| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$18,900.00 |
$45,000.00 |
$25,500.00 |
$10,000.00 |
$37,502.52 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,114 | CY |
$14.00 |
$12.60 |
$13.05 |
$12.00 |
$17.00 |
$22.75 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 5,288 | CY |
$16.00 |
$15.75 |
$15.71 |
$14.00 |
$19.00 |
$22.75 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$21,500.00 |
$15,750.00 |
$7,146.07 |
$15,000.00 |
$30,000.00 |
$24,473.54 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,754 | LF |
$4.00 |
$3.41 |
$5.89 |
$3.25 |
$5.00 |
$3.61 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 77 | LF |
$20.00 |
$19.42 |
$22.09 |
$18.50 |
$20.00 |
$20.57 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 3,845 | SY |
$6.00 |
$7.29 |
$5.03 |
$8.40 |
$8.50 |
$7.73 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.8 | AC |
$2,200.00 |
$939.75 |
$1,000.00 |
$200.00 |
$3,500.00 |
$995.13 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 3,331 | SY |
$15.00 |
$13.12 |
$8.92 |
$21.15 |
$18.00 |
$28.38 |
| 100 | 326(B)1300 |
GEOGRID REINFORCEMENT | 2,130 | SY |
$8.00 |
$3.07 |
$1.81 |
$10.00 |
$14.00 |
$8.29 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 90 | TON |
$60.00 |
$39.43 |
$75.87 |
$42.00 |
$65.00 |
$66.19 |
| 120 | 407(B)7300 |
TACK COAT | 281 | GAL |
$6.00 |
$4.20 |
$6.84 |
$6.50 |
$7.00 |
$6.66 |
| 130 | 408 8100 |
PRIME COAT | 1,177 | GAL |
$8.00 |
$6.82 |
$6.84 |
$8.00 |
$7.00 |
$8.14 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 790 | TON |
$165.00 |
$114.45 |
$126.72 |
$125.35 |
$175.00 |
$153.32 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 458 | TON |
$180.00 |
$150.15 |
$132.38 |
$164.45 |
$175.00 |
$138.37 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 36 | CY |
$650.00 |
$630.00 |
$425.24 |
$485.00 |
$800.00 |
$1,067.61 |
| 170 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 256 | LF |
$160.00 |
$75.64 |
$176.03 |
$109.00 |
$150.00 |
$120.77 |
| 180 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 46 | LF |
$80.00 |
$51.31 |
$112.26 |
$53.00 |
$150.00 |
$97.68 |
| 190 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$2,400.00 |
$2,660.88 |
$1,744.72 |
$2,100.00 |
$5,000.00 |
$3,007.08 |
| 200 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$3,750.00 |
$3,739.08 |
$1,812.31 |
$3,300.00 |
$5,000.00 |
$3,007.04 |
| 210 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$10,500.00 |
$6,200.69 |
$23,500.00 |
$25,000.00 |
$5,590.43 |
| 220 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,153 | SY |
$12.00 |
$3.67 |
$3.86 |
$10.00 |
$15.00 |
$6.95 |
| 230 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 329 | LF |
$18.00 |
$10.50 |
$11.55 |
$20.00 |
$15.00 |
$8.26 |
| 240 | 619(B)6472 |
REMOVAL OF EXISTING SLAB | 332 | SY |
$30.00 |
$26.25 |
$11.45 |
$52.50 |
$20.00 |
$19.29 |
| 250 | 619(C)6600 |
SAWING PAVEMENT | 208 | LF |
$8.00 |
$8.40 |
$7.49 |
$6.33 |
$8.00 |
$21.70 |
| 260 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 65 | LF |
$45.00 |
$31.50 |
$36.81 |
$30.00 |
$36.00 |
$33.36 |
| 270 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 3 | EA |
$3,500.00 |
$2,625.00 |
$3,374.38 |
$2,500.00 |
$3,500.00 |
$2,779.69 |
| 280 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,200.00 |
$2,625.00 |
$2,147.33 |
$2,500.00 |
$3,500.00 |
$2,779.70 |
| 290 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 834 | LF |
$10.00 |
$9.45 |
$13.40 |
$10.92 |
$13.00 |
$18.39 |
| 300 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 420 | LF |
$14.00 |
$11.55 |
$15.73 |
$12.82 |
$15.00 |
$8.45 |
| 310 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$300.00 |
$105.00 |
$300.00 |
$100.00 |
$150.00 |
$111.19 |
| 320 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$250.00 |
$52.50 |
$250.00 |
$50.00 |
$75.00 |
$55.59 |
| 330 | 629(E)7600 |
MAILBOX | 1 | EA |
$250.00 |
$105.00 |
$250.00 |
$100.00 |
$150.00 |
$111.19 |
| 340 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$30.00 |
$52.50 |
$65.08 |
$16.30 |
$25.00 |
$73.84 |
| 350 | 501(G)1800 |
CLSM BACKFILL | 88 | CY |
$300.00 |
$331.30 |
$262.12 |
$250.00 |
$400.00 |
$633.68 |
| 360 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$350.00 |
$383.17 |
$385.01 |
$313.50 |
$325.00 |
$427.01 |
| 370 | 504(A)5200 |
APPROACH SLAB | 156.6 | SY |
$325.00 |
$251.02 |
$299.62 |
$310.00 |
$330.00 |
$233.15 |
| 380 | 504(B)5300 |
SAW-CUT GROOVING | 327.9 | SY |
$12.00 |
$10.08 |
$10.55 |
$8.60 |
$10.00 |
$9.56 |
| 390 | 504(D)5410 |
CONCRETE RAIL (TR3) | 233.3 | LF |
$125.00 |
$104.43 |
$105.39 |
$110.00 |
$135.00 |
$146.94 |
| 400 | 506(A)7200 |
STRUCTURAL STEEL | 320 | LB |
$6.50 |
$2.64 |
$3.59 |
$4.15 |
$10.00 |
$30.83 |
| 410 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,400.00 |
$1,994.09 |
$1,336.07 |
$1,525.00 |
$1,600.00 |
$5,432.27 |
| 420 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,650.00 |
$1,994.09 |
$1,336.07 |
$1,525.00 |
$1,600.00 |
$5,085.28 |
| 430 | 509(A)0210 |
CLASS AA CONCRETE | 65.9 | CY |
$850.00 |
$1,050.76 |
$1,180.33 |
$990.00 |
$1,450.00 |
$1,525.81 |
| 440 | 509(B)0320 |
CLASS A CONCRETE | 74.2 | CY |
$750.00 |
$1,050.76 |
$881.20 |
$1,050.00 |
$1,100.00 |
$1,340.91 |
| 450 | 511(A)2210 |
REINFORCING STEEL | 28,100 | LB |
$1.50 |
$1.71 |
$1.24 |
$1.32 |
$2.00 |
$3.98 |
| 460 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 96 | LF |
$60.00 |
$48.15 |
$50.60 |
$62.40 |
$55.00 |
$39.52 |
| 470 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 198 | LF |
$70.00 |
$60.45 |
$68.81 |
$73.60 |
$55.00 |
$47.31 |
| 480 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 96 | LF |
$25.00 |
$31.50 |
$82.23 |
$15.60 |
$55.00 |
$450.76 |
| 490 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 198 | LF |
$28.00 |
$31.50 |
$62.61 |
$18.40 |
$55.00 |
$373.26 |
| 500 | 514(K)6200 |
(PL)PILOT HOLES | 75 | LF |
$325.00 |
$330.15 |
$269.95 |
$392.50 |
$500.00 |
$318.74 |
| 510 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 520 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 420 | TON |
$75.00 |
$69.90 |
$73.06 |
$65.90 |
$90.00 |
$101.67 |
| 530 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 110 | TON |
$50.00 |
$60.59 |
$64.91 |
$55.30 |
$70.00 |
$123.94 |
| 540 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$40.00 |
$49.03 |
$16.25 |
$48.50 |
$35.00 |
$66.21 |
| 550 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 61 | LF |
$30.00 |
$49.03 |
$21.05 |
$48.50 |
$35.00 |
$65.31 |
| 560 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$200.00 |
$78.75 |
$184.06 |
$75.00 |
$100.00 |
$83.39 |
| 570 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$500.00 |
$262.50 |
$613.52 |
$250.00 |
$300.00 |
$277.97 |
| 580 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 10 | SF |
$55.00 |
$31.50 |
$72.40 |
$30.00 |
$40.00 |
$33.36 |
| 590 | 851(C)2415 |
2" SQUARE TUBE POST | 28 | LF |
$10.00 |
$12.60 |
$9.82 |
$12.00 |
$15.00 |
$13.34 |
| 600 | 856(A)8201 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 2,476 | LF |
$2.00 |
$2.62 |
$1.96 |
$2.50 |
$3.25 |
$2.78 |
| 610 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,040 | SD |
$1.00 |
$0.2600 |
$0.6100 |
$0.2500 |
$0.2500 |
$0.2800 |
| 620 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$1.75 |
$0.2600 |
$1.23 |
$0.2500 |
$0.2500 |
$0.2800 |
| 630 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 380 | SD |
$2.50 |
$0.2600 |
$4.29 |
$0.2500 |
$0.2500 |
$0.2800 |
| 640 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 510 | SD |
$2.00 |
$0.2600 |
$1.53 |
$0.2500 |
$0.2500 |
$0.2800 |
| 650 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 340 | SD |
$0.5000 |
$4.20 |
$1.23 |
$10.00 |
$4.00 |
$4.45 |
| 660 | 880(F)6700 |
DRUMS | 130 | SD |
$1.00 |
$0.2600 |
$0.3100 |
$0.2500 |
$0.2500 |
$0.2800 |
| 670 | 880(I)7000 |
FLAGGER | 10 | SD |
$300.00 |
$315.00 |
$8.08 |
$195.00 |
$5.00 |
$1,010.80 |
| 680 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$10,710.00 |
$14,090.30 |
$12,500.00 |
$12,500.00 |
$14,176.44 |
| 690 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,675.00 |
$3,067.61 |
$4,000.00 |
$3,500.00 |
$2,021.60 |
| 700 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$81,791.24 |
$82,000.00 |
$65,000.00 |
$160,000.00 |
$21,528.88 |