Bid tab 250179

Let Jul 10, 2025 · Division 8 · Ottawa

‹ Jul 2025 results

Bridge And Approaches

Let date
Thursday, July 10, 2025
Contract
250179 · job page
J/P numbers
33562(04)
District
Division 8
County
Ottawa
Highway
COUNTY ROAD (S 690 RD)
Limits
COUNTY ROAD (S 690 RD): OVER SYCAMORE CREEK
Classification
Bridge And Approaches ·
Project number
STP-258D(117)CI
Working days
180

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,993,134
1 K & R BUILDERS, INC. Low bidder $1,699,663 -14.7%
2 C3 Construction, Inc. $1,763,273 -11.5% +3.7%
3 B & B BRIDGE COMPANY, LLC $1,829,175 -8.2% +7.6%
5 Frontier Bridge, Inc. $1,898,079 -4.8% +11.7%
6 Built Right Construction, LLC $2,243,737 +12.6% +32.0%
7 Crossland Construction Company, Inc. $2,733,505 +37.1% +60.8%
8 Robinson Construction, LLC $3,170,732 +59.1% +86.6%

Bid tab: unit prices 71 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 K & R BUILDERS,…#2 C3 Construction…#3 B & B BRIDGE CO…#5 Frontier Bridge…#6 Built Right Con…#7 Crossland Const…#8 Robinson Constr…
10201(A)1200 CLEARING AND GRUBBING1LSUM $15,000.00 $15,000.00 $14,325.56 $10,000.00 $21,928.96 $25,000.00 $225,000.00 $65,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION6,950CY $15.00 $9.35 $12.18 $6.00 $13.86 $20.00 $9.59 $25.00
30202(C)2400 ROCK EXCAVATION100CY $100.00 $45.00 $163.90 $100.00 $26.99 $150.00 $236.25 $195.00
40202(D)2500 UNCLASSIFIED BORROW500CY $15.00 $5.00 $12.59 $15.00 $1.08 $15.00 $25.98 $35.00
50205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $10,000.00 $6,670.43 $10,000.00 $7,327.75 $25,000.00 $5,514.00 $45,000.00
60210 0100 OBLITERATING ABANDONED ROAD140LF $30.00 $11.00 $112.45 $50.00 $10.80 $50.00 $256.77 $65.00
70221(B)2300 TEMPORARY SILT FENCE330LF $5.00 $3.30 $3.42 $2.99 $3.23 $3.30 $3.35 $15.00
80221(E)2600 TEMPORARY SILT DIKE168LF $20.00 $11.00 $11.40 $9.95 $10.74 $15.00 $11.13 $25.00
90230(A)7200 SOLID SLAB SODDING8,743SY $5.00 $3.00 $2.85 $2.49 $2.69 $3.00 $2.78 $9.00
100233(A)0200 VEGETATIVE MULCHING1.95AC $1,750.00 $1,000.00 $2,004.41 $1,750.00 $1,889.12 $2,000.00 $1,956.96 $1,500.00
110303(A)1200 AGGREGATE BASE TYPE A632CY $90.00 $60.00 $66.36 $60.00 $59.84 $50.00 $64.63 $120.00
120310(B)5300 SUBGRADE, METHOD B2,860SY $4.00 $3.74 $2.86 $3.00 $5.67 $7.00 $3.17 $4.00
130325 0100 SEPARATOR FABRIC2,860SY $3.00 $3.85 $2.27 $2.20 $1.73 $3.00 $4.49 $4.80
140402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E127TON $55.00 $35.50 $84.29 $30.00 $53.85 $50.00 $43.82 $85.00
150407(B)7300 TACK COAT189GAL $6.00 $5.50 $5.15 $2.75 $4.32 $3.20 $3.08 $5.50
160408 8100 PRIME COAT829GAL $6.00 $5.75 $5.15 $7.75 $7.02 $9.00 $8.67 $5.50
170411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)713TON $130.00 $121.00 $103.97 $93.75 $121.98 $120.00 $104.85 $195.00
180411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)350TON $150.00 $149.50 $133.18 $123.75 $166.24 $160.00 $138.40 $195.00
190509(D)0500 CLASS C CONCRETE10CY $700.00 $330.00 $611.07 $300.00 $1,281.64 $800.00 $1,118.43 $950.00
200601(B)1220 TYPE I-A PLAIN RIPRAP550TON $70.00 $48.00 $45.39 $50.00 $53.39 $65.00 $129.71 $80.00
210601(C)1300 TYPE I-A FILTER BLANKET275TON $60.00 $35.00 $32.70 $40.00 $39.99 $40.00 $59.07 $60.00
220613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III130LF $160.00 $149.00 $159.64 $90.00 $124.97 $175.00 $117.87 $115.00
230613(EE)5969 18" CORRUGATED POLYPROPYLENE PIPE200LF $90.00 $70.00 $83.21 $65.00 $68.99 $100.00 $68.96 $75.00
240613(M)6960 TYPE A4 CULVERT END TREATMENT6EA $2,500.00 $1,400.00 $1,661.11 $3,000.00 $2,289.89 $1,700.00 $1,823.00 $2,200.00
250613(M)6984 TYPE BB4 CULVERT END TREATMENT2EA $5,500.00 $3,270.00 $2,418.02 $7,500.00 $1,596.69 $1,700.00 $3,193.00 $2,800.00
260619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $9,500.00 $9,055.88 $10,000.00 $5,397.50 $5,000.00 $50,000.00 $25,000.00
270624(A)3200 FENCE-STYLE WWF1,053LF $12.00 $11.00 $11.11 $17.00 $10.47 $13.00 $15.10 $24.00
280624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)121LF $20.00 $10.00 $10.31 $15.00 $9.72 $13.00 $12.86 $15.85
290624(D)3500 GATE, GALVANIZED STEEL1EA $1,800.00 $2,000.00 $687.23 $1,200.00 $647.70 $1,250.00 $1,286.00 $650.00
300501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $30.00 $17.25 $44.80 $100.00 $23.90 $25.00 $44.74 $65.00
310501(C)1400 SUBSTRUCTURE EXCAVATION ROCK50CY $120.00 $70.00 $45.52 $200.00 $49.97 $150.00 $235.99 $200.00
320501(G)1800 CLSM BACKFILL56CY $300.00 $260.00 $225.00 $240.00 $202.17 $400.00 $229.68 $220.00
330503(A)4230 PRESTRESSED CONCRETE BEAMS (TYPE III)717LF $350.00 $307.50 $320.79 $360.00 $319.31 $315.00 $395.93 $780.00
340504(A)5200 APPROACH SLAB115SY $310.00 $290.00 $268.37 $400.00 $347.26 $325.00 $235.91 $365.00
350504(B)5300 SAW-CUT GROOVING667.1SY $7.00 $7.04 $7.33 $6.40 $6.91 $10.00 $7.16 $7.68
360504(D)5410 CONCRETE RAIL (TR3)536.6LF $100.00 $106.00 $106.81 $130.00 $159.26 $125.00 $183.63 $210.00
370506(A)7200 STRUCTURAL STEEL1,110LB $5.00 $4.50 $3.19 $7.00 $4.94 $5.00 $4.08 $6.60
380507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $2,600.00 $595.00 $433.20 $800.00 $604.82 $800.00 $562.00 $3,500.00
390507(B)8310 WEATHERING STL EXP. BEARING ASSEMBLY12EA $1,750.00 $1,350.00 $957.52 $1,600.00 $1,099.06 $1,100.00 $1,064.00 $3,500.00
400507(C)8400 ELASTOMERIC BEARING PADS12EA $2,000.00 $424.00 $646.20 $400.00 $709.85 $700.00 $631.00 $3,500.00
410509(A)0210 CLASS AA CONCRETE201.5CY $1,000.00 $925.00 $947.63 $950.00 $1,541.66 $1,500.00 $1,495.62 $980.00
420509(B)0320 CLASS A CONCRETE71CY $1,200.00 $985.00 $1,690.11 $1,050.00 $1,325.95 $1,000.00 $2,567.65 $1,450.00
430511(A)2210 REINFORCING STEEL60,200LB $1.75 $1.31 $1.14 $1.50 $1.43 $2.00 $1.10 $2.65
440514(A)5210 PILES, FURNISHED (HP 10X42)288LF $55.00 $60.00 $52.38 $60.00 $90.24 $55.00 $44.36 $80.00
450514(B)5310 PILES, DRIVEN (HP 10X42)288LF $20.00 $15.00 $33.91 $30.00 $12.92 $40.00 $66.47 $80.00
460514(K)6200 (PL)PILOT HOLES192LF $230.00 $350.00 $172.71 $150.00 $284.09 $375.00 $270.00 $350.00
470514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 $500.00
480516(A)8225 DRILLED SHAFTS 42" DIAMETER112LF $1,050.00 $1,275.00 $1,492.68 $1,000.00 $1,236.41 $1,100.00 $1,583.00 $1,830.00
490516(C)8400 CROSSHOLE SONIC LOGGING1EA $3,000.00 $3,000.00 $2,176.21 $3,000.00 $2,051.05 $7,500.00 $2,125.00 $2,500.00
500517 9110 ELASTOMERIC COATING305SF $28.00 $36.00 $32.00 $28.00 $33.16 $32.00 $26.39 $31.20
510601(B)1230 TYPE I-A PLAIN RIPRAP2,300TON $70.00 $45.00 $45.39 $65.00 $39.77 $70.00 $129.70 $85.00
520601(C)1310 TYPE I-A FILTER BLANKET332TON $55.00 $35.00 $32.70 $60.00 $30.26 $55.00 $48.92 $65.00
530613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $40.00 $52.25 $37.48 $60.00 $36.75 $35.00 $48.09 $24.00
540613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $40.00 $56.00 $37.48 $60.00 $28.76 $35.00 $54.10 $24.00
550619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $12,500.00 $4,322.32 $8,000.00 $23,970.29 $25,000.00 $75,000.00 $55,000.00
560623(A)1210 BEAM GUARDRAIL W-BEAM SINGLE87.5LF $40.00 $29.70 $30.93 $27.00 $29.15 $32.00 $30.20 $32.40
570623(F)1724 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $3,500.00 $2,640.00 $2,748.90 $2,400.00 $2,590.80 $3,000.00 $2,684.00 $2,880.00
580623(G)1800 GUARDRAIL END TREATMENT (GET)3EA $4,000.00 $4,840.00 $5,039.65 $4,400.00 $4,749.80 $5,000.00 $4,921.00 $5,280.00
590805(A)3248 (PL)REMOVAL OF EXISTING SIGNS1LSUM $500.00 $1,100.00 $1,145.38 $1,000.00 $1,079.50 $1,500.00 $1,118.00 $1,200.00
600850(A)1200 SHEET ALUMINUM SIGNS52.5SF $40.00 $44.00 $45.82 $40.00 $43.18 $50.00 $44.74 $48.00
610851(C)2420 2 1/4" SQUARE TUBE POST100LF $15.00 $11.00 $11.45 $10.00 $10.80 $15.00 $11.18 $12.00
620853 5175 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)8EA $25.00 $55.00 $57.27 $50.00 $53.98 $65.00 $56.00 $60.00
630856(A)8203 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE)4,200LF $1.25 $2.09 $2.18 $1.90 $2.05 $2.50 $2.13 $2.28
640880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF10,080SD $0.6000 $0.2800 $0.2900 $0.2500 $0.2700 $0.2500 $0.2800 $0.3000
650880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,880SD $1.00 $0.5500 $0.5700 $0.5000 $0.5400 $0.5000 $0.5600 $0.6000
660880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,080SD $2.00 $1.10 $1.15 $1.00 $1.08 $1.00 $1.12 $1.20
670880(C)6410 CONSTRUCTION BARRICADES(TYPE III)1,800SD $2.00 $1.38 $1.43 $1.25 $1.35 $1.25 $1.40 $1.50
680880(E)6600 WARNING LIGHTS(TYPE A)3,600SD $0.7500 $0.8300 $0.8600 $0.7500 $0.8100 $0.7500 $0.8400 $0.9000
690642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $7,500.00 $15,200.00 $13,152.47 $7,200.00 $14,249.40 $15,000.00 $17,994.87 $65,000.00
700220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $4,000.00 $2,863.44 $4,000.00 $6,370.94 $3,500.00 $20,604.00 $6,500.00
710641 2100 MOBILIZATION1LSUM $120,000.00 $99,000.00 $100,407.79 $186,350.00 $68,818.13 $225,000.00 $140,000.00 $200,000.00