| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$14,325.56 |
$10,000.00 |
$21,928.96 |
$25,000.00 |
$225,000.00 |
$65,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 6,950 | CY |
$15.00 |
$9.35 |
$12.18 |
$6.00 |
$13.86 |
$20.00 |
$9.59 |
$25.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 100 | CY |
$100.00 |
$45.00 |
$163.90 |
$100.00 |
$26.99 |
$150.00 |
$236.25 |
$195.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 500 | CY |
$15.00 |
$5.00 |
$12.59 |
$15.00 |
$1.08 |
$15.00 |
$25.98 |
$35.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$6,670.43 |
$10,000.00 |
$7,327.75 |
$25,000.00 |
$5,514.00 |
$45,000.00 |
| 60 | 210 0100 |
OBLITERATING ABANDONED ROAD | 140 | LF |
$30.00 |
$11.00 |
$112.45 |
$50.00 |
$10.80 |
$50.00 |
$256.77 |
$65.00 |
| 70 | 221(B)2300 |
TEMPORARY SILT FENCE | 330 | LF |
$5.00 |
$3.30 |
$3.42 |
$2.99 |
$3.23 |
$3.30 |
$3.35 |
$15.00 |
| 80 | 221(E)2600 |
TEMPORARY SILT DIKE | 168 | LF |
$20.00 |
$11.00 |
$11.40 |
$9.95 |
$10.74 |
$15.00 |
$11.13 |
$25.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 8,743 | SY |
$5.00 |
$3.00 |
$2.85 |
$2.49 |
$2.69 |
$3.00 |
$2.78 |
$9.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 1.95 | AC |
$1,750.00 |
$1,000.00 |
$2,004.41 |
$1,750.00 |
$1,889.12 |
$2,000.00 |
$1,956.96 |
$1,500.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 632 | CY |
$90.00 |
$60.00 |
$66.36 |
$60.00 |
$59.84 |
$50.00 |
$64.63 |
$120.00 |
| 120 | 310(B)5300 |
SUBGRADE, METHOD B | 2,860 | SY |
$4.00 |
$3.74 |
$2.86 |
$3.00 |
$5.67 |
$7.00 |
$3.17 |
$4.00 |
| 130 | 325 0100 |
SEPARATOR FABRIC | 2,860 | SY |
$3.00 |
$3.85 |
$2.27 |
$2.20 |
$1.73 |
$3.00 |
$4.49 |
$4.80 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 127 | TON |
$55.00 |
$35.50 |
$84.29 |
$30.00 |
$53.85 |
$50.00 |
$43.82 |
$85.00 |
| 150 | 407(B)7300 |
TACK COAT | 189 | GAL |
$6.00 |
$5.50 |
$5.15 |
$2.75 |
$4.32 |
$3.20 |
$3.08 |
$5.50 |
| 160 | 408 8100 |
PRIME COAT | 829 | GAL |
$6.00 |
$5.75 |
$5.15 |
$7.75 |
$7.02 |
$9.00 |
$8.67 |
$5.50 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 713 | TON |
$130.00 |
$121.00 |
$103.97 |
$93.75 |
$121.98 |
$120.00 |
$104.85 |
$195.00 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 350 | TON |
$150.00 |
$149.50 |
$133.18 |
$123.75 |
$166.24 |
$160.00 |
$138.40 |
$195.00 |
| 190 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$700.00 |
$330.00 |
$611.07 |
$300.00 |
$1,281.64 |
$800.00 |
$1,118.43 |
$950.00 |
| 200 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 550 | TON |
$70.00 |
$48.00 |
$45.39 |
$50.00 |
$53.39 |
$65.00 |
$129.71 |
$80.00 |
| 210 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 275 | TON |
$60.00 |
$35.00 |
$32.70 |
$40.00 |
$39.99 |
$40.00 |
$59.07 |
$60.00 |
| 220 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 130 | LF |
$160.00 |
$149.00 |
$159.64 |
$90.00 |
$124.97 |
$175.00 |
$117.87 |
$115.00 |
| 230 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 200 | LF |
$90.00 |
$70.00 |
$83.21 |
$65.00 |
$68.99 |
$100.00 |
$68.96 |
$75.00 |
| 240 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$2,500.00 |
$1,400.00 |
$1,661.11 |
$3,000.00 |
$2,289.89 |
$1,700.00 |
$1,823.00 |
$2,200.00 |
| 250 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$5,500.00 |
$3,270.00 |
$2,418.02 |
$7,500.00 |
$1,596.69 |
$1,700.00 |
$3,193.00 |
$2,800.00 |
| 260 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$9,500.00 |
$9,055.88 |
$10,000.00 |
$5,397.50 |
$5,000.00 |
$50,000.00 |
$25,000.00 |
| 270 | 624(A)3200 |
FENCE-STYLE WWF | 1,053 | LF |
$12.00 |
$11.00 |
$11.11 |
$17.00 |
$10.47 |
$13.00 |
$15.10 |
$24.00 |
| 280 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 121 | LF |
$20.00 |
$10.00 |
$10.31 |
$15.00 |
$9.72 |
$13.00 |
$12.86 |
$15.85 |
| 290 | 624(D)3500 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,800.00 |
$2,000.00 |
$687.23 |
$1,200.00 |
$647.70 |
$1,250.00 |
$1,286.00 |
$650.00 |
| 300 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$30.00 |
$17.25 |
$44.80 |
$100.00 |
$23.90 |
$25.00 |
$44.74 |
$65.00 |
| 310 | 501(C)1400 |
SUBSTRUCTURE EXCAVATION ROCK | 50 | CY |
$120.00 |
$70.00 |
$45.52 |
$200.00 |
$49.97 |
$150.00 |
$235.99 |
$200.00 |
| 320 | 501(G)1800 |
CLSM BACKFILL | 56 | CY |
$300.00 |
$260.00 |
$225.00 |
$240.00 |
$202.17 |
$400.00 |
$229.68 |
$220.00 |
| 330 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 717 | LF |
$350.00 |
$307.50 |
$320.79 |
$360.00 |
$319.31 |
$315.00 |
$395.93 |
$780.00 |
| 340 | 504(A)5200 |
APPROACH SLAB | 115 | SY |
$310.00 |
$290.00 |
$268.37 |
$400.00 |
$347.26 |
$325.00 |
$235.91 |
$365.00 |
| 350 | 504(B)5300 |
SAW-CUT GROOVING | 667.1 | SY |
$7.00 |
$7.04 |
$7.33 |
$6.40 |
$6.91 |
$10.00 |
$7.16 |
$7.68 |
| 360 | 504(D)5410 |
CONCRETE RAIL (TR3) | 536.6 | LF |
$100.00 |
$106.00 |
$106.81 |
$130.00 |
$159.26 |
$125.00 |
$183.63 |
$210.00 |
| 370 | 506(A)7200 |
STRUCTURAL STEEL | 1,110 | LB |
$5.00 |
$4.50 |
$3.19 |
$7.00 |
$4.94 |
$5.00 |
$4.08 |
$6.60 |
| 380 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$2,600.00 |
$595.00 |
$433.20 |
$800.00 |
$604.82 |
$800.00 |
$562.00 |
$3,500.00 |
| 390 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$1,750.00 |
$1,350.00 |
$957.52 |
$1,600.00 |
$1,099.06 |
$1,100.00 |
$1,064.00 |
$3,500.00 |
| 400 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 12 | EA |
$2,000.00 |
$424.00 |
$646.20 |
$400.00 |
$709.85 |
$700.00 |
$631.00 |
$3,500.00 |
| 410 | 509(A)0210 |
CLASS AA CONCRETE | 201.5 | CY |
$1,000.00 |
$925.00 |
$947.63 |
$950.00 |
$1,541.66 |
$1,500.00 |
$1,495.62 |
$980.00 |
| 420 | 509(B)0320 |
CLASS A CONCRETE | 71 | CY |
$1,200.00 |
$985.00 |
$1,690.11 |
$1,050.00 |
$1,325.95 |
$1,000.00 |
$2,567.65 |
$1,450.00 |
| 430 | 511(A)2210 |
REINFORCING STEEL | 60,200 | LB |
$1.75 |
$1.31 |
$1.14 |
$1.50 |
$1.43 |
$2.00 |
$1.10 |
$2.65 |
| 440 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 288 | LF |
$55.00 |
$60.00 |
$52.38 |
$60.00 |
$90.24 |
$55.00 |
$44.36 |
$80.00 |
| 450 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 288 | LF |
$20.00 |
$15.00 |
$33.91 |
$30.00 |
$12.92 |
$40.00 |
$66.47 |
$80.00 |
| 460 | 514(K)6200 |
(PL)PILOT HOLES | 192 | LF |
$230.00 |
$350.00 |
$172.71 |
$150.00 |
$284.09 |
$375.00 |
$270.00 |
$350.00 |
| 470 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 480 | 516(A)8225 |
DRILLED SHAFTS 42" DIAMETER | 112 | LF |
$1,050.00 |
$1,275.00 |
$1,492.68 |
$1,000.00 |
$1,236.41 |
$1,100.00 |
$1,583.00 |
$1,830.00 |
| 490 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$3,000.00 |
$2,176.21 |
$3,000.00 |
$2,051.05 |
$7,500.00 |
$2,125.00 |
$2,500.00 |
| 500 | 517 9110 |
ELASTOMERIC COATING | 305 | SF |
$28.00 |
$36.00 |
$32.00 |
$28.00 |
$33.16 |
$32.00 |
$26.39 |
$31.20 |
| 510 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,300 | TON |
$70.00 |
$45.00 |
$45.39 |
$65.00 |
$39.77 |
$70.00 |
$129.70 |
$85.00 |
| 520 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 332 | TON |
$55.00 |
$35.00 |
$32.70 |
$60.00 |
$30.26 |
$55.00 |
$48.92 |
$65.00 |
| 530 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$52.25 |
$37.48 |
$60.00 |
$36.75 |
$35.00 |
$48.09 |
$24.00 |
| 540 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$40.00 |
$56.00 |
$37.48 |
$60.00 |
$28.76 |
$35.00 |
$54.10 |
$24.00 |
| 550 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,500.00 |
$4,322.32 |
$8,000.00 |
$23,970.29 |
$25,000.00 |
$75,000.00 |
$55,000.00 |
| 560 | 623(A)1210 |
BEAM GUARDRAIL W-BEAM SINGLE | 87.5 | LF |
$40.00 |
$29.70 |
$30.93 |
$27.00 |
$29.15 |
$32.00 |
$30.20 |
$32.40 |
| 570 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,500.00 |
$2,640.00 |
$2,748.90 |
$2,400.00 |
$2,590.80 |
$3,000.00 |
$2,684.00 |
$2,880.00 |
| 580 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$4,000.00 |
$4,840.00 |
$5,039.65 |
$4,400.00 |
$4,749.80 |
$5,000.00 |
$4,921.00 |
$5,280.00 |
| 590 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$500.00 |
$1,100.00 |
$1,145.38 |
$1,000.00 |
$1,079.50 |
$1,500.00 |
$1,118.00 |
$1,200.00 |
| 600 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 52.5 | SF |
$40.00 |
$44.00 |
$45.82 |
$40.00 |
$43.18 |
$50.00 |
$44.74 |
$48.00 |
| 610 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 100 | LF |
$15.00 |
$11.00 |
$11.45 |
$10.00 |
$10.80 |
$15.00 |
$11.18 |
$12.00 |
| 620 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$25.00 |
$55.00 |
$57.27 |
$50.00 |
$53.98 |
$65.00 |
$56.00 |
$60.00 |
| 630 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 4,200 | LF |
$1.25 |
$2.09 |
$2.18 |
$1.90 |
$2.05 |
$2.50 |
$2.13 |
$2.28 |
| 640 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,080 | SD |
$0.6000 |
$0.2800 |
$0.2900 |
$0.2500 |
$0.2700 |
$0.2500 |
$0.2800 |
$0.3000 |
| 650 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$1.00 |
$0.5500 |
$0.5700 |
$0.5000 |
$0.5400 |
$0.5000 |
$0.5600 |
$0.6000 |
| 660 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,080 | SD |
$2.00 |
$1.10 |
$1.15 |
$1.00 |
$1.08 |
$1.00 |
$1.12 |
$1.20 |
| 670 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,800 | SD |
$2.00 |
$1.38 |
$1.43 |
$1.25 |
$1.35 |
$1.25 |
$1.40 |
$1.50 |
| 680 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$0.7500 |
$0.8300 |
$0.8600 |
$0.7500 |
$0.8100 |
$0.7500 |
$0.8400 |
$0.9000 |
| 690 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$15,200.00 |
$13,152.47 |
$7,200.00 |
$14,249.40 |
$15,000.00 |
$17,994.87 |
$65,000.00 |
| 700 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$2,863.44 |
$4,000.00 |
$6,370.94 |
$3,500.00 |
$20,604.00 |
$6,500.00 |
| 710 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$120,000.00 |
$99,000.00 |
$100,407.79 |
$186,350.00 |
$68,818.13 |
$225,000.00 |
$140,000.00 |
$200,000.00 |