 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,400 | SD |
$1.00 |
$0.2500 |
$0.3500 |
$1.05 |
$0.2500 |
$0.3100 |
$0.2500 |
$0.3500 |
$0.2500 |
| 480 | 880(F)6700 |
DRUMS | 2,400 | SD |
$1.00 |
$0.1000 |
$0.2500 |
$0.1100 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.2000 |
$0.1000 |
| 490 | 880(G)6805 |
CHANNELIZER CONES | 2,400 | SD |
$1.00 |
$0.1000 |
$0.2500 |
$0.1100 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.1500 |
$0.1000 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$14,000.00 |
$11,540.00 |
$9,750.00 |
$5,574.17 |
$8,858.00 |
$10,000.00 |
$10,000.00 |
| 510 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$57,500.00 |
$52,500.00 |
$20,500.00 |
$54,169.41 |
$61,000.00 |
$59,000.00 |
$75,641.81 |
$50,000.00 |
$75,000.00 |